X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615211303000

Well Details

Well ID: 0615211303000
Loading map...
Location: 00/03-13-061-21W5/0
Location Alias: 00/03-13-61-21 W5M
Location Alias 2: 00/03-13-061-21 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 21
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: SOC KAYBOBS 3-13-61-21
Operator Name: AlphaBow Energy Ltd.
License Number: 0434489
License Date: 2011-06-20
License Status: Issued
Spud Date: 2011-08-09
Final Drill Date: 2011-08-29
Well Total Depth: 3261.00 m
Surface Hole Latitude: 54.282764
Surface Hole Longitude: -117.023670

For data sources see[1][2]

Well History

Date Event
2011-06-20 Obtained License
2011-08-12 Surface Casing Operation Performed
2011-08-16 Direction Drilling Operation Performed - Horizontal
2011-08-22 Intermediate Casing Operation Performed
2011-08-29 Finished Drilling
2011-08-29 Well Mode changed to Drilled and Cased
2011-08-31 Liner Casing Operation Performed
2011-08-31 Rig Released
2011-09-06 Well Log Performed
2011-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-25 Well Log Performed
2011-10-17 Well Began Production
2011-10-17 Well Fluid changed to Gas
2011-10-17 Well Mode changed to Flowing
2016-01-01 Well Fluid changed to Gas
2016-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-16 1684.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-20 Multi-Stage Fracture 3234.30 3234.40 0
2011-09-20 Multi-Stage Fracture 2310.60 2310.70 0
2011-09-20 Multi-Stage Fracture 2208.50 2208.60 0
2011-09-20 Multi-Stage Fracture 3174.40 3174.50 0
2011-09-20 Multi-Stage Fracture 3058.40 3058.50 0
2011-09-20 Multi-Stage Fracture 2947.70 2947.80 0
2011-09-20 Multi-Stage Fracture 2832.00 2832.10 0
2011-09-20 Multi-Stage Fracture 2757.60 2757.70 0
2011-09-20 Multi-Stage Fracture 2614.10 2614.20 0
2011-09-20 Multi-Stage Fracture 2525.70 2525.80 0
2011-09-20 Multi-Stage Fracture 2439.00 2439.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1759 0.0 0.0 0.0
2012 7523 0.0 0.0 0.0
2013 6982 0.0 0.0 0.0
2014 5679 0.0 0.0 0.0
2015 7641 0.0 0.0 0.0
2016 8613 0.0 0.0 0.0
2017 8206 0.0 0.0 0.0
2018 6333 0.0 0.0 0.0
2019 3861 0.0 0.0 0.0
2020 1440 0.0 0.0 0.0

For data sources see[6]

References