X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615233409020

Well Details

Well ID: 0615233409020
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 02/09-34-061-23W5/0
Location Alias: 02/09-34-61-23 W5M
Location Alias 2: 02/09-34-061-23 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 23
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: ATH HZ GRIZZLY 9-34-61-23
Operator Name: Athabasca Oil Corporation
License Number: 0454125
License Date: 2013-01-25
License Status: Issued
Spud Date: 2013-02-07
Final Drill Date: 2013-02-28
Well Total Depth: 4623.00 m
Surface Hole Latitude: 54.338778
Surface Hole Longitude: -117.349509

For data sources see[1][2]

Well History

Date Event
2013-01-25 Obtained License
2013-02-08 Surface Casing Operation Performed
2013-02-12 Direction Drilling Operation Performed - Deviate
2013-02-15 Direction Drilling Operation Performed - Horizontal
2013-02-28 Finished Drilling
2013-02-28 Well Mode changed to Drilled and Cased
2013-03-06 Production Casing Operation Performed
2013-03-07 Rig Released
2013-03-10 Perforation Treatment Performed - Open-Hole Completion
2013-03-12 Well Log Performed
2013-03-14 Well Began Production
2013-03-14 Well Fluid changed to Gas
2013-03-14 Well Mode changed to Pumping
2013-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-20 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-02-07 Horizon Drilling Inc. 10 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-02-12 2210.90 Deviate (5 - 79 degrees)
2013-02-15 2673.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-10 Open Hole/Barefoot Completion 4621.00 4623.00 0
2013-03-20 Multi-Stage Fracture 3417.00 3417.10 0
2013-03-20 Multi-Stage Fracture 3271.00 3271.10 0
2013-03-20 Multi-Stage Fracture 3111.00 3111.10 0
2013-03-20 Multi-Stage Fracture 2961.00 2961.10 0
2013-03-20 Multi-Stage Fracture 2825.00 2825.10 0
2013-03-17 Multi-Stage Fracture 4583.00 4583.10 0
2013-03-17 Multi-Stage Fracture 4456.00 4456.10 0
2013-03-18 Multi-Stage Fracture 4328.00 4328.10 0
2013-03-19 Multi-Stage Fracture 4196.00 4196.10 0
2013-03-19 Multi-Stage Fracture 4065.00 4065.10 0
2013-03-19 Multi-Stage Fracture 3934.00 3934.10 0
2013-03-19 Multi-Stage Fracture 3682.80 3682.90 0
2013-03-20 Multi-Stage Fracture 3524.00 3524.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-17 2013-03-20 2,535 1,837 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 12.501 N/A
N2 7727-37-9 100 20.7587 N/A
water 7732-18-5 100 28.411 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 16.6553 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 0.3749 N/A
SiberProp (20/40) Trican silica crystalline 14808-60-7 100 8.2775 N/A
FCB-1 Trican Breaker severely refined mineral oil Trade Secret 100 0.0307 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0866 N/A
water 7732-18-5 100 0.0866 N/A
AI-7NR Trican Corrosion Inhibitor modified propargyl alcohol Trade Secret 100 0.093 N/A
propargyl alcohol 107-19-7 100 0.093 N/A
IF- 1 Trican Corrosion Inhibitor cupric sulfate pentahydrate 7758-99-8 100 0.0093 N/A
IF- 2 Trican Corrosion Inhibitor potassium iodide 7681-11-0 100 0.0116 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0.0011 N/A
IC-5 Trican Iron Control sodium hypophosphite 7681-53-0 100 0.0581 N/A
FC-1 Trican Surfactant isopropanol 67-63-0 100 0.6301 N/A
N.N.N-dimethyl-1-octadecanamine 124-28-7 100 0.6301 N/A
N.N.N-dimethyl-1-octadecanamine-HCL Not Available 100 0.6301 N/A
N.N.N-trimethyl-1-octadecaminium chloride 112-03-8 100 0.6301 N/A
FC-2 Trican Surfactant organic salt 7947 100 0.5511 N/A
water 7732-18-5 100 0.5511 N/A
MS-6 Trican Surfactant non-hazardous ingredients Not Available 100 0.564 N/A
S-4W Trican Surfactant diethanolamine 111-42-2 100 0.0451 N/A
fatty acid alkanolamide 68603-42-9 100 0.0451 N/A
fatty acids. coco compounds with diethanamine Trade Secret 100 0.0451 N/A
methanol 67-56-1 100 0.0451 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-03-11 2013-03-21 Surface Water - Runoff 1157
2013-03-10 2013-03-11 Recycled Fracturing Water (treated at well site) 810

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 3991 0.0 0.0 0.0
2014 7556 0.0 0.0 0.0
2015 7907 0.0 0.0 0.0
2016 8551 0.0 0.0 0.0
2017 5854 0.0 0.0 0.0
2018 7436 0.0 0.0 0.0
2019 5704 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-06 No Incident Encountered 0.00 0.00
2013-04-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References

BESbswy