X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615261803000

Well Details

Well ID: 0615261803000
Loading map...
Location: 00/03-18-061-26W5/0
Location Alias: 00/03-18-61-26 W5M
Location Alias 2: 00/03-18-061-26 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 26
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE 3-24 HZ SIMON 3-18-61-26
Operator Name: Cequence Energy Ltd.
License Number: 0451188
License Date: 2012-11-30
License Status: Issued
Spud Date: 2012-12-04
Final Drill Date: 2013-01-04
Well Total Depth: 5260.00 m
Surface Hole Latitude: 54.284988
Surface Hole Longitude: -117.916453

For data sources see[1][2]

Well History

Date Event
2012-11-30 Obtained License
2012-12-06 Direction Drilling Operation Performed - Deviate
2012-12-08 Surface Casing Operation Performed
2012-12-13 Direction Drilling Operation Performed - Horizontal
2012-12-19 Well Log Performed
2012-12-21 Intermediate Casing Operation Performed
2012-12-22 Intermediate Casing Operation Performed
2013-01-04 Finished Drilling
2013-01-04 Well Log Performed
2013-01-04 Well Mode changed to Drilled and Cased
2013-01-06 Well Log Performed
2013-01-07 Liner Casing Operation Performed
2013-01-09 Rig Released
2013-01-11 Well Log Performed
2013-01-17 Perforation Treatment Performed - Open-Hole Completion
2013-01-18 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-19 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-21 Well Began Production
2013-01-21 Well Fluid changed to Gas
2013-01-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-12-05 Canelson Drilling Inc. 19 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-12-06 227.50 Deviate (5 - 79 degrees)
2012-12-13 3088.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-01-17 Open Hole/Barefoot Completion 5248.90 5260.00 0
2013-01-18 Multi-Stage Fracture 4467.40 4467.50 0
2013-01-18 Multi-Stage Fracture 4359.50 4359.60 0
2013-01-18 Multi-Stage Fracture 4235.30 4235.40 0
2013-01-18 Multi-Stage Fracture 4111.20 4111.30 0
2013-01-18 Multi-Stage Fracture 4013.50 4013.60 0
2013-01-18 Multi-Stage Fracture 3915.80 3915.90 0
2013-01-18 Multi-Stage Fracture 3738.70 3738.80 0
2013-01-19 Multi-Stage Fracture 3627.80 3627.90 0
2013-01-19 Multi-Stage Fracture 3504.00 3504.10 0
2013-01-19 Multi-Stage Fracture 3399.60 3399.70 0
2013-01-18 Multi-Stage Fracture 5224.40 5227.20 0
2013-01-19 Multi-Stage Fracture 3302.20 3302.30 0
2013-01-19 Multi-Stage Fracture 3204.90 3205.00 0
2013-01-19 Multi-Stage Fracture 3107.60 3107.70 0
2013-01-18 Multi-Stage Fracture 5166.70 5166.80 0
2013-01-18 Multi-Stage Fracture 5055.60 5055.70 0
2013-01-18 Multi-Stage Fracture 4958.10 4958.20 0
2013-01-18 Multi-Stage Fracture 4873.50 4873.60 0
2013-01-18 Multi-Stage Fracture 4762.70 4762.80 0
2013-01-18 Multi-Stage Fracture 4665.20 4665.30 0
2013-01-18 Multi-Stage Fracture 4568.00 4568.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-01-18 2013-01-19 2,978 6,205 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.3741 N/A
30/50 Prime Plus Calfrac Quartz 14808-60-7 100 1.4023 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.2132 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.4007 N/A
Tolcide PS75LT Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0118 N/A
Water 7732-18-5 100 0.0121 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0766 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0894 N/A
Ethoxylated phenolic resin 8300 100 0.0903 N/A
Isobutyl ketone 8300 100 0.0896 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0966 N/A
Organic acid salts 1 8300 100 0.0894 N/A
Organic acid salts 2 8300 100 0.0902 N/A
Organic acid salts 3 8300 100 0.0903 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 3.3399 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0923 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-01-13 2013-01-19 Surface Water - River 2508
2013-01-12 2013-01-18 Recycled Fracturing Water (treated at well site) 46
2013-01-12 2013-01-12 Recycled Fracturing Water (treated at well site) 150
2013-01-11 2013-01-19 Groundwater - Non-saline less than or equal to 150m deep 347
2013-01-12 2013-01-18 Surface Water - River 2402
2013-01-12 2013-01-18 Recycled Fracturing Water (treated at well site) 222
2013-01-11 2013-01-12 Municipal Water 273
2013-01-13 2013-01-13 Recycled Fracturing Water (treated at well site) 58
2013-01-13 2013-01-13 Recycled Fracturing Water (treated at well site) 11
2013-01-11 2013-01-18 Oilfield Produced Water 150
2013-01-11 2013-01-12 Oilfield Produced Water 55

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 7847 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 7799 0.0 0.0 0.0
2016 8592 0.0 0.0 0.0
2017 7968 0.0 0.0 0.0
2018 8591 0.0 0.0 0.0
2019 8520 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-09 No Incident Encountered 0.00 0.00
2013-01-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References