If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615261803000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.284988,"lon":-117.916453,"icon":""}]} |
Location: 00/03-18-061-26W5/0 | |
Location Alias: 00/03-18-61-26 W5M | |
Location Alias 2: 00/03-18-061-26 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 26 | |
Section: 18 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE 3-24 HZ SIMON 3-18-61-26 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0451188 | |
License Date: 2012-11-30 | |
License Status: Issued | |
Spud Date: 2012-12-04 | |
Final Drill Date: 2013-01-04 | |
Well Total Depth: 5260.00 m | |
Surface Hole Latitude: 54.284988 | |
Surface Hole Longitude: -117.916453 |
Date | Event |
---|---|
2012-11-30 | Obtained License |
2012-12-06 | Direction Drilling Operation Performed - Deviate |
2012-12-08 | Surface Casing Operation Performed |
2012-12-13 | Direction Drilling Operation Performed - Horizontal |
2012-12-19 | Well Log Performed |
2012-12-21 | Intermediate Casing Operation Performed |
2012-12-22 | Intermediate Casing Operation Performed |
2013-01-04 | Finished Drilling |
2013-01-04 | Well Log Performed |
2013-01-04 | Well Mode changed to Drilled and Cased |
2013-01-06 | Well Log Performed |
2013-01-07 | Liner Casing Operation Performed |
2013-01-09 | Rig Released |
2013-01-11 | Well Log Performed |
2013-01-17 | Perforation Treatment Performed - Open-Hole Completion |
2013-01-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-21 | Well Began Production |
2013-01-21 | Well Fluid changed to Gas |
2013-01-21 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-12-05 | Canelson Drilling Inc. | 19 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-12-06 | 227.50 | Deviate (5 - 79 degrees) |
2012-12-13 | 3088.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-01-17 | Open Hole/Barefoot Completion | 5248.90 | 5260.00 | 0 |
2013-01-18 | Multi-Stage Fracture | 4467.40 | 4467.50 | 0 |
2013-01-18 | Multi-Stage Fracture | 4359.50 | 4359.60 | 0 |
2013-01-18 | Multi-Stage Fracture | 4235.30 | 4235.40 | 0 |
2013-01-18 | Multi-Stage Fracture | 4111.20 | 4111.30 | 0 |
2013-01-18 | Multi-Stage Fracture | 4013.50 | 4013.60 | 0 |
2013-01-18 | Multi-Stage Fracture | 3915.80 | 3915.90 | 0 |
2013-01-18 | Multi-Stage Fracture | 3738.70 | 3738.80 | 0 |
2013-01-19 | Multi-Stage Fracture | 3627.80 | 3627.90 | 0 |
2013-01-19 | Multi-Stage Fracture | 3504.00 | 3504.10 | 0 |
2013-01-19 | Multi-Stage Fracture | 3399.60 | 3399.70 | 0 |
2013-01-18 | Multi-Stage Fracture | 5224.40 | 5227.20 | 0 |
2013-01-19 | Multi-Stage Fracture | 3302.20 | 3302.30 | 0 |
2013-01-19 | Multi-Stage Fracture | 3204.90 | 3205.00 | 0 |
2013-01-19 | Multi-Stage Fracture | 3107.60 | 3107.70 | 0 |
2013-01-18 | Multi-Stage Fracture | 5166.70 | 5166.80 | 0 |
2013-01-18 | Multi-Stage Fracture | 5055.60 | 5055.70 | 0 |
2013-01-18 | Multi-Stage Fracture | 4958.10 | 4958.20 | 0 |
2013-01-18 | Multi-Stage Fracture | 4873.50 | 4873.60 | 0 |
2013-01-18 | Multi-Stage Fracture | 4762.70 | 4762.80 | 0 |
2013-01-18 | Multi-Stage Fracture | 4665.20 | 4665.30 | 0 |
2013-01-18 | Multi-Stage Fracture | 4568.00 | 4568.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-01-18 | 2013-01-19 | 2,978 | 6,205 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.3741 | N/A | |||
30/50 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 1.4023 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 11.2132 | N/A | ||
50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.4007 | N/A | ||
Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0118 | N/A | |
Water | 7732-18-5 | 100 | 0.0121 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0766 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0894 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0903 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0896 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0966 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0894 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0902 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0903 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 3.3399 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0923 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-01-13 | 2013-01-19 | Surface Water - River | 2508 |
2013-01-12 | 2013-01-18 | Recycled Fracturing Water (treated at well site) | 46 |
2013-01-12 | 2013-01-12 | Recycled Fracturing Water (treated at well site) | 150 |
2013-01-11 | 2013-01-19 | Groundwater - Non-saline less than or equal to 150m deep | 347 |
2013-01-12 | 2013-01-18 | Surface Water - River | 2402 |
2013-01-12 | 2013-01-18 | Recycled Fracturing Water (treated at well site) | 222 |
2013-01-11 | 2013-01-12 | Municipal Water | 273 |
2013-01-13 | 2013-01-13 | Recycled Fracturing Water (treated at well site) | 58 |
2013-01-13 | 2013-01-13 | Recycled Fracturing Water (treated at well site) | 11 |
2013-01-11 | 2013-01-18 | Oilfield Produced Water | 150 |
2013-01-11 | 2013-01-12 | Oilfield Produced Water | 55 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 7847 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 7799 | 0.0 | 0.0 | 0.0 |
2016 | 8592 | 0.0 | 0.0 | 0.0 |
2017 | 7968 | 0.0 | 0.0 | 0.0 |
2018 | 8591 | 0.0 | 0.0 | 0.0 |
2019 | 8520 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-01-09 | No Incident Encountered | 0.00 | 0.00 |
2013-01-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]