If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0615262102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.302528,"lon":-117.860224,"icon":""}]} |
| Location: 00/02-21-061-26W5/0 | |
| Location Alias: 00/02-21-61-26 W5M | |
| Location Alias 2: 00/02-21-061-26 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 5 | |
| Range: 26 | |
| Section: 21 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: CEQUENCE 7-29 HZ SIMON 2-21-61-26 | |
| Operator Name: Cequence Energy Ltd. | |
| License Number: 0459339 | |
| License Date: 2013-09-13 | |
| License Status: Suspension | |
| Spud Date: 2013-11-16 | |
| Final Drill Date: 2013-12-15 | |
| Well Total Depth: 5642.00 m | |
| Surface Hole Latitude: 54.302528 | |
| Surface Hole Longitude: -117.860224 |
| Date | Event |
|---|---|
| 2013-09-13 | Obtained License |
| 2013-11-18 | Surface Casing Operation Performed |
| 2013-11-20 | Direction Drilling Operation Performed - Deviate |
| 2013-11-29 | Direction Drilling Operation Performed - Horizontal |
| 2013-11-29 | Well Log Performed |
| 2013-12-01 | Intermediate Casing Operation Performed |
| 2013-12-15 | Finished Drilling |
| 2013-12-15 | Well Log Performed |
| 2013-12-15 | Well Mode changed to Drilled and Cased |
| 2013-12-20 | Liner Casing Operation Performed |
| 2013-12-20 | Rig Released |
| 2013-12-22 | Well Log Performed |
| 2013-12-31 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-01-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-01-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-02-03 | Well Began Production |
| 2014-02-03 | Well Fluid changed to Gas |
| 2014-02-03 | Well Mode changed to Flowing |
| 2017-02-28 | Well Fluid changed to Gas |
| 2017-02-28 | Well Mode changed to Suspended |
| 2018-10-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2018-10-25 | Plug Back Performed |
| 2018-10-25 | Well Log Performed |
| 2018-10-26 | Well Log Performed |
| 2018-10-28 | Perforation Treatment Performed - Cement Plug |
| 2018-10-28 | Plug Back Performed |
| 2018-10-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2018-10-29 | Perforation Treatment Performed - Jet Perforation |
| 2018-10-29 | Plug Back Performed |
| 2018-10-29 | Well Log Performed |
| 2018-10-31 | Well Log Performed |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-11-16 | Canelson Drilling Inc. | 19 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-11-20 | 750.70 | Deviate (5 - 79 degrees) |
| 2013-11-29 | 3121.80 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-12-31 | Open Hole/Barefoot Completion | 5635.30 | 5642.00 | 0 |
| 2018-10-29 | Packing Device Capped w/Cement | 2572.00 | 2575.00 | 0 |
| 2018-10-29 | Perforation | 2510.00 | 2540.00 | 17 |
| 2014-01-01 | Multi-Stage Fracture | 5598.20 | 5599.30 | 0 |
| 2014-01-08 | Multi-Stage Fracture | 4475.70 | 4475.80 | 0 |
| 2014-01-26 | Multi-Stage Fracture | 3506.60 | 3506.70 | 0 |
| 2014-01-26 | Multi-Stage Fracture | 3418.30 | 3418.40 | 0 |
| 2014-01-26 | Multi-Stage Fracture | 3316.30 | 3316.40 | 0 |
| 2014-01-26 | Multi-Stage Fracture | 3213.90 | 3214.00 | 0 |
| 2018-10-25 | Packing Device Capped w/Cement | 3063.80 | 3127.00 | 0 |
| 2018-10-28 | Cement Plug | 2906.40 | 3063.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-01-01 | 2014-01-26 | 2,986 | 2,133 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 78.0609 | N/A | |||
| 30/50 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 2.6954 | N/A | ||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 11.2994 | N/A | ||
| 50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 2.506 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0065 | N/A | |
| Water | 7732-18-5 | 100 | 0.0069 | N/A | ||||
| DWP-975 | Calfrac | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0035 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0069 | N/A | ||||
| DWP-107 | Calfrac | Buffer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.005 | N/A | |
| Organic acid | 8454 | 100 | 0.005 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0267 | N/A | |
| DWP-937 | Calfrac | Demulsifier | Citrus terpenes | 94266-47-4 | 100 | 0.0292 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0295 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0292 | N/A | ||||
| Triethylene glycol | 112-27-6 | 100 | 0.0295 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0294 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 5.3033 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0328 | N/A | |
| DWP-101 | Calfrac | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0319 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0318 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-02-02 | 2014-02-08 | Oilfield Produced Water | 296 |
| 2014-01-14 | 2014-02-10 | Municipal Water | 167 |
| 2014-01-28 | 2014-02-10 | Recycled Fracturing Water (treated at well site) | 443 |
| 2014-02-08 | 2014-02-09 | Recycled Fracturing Water (treated at well site) | 120 |
| 2014-02-06 | 2014-02-06 | Recycled Fracturing Water (treated at well site) | 7 |
| 2013-12-29 | 2014-02-07 | Recycled Fracturing Water (treated at well site) | 3051 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 6239 | 0.0 | 0.0 | 0.0 |
| 2015 | 528 | 0.0 | 0.0 | 0.0 |
| 2016 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-12-20 | No Incident Encountered | 0.00 | 0.00 |
| 2014-02-07 | No Incident Encountered | 0.00 | 0.00 |
| 2018-11-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]