X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615262102002

Well Details

Well ID: 0615262102002
Loading map...
Location: 00/02-21-061-26W5/2
Location Alias: 00/02-21-61-26 W5M
Location Alias 2: 00/02-21-061-26 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 26
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE 7-29 HZ SIMON 2-21-61-26
Operator Name: Cequence Energy Ltd.
License Number: 0459339
License Date: 2013-09-13
License Status: Suspension
Spud Date: 2013-11-16
Final Drill Date: 2013-12-15
Well Total Depth: 5642.00 m
Surface Hole Latitude: 54.302528
Surface Hole Longitude: -117.860224

For data sources see[1][2]

Well History

Date Event
2013-09-13 Obtained License
2013-11-18 Surface Casing Operation Performed
2013-11-20 Direction Drilling Operation Performed - Deviate
2013-11-29 Direction Drilling Operation Performed - Horizontal
2013-11-29 Well Log Performed
2013-12-01 Intermediate Casing Operation Performed
2013-12-15 Finished Drilling
2013-12-15 Well Log Performed
2013-12-15 Well Mode changed to Drilled and Cased
2013-12-20 Liner Casing Operation Performed
2013-12-20 Rig Released
2013-12-22 Well Log Performed
2013-12-31 Perforation Treatment Performed - Open-Hole Completion
2014-01-01 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-25 Plug Back Performed
2018-10-25 Well Log Performed
2018-10-26 Well Log Performed
2018-10-28 Perforation Treatment Performed - Cement Plug
2018-10-28 Plug Back Performed
2018-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-29 Perforation Treatment Performed - Jet Perforation
2018-10-29 Plug Back Performed
2018-10-29 Well Log Performed
2018-10-31 Well Log Performed
2018-12-01 Well Began Injection
2018-12-01 Well Fluid changed to Water
2018-12-01 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-11-20 750.70 Deviate (5 - 79 degrees)
2013-11-29 3121.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-12-31 Open Hole/Barefoot Completion 5635.30 5642.00 0
2018-10-29 Packing Device Capped w/Cement 2572.00 2575.00 0
2018-10-29 Perforation 2510.00 2540.00 17
2014-01-01 Multi-Stage Fracture 5598.20 5599.30 0
2014-01-08 Multi-Stage Fracture 4475.70 4475.80 0
2014-01-26 Multi-Stage Fracture 3506.60 3506.70 0
2014-01-26 Multi-Stage Fracture 3418.30 3418.40 0
2014-01-26 Multi-Stage Fracture 3316.30 3316.40 0
2014-01-26 Multi-Stage Fracture 3213.90 3214.00 0
2018-10-25 Packing Device Capped w/Cement 3063.80 3127.00 0
2018-10-28 Cement Plug 2906.40 3063.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-12-20 No Incident Encountered 0.00 0.00
2014-02-07 No Incident Encountered 0.00 0.00
2018-11-16 No Incident Encountered 0.00 0.00

For data sources see[7]

References