X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615262701002

Well Details

Well ID: 0615262701002
Loading map...
Location: 00/01-27-061-26W5/2
Location Alias: 00/01-27-61-26 W5M
Location Alias 2: 00/01-27-061-26 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 26
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE 15-15 HZ SIMON 1-27-61-26
Operator Name: Cequence Energy Ltd.
License Number: 0470905
License Date: 2014-10-27
License Status: Issued
Spud Date: 2014-12-16
Final Drill Date: 2015-01-30
Well Total Depth: 5278.00 m
Surface Hole Latitude: 54.281801
Surface Hole Longitude: -117.808130

For data sources see[1][2]

Well History

Date Event
2014-10-27 Obtained License
2014-12-17 Surface Casing Operation Performed
2014-12-30 Direction Drilling Operation Performed - Deviate
2015-01-09 Intermediate Casing Operation Performed
2015-01-10 Direction Drilling Operation Performed - Horizontal
2015-01-24 Direction Drilling Operation Performed - Horizontal
2015-01-24 Direction Drilling Operation Performed - Sidetrack Fish
2015-01-29 Well Log Performed
2015-01-30 Finished Drilling
2015-01-30 Well Mode changed to Drilled and Cased
2015-02-02 Liner Casing Operation Performed
2015-02-03 Rig Released
2015-02-05 Perforation Treatment Performed - Open-Hole Completion
2015-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-17 Well Began Production
2015-02-17 Well Fluid changed to Gas
2015-02-17 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-12-30 1785.40 Deviate (5 - 79 degrees)
2015-01-10 3106.90 Horizontal
2015-01-24 4365.00 Sidetrack fish
2015-01-24 4365.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-05 Open Hole/Barefoot Completion 5267.00 5268.00 0
2015-02-13 Multi-Stage Fracture 4596.10 4596.20 0
2015-02-13 Multi-Stage Fracture 4511.00 4511.10 0
2015-02-13 Multi-Stage Fracture 4426.30 4426.40 0
2015-02-13 Multi-Stage Fracture 4341.60 4341.70 0
2015-02-13 Multi-Stage Fracture 4256.50 4256.60 0
2015-02-13 Multi-Stage Fracture 4172.40 4172.50 0
2015-02-13 Multi-Stage Fracture 4088.10 4088.20 0
2015-02-13 Multi-Stage Fracture 4003.20 4003.30 0
2015-02-13 Multi-Stage Fracture 3919.40 3919.50 0
2015-02-13 Multi-Stage Fracture 3835.10 3835.20 0
2015-02-12 Multi-Stage Fracture 5244.90 5245.00 0
2015-02-13 Multi-Stage Fracture 3750.10 3750.20 0
2015-02-13 Multi-Stage Fracture 3665.00 3665.10 0
2015-02-13 Multi-Stage Fracture 3580.10 3580.20 0
2015-02-13 Multi-Stage Fracture 3495.40 3495.50 0
2015-02-13 Multi-Stage Fracture 3410.20 3410.30 0
2015-02-13 Multi-Stage Fracture 3325.30 3325.40 0
2015-02-13 Multi-Stage Fracture 3240.10 3240.20 0
2015-02-13 Multi-Stage Fracture 3155.10 3155.20 0
2015-02-12 Multi-Stage Fracture 5184.20 5184.30 0
2015-02-12 Multi-Stage Fracture 5101.50 5101.60 0
2015-02-12 Multi-Stage Fracture 5017.20 5017.30 0
2015-02-12 Multi-Stage Fracture 4932.30 4932.40 0
2015-02-12 Multi-Stage Fracture 4848.30 4848.40 0
2015-02-13 Multi-Stage Fracture 4764.40 4764.50 0
2015-02-13 Multi-Stage Fracture 4680.40 4680.50 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-12 2015-02-13 2,944 8,006 N/A
2 2015-02-13 2015-02-13 2,944 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 76.5763 N/A
30/50 Prime Plus Calfrac Quartz 14808-60-7 100 2.4844 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 16.2773 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 2.5091 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0162 N/A
Water 7732-18-5 100 0.0165 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0676 N/A
DWP-937 Calfrac Demulsifier Citrus terpenes 94266-47-4 100 0.0511 N/A
Isopropanol 67-63-0 100 0.0515 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0511 N/A
Triethylene glycol 112-27-6 100 0.0515 N/A
Water 7732-18-5 100 0.0513 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 2.3089 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0803 N/A
2 20/40 SB Excel Calfrac Quartz 14808-60-7 100 2.5271 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-09-14 2014-09-30 Surface Water - River 8547

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7128 0.0 0.0 0.0
2016 8316 0.0 0.0 0.0
2017 8687 0.0 0.0 0.0
2018 8636 0.0 0.0 0.0
2019 7035 0.0 0.0 0.0
2020 2036 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-03 No Incident Encountered 0.00 0.00
2015-02-26 No Incident Encountered 0.00 0.00

For data sources see[9]

References