If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615273613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.323581,"lon":-117.924643,"icon":""}]} |
Location: 00/13-36-061-27W5/0 | |
Location Alias: 00/13-36-61-27 W5M | |
Location Alias 2: 00/13-36-061-27 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 27 | |
Section: 36 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CAL WANYAN 13-36-61-27 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0427087 | |
License Date: 2010-12-07 | |
License Status: Amended | |
Spud Date: 2010-12-30 | |
Final Drill Date: 2011-01-11 | |
Well Total Depth: 3010.00 m | |
Surface Hole Latitude: 54.323581 | |
Surface Hole Longitude: -117.924643 |
Date | Event |
---|---|
2010-12-07 | Obtained License |
2010-12-30 | Well Log Performed |
2011-01-02 | Surface Casing Operation Performed |
2011-01-11 | Finished Drilling |
2011-01-11 | Well Mode changed to Drilled and Cased |
2011-01-12 | Well Log Performed |
2011-01-14 | Production Casing Operation Performed |
2011-01-15 | Rig Released |
2011-02-10 | Perforation Treatment Performed - Jet Perforation |
2011-02-14 | Perforation Treatment Performed - Fractured |
2011-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-15 | Perforation Treatment Performed - Jet Perforation |
2011-02-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-17 | Well Fluid changed to Gas |
2011-02-17 | Well Mode changed to Testing |
2011-05-02 | Well Began Production |
2011-05-02 | Well Fluid changed to Gas |
2011-05-02 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-10 | Perforation | 2720.50 | 2721.50 | 2 |
2011-02-16 | Multi-Stage Fracture | 2552.00 | 2553.00 | 0 |
2011-02-16 | Multi-Stage Fracture | 2544.00 | 2545.00 | 0 |
2011-02-16 | Multi-Stage Fracture | 2536.00 | 2537.00 | 0 |
2011-02-10 | Perforation | 2682.00 | 2683.00 | 8 |
2011-02-14 | Fracture | 2720.50 | 2721.50 | 0 |
2011-02-14 | Multi-Stage Fracture | 2682.00 | 2683.00 | 0 |
2011-02-15 | Perforation | 2559.00 | 2560.00 | 4 |
2011-02-15 | Perforation | 2552.00 | 2553.00 | 4 |
2011-02-15 | Perforation | 2544.00 | 2545.00 | 4 |
2011-02-15 | Perforation | 2536.00 | 2537.00 | 4 |
2011-02-16 | Multi-Stage Fracture | 2559.00 | 2560.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5410 | 0.0 | 0.0 | 0.0 |
2012 | 7392 | 0.0 | 0.0 | 0.0 |
2013 | 3239 | 0.0 | 0.0 | 0.0 |
2014 | 5856 | 0.0 | 0.0 | 0.0 |
2015 | 240 | 0.0 | 0.0 | 0.0 |
2017 | 2453 | 0.0 | 0.0 | 0.0 |
2018 | 2379 | 0.0 | 0.0 | 0.0 |
2019 | 840 | 0.0 | 0.0 | 0.0 |
For data sources see[5]