X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616011816002

Well Details

Well ID: 0616011816002
Loading map...
Location: 00/16-18-061-01W6/2
Location Alias: 00/16-18-61-01 W6M
Location Alias 2: 00/16-18-061-01 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 01
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE RESTHA 16-18-61-1
Operator Name: Cequence Energy Ltd.
License Number: 0442317
License Date: 2012-01-05
License Status: Amended
Spud Date: 2012-07-15
Final Drill Date: 2012-08-15
Well Total Depth: 4550.00 m
Surface Hole Latitude: 54.281718
Surface Hole Longitude: -118.103858

For data sources see[1][2]

Well History

Date Event
2012-01-05 Obtained License
2012-07-18 Surface Casing Operation Performed
2012-07-25 Direction Drilling Operation Performed - Deviate
2012-08-04 Intermediate Casing Operation Performed
2012-08-06 Direction Drilling Operation Performed - Deviate
2012-08-07 Direction Drilling Operation Performed - Horizontal
2012-08-15 Finished Drilling
2012-08-15 Well Log Performed
2012-08-15 Well Mode changed to Drilled and Cased
2012-08-22 Liner Casing Operation Performed
2012-08-23 Rig Released
2012-08-31 Perforation Treatment Performed - Open-Hole Completion
2012-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-09 Well Began Production
2012-09-09 Well Fluid changed to Gas
2012-09-09 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-07-25 2642.30 Deviate (5 - 79 degrees)
2012-08-06 2973.00 Deviate (5 - 79 degrees)
2012-08-07 2979.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-31 Open Hole/Barefoot Completion 4539.50 4550.00 0
2012-09-05 Multi-Stage Fracture 3737.90 3738.00 0
2012-09-05 Multi-Stage Fracture 3639.70 3639.80 0
2012-09-05 Multi-Stage Fracture 3554.80 3554.90 0
2012-09-05 Multi-Stage Fracture 3469.90 3470.00 0
2012-09-05 Multi-Stage Fracture 3385.00 3385.10 0
2012-09-05 Multi-Stage Fracture 3233.50 3233.60 0
2012-09-05 Multi-Stage Fracture 3042.00 3042.10 0
2012-09-04 Multi-Stage Fracture 4430.30 4430.40 0
2012-09-04 Multi-Stage Fracture 4345.40 4345.50 0
2012-09-04 Multi-Stage Fracture 4260.50 4260.60 0
2012-09-04 Multi-Stage Fracture 4175.70 4175.80 0
2012-09-04 Multi-Stage Fracture 4090.80 4090.90 0
2012-09-04 Multi-Stage Fracture 4005.90 4006.00 0
2012-09-04 Multi-Stage Fracture 3921.10 3921.20 0
2012-09-05 Multi-Stage Fracture 3836.20 3836.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2250 0.0 0.0 0.0
2013 8685 0.0 0.0 0.0
2014 7967 0.0 0.0 0.0
2015 7752 0.0 0.0 0.0
2016 8111 0.0 0.0 0.0
2017 8733 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 8639 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-25 No Incident Encountered 0.00 0.00
2012-08-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References