X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616012313002

Well Details

Well ID: 0616012313002
Loading map...
Location: 00/13-23-061-01W6/2
Location Alias: 00/13-23-61-01 W6M
Location Alias 2: 00/13-23-061-01 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 01
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE ET AL HZ WANYAN 13-23-61-1
Operator Name: Cequence Energy Ltd.
License Number: 0437877
License Date: 2011-10-21
License Status: Amended
Spud Date: 2011-10-23
Final Drill Date: 2011-12-05
Well Total Depth: 4238.00 m
Surface Hole Latitude: 54.299730
Surface Hole Longitude: -118.075469

For data sources see[1][2]

Well History

Date Event
2011-10-21 Obtained License
2011-11-21 Direction Drilling Operation Performed - Horizontal
2011-11-26 Intermediate Casing Operation Performed
2011-12-05 Finished Drilling
2011-12-05 Well Mode changed to Drilled and Cased
2011-12-08 Liner Casing Operation Performed
2011-12-09 Rig Released
2011-12-16 Well Log Performed
2011-12-19 Perforation Treatment Performed - Open-Hole Completion
2011-12-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-21 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-22 Well Began Production
2011-12-22 Well Fluid changed to Gas
2011-12-22 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-21 2142.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-19 Open Hole/Barefoot Completion 4179.00 4235.00 0
2011-12-20 Multi-Stage Fracture 3424.40 3424.50 0
2011-12-21 Multi-Stage Fracture 3312.80 3312.90 0
2011-12-21 Multi-Stage Fracture 3201.30 3201.40 0
2011-12-21 Multi-Stage Fracture 3103.10 3103.20 0
2011-12-21 Multi-Stage Fracture 2964.80 2964.90 0
2011-12-21 Multi-Stage Fracture 2759.90 2760.00 0
2011-12-21 Multi-Stage Fracture 2648.30 2648.40 0
2011-12-20 Multi-Stage Fracture 4211.60 4212.60 0
2011-12-20 Multi-Stage Fracture 4125.20 4125.30 0
2011-12-20 Multi-Stage Fracture 4026.90 4027.00 0
2011-12-20 Multi-Stage Fracture 3928.70 3928.80 0
2011-12-20 Multi-Stage Fracture 3830.50 3830.60 0
2011-12-20 Multi-Stage Fracture 3732.30 3732.40 0
2011-12-20 Multi-Stage Fracture 3620.80 3620.90 0
2011-12-20 Multi-Stage Fracture 3522.60 3522.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 180 0.0 0.0 0.0
2012 7991 0.0 0.0 0.0
2013 5952 0.0 0.0 0.0
2014 8615 0.0 0.0 0.0
2015 7344 0.0 0.0 0.0
2016 7751 0.0 0.0 0.0
2017 8135 0.0 0.0 0.0
2018 8447 0.0 0.0 0.0
2019 8280 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

References