If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616020707003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.255573,"lon":-118.284643,"icon":""}]} |
Location: 00/07-07-061-02W6/3 | |
Location Alias: 00/07-07-61-02 W6M | |
Location Alias 2: 00/07-07-061-02 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 02 | |
Section: 07 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CVE RESTHA 7-7-61-2 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0247861 | |
License Date: 2000-12-21 | |
License Status: Suspension | |
Spud Date: 2001-01-16 | |
Final Drill Date: 2001-07-29 | |
Well Total Depth: 4205.00 m | |
Surface Hole Latitude: 54.255573 | |
Surface Hole Longitude: -118.284643 |
Date | Event |
---|---|
2000-12-21 | Obtained License |
2001-01-20 | Surface Casing Operation Performed |
2001-02-03 | Direction Drilling Operation Performed - Deviate |
2001-03-03 | Well Log Performed |
2001-03-07 | Well Log Performed |
2001-03-09 | Well Log Performed |
2001-03-11 | Production Casing Operation Performed |
2001-03-12 | Rig Released |
2001-07-02 | Well Log Performed |
2001-07-16 | Well Log Performed |
2001-07-18 | Liner Casing Operation Performed |
2001-07-19 | Well Log Performed |
2001-07-27 | Well Log Performed |
2001-07-29 | Finished Drilling |
2001-07-29 | Perforation Treatment Performed - Open-Hole Completion |
2001-07-29 | Well Mode changed to Drilled and Cased |
2003-07-07 | Well Log Performed |
2003-07-08 | Perforation Treatment Performed - Jet Perforation |
2003-07-11 | Perforation Treatment Performed - Fractured |
2003-07-16 | Well Log Performed |
2003-07-17 | Perforation Treatment Performed - Jet Perforation |
2003-07-19 | Perforation Treatment Performed - Fractured |
2004-04-23 | Well Began Production |
2004-04-23 | Well Fluid changed to Gas |
2004-04-23 | Well Mode changed to Flowing |
2004-05-01 | Well Fluid changed to Gas |
2004-05-01 | Well Mode changed to Pumping |
2006-10-26 | Perforation Treatment Performed - Jet Perforation |
2006-11-01 | Perforation Treatment Performed - Fractured |
2006-11-11 | Perforation Treatment Performed - Fractured |
2008-10-01 | Well Fluid changed to Gas |
2008-10-01 | Well Mode changed to Suspended |
2015-12-03 | Well Log Performed |
2015-12-05 | Well Log Performed |
2015-12-06 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2001-02-03 | 2505.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-07-29 | Open Hole/Barefoot Completion | 4085.00 | 4205.00 | 0 |
2006-10-26 | Perforation | 3378.50 | 3379.50 | 17 |
2006-10-26 | Perforation | 3372.50 | 3374.50 | 17 |
2006-10-26 | Perforation | 3363.00 | 3364.00 | 17 |
2006-11-01 | Fracture | 3363.00 | 3397.50 | 0 |
2006-11-11 | Fracture | 3363.00 | 3397.50 | 0 |
2003-07-08 | Perforation | 3130.00 | 3135.00 | 17 |
2003-07-08 | Perforation | 3140.00 | 3144.00 | 17 |
2003-07-11 | Fracture | 3130.00 | 3144.00 | 0 |
2003-07-17 | Perforation | 2853.00 | 2859.00 | 17 |
2003-07-19 | Fracture | 2853.00 | 2859.00 | 0 |
2006-10-26 | Perforation | 3396.00 | 3397.50 | 17 |
2006-10-26 | Perforation | 3391.50 | 3392.50 | 17 |
2006-10-26 | Perforation | 3387.50 | 3388.50 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 4158 | 0.0 | 0.0 | 0.0 |
2005 | 224 | 0.0 | 0.0 | 0.0 |
For data sources see[6]