If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616021102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.257836,"lon":-118.161111,"icon":""}]} |
| Location: 00/02-11-061-02W6/0 | |
| Location Alias: 00/02-11-61-02 W6M | |
| Location Alias 2: 00/02-11-061-02 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 02 | |
| Section: 11 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: CEQUENCE 2-12 HZ RESTHA 2-11-61-2 | |
| Operator Name: Cequence Energy Ltd. | |
| License Number: 0472734 | |
| License Date: 2014-12-05 | |
| License Status: Issued | |
| Spud Date: 2014-12-15 | |
| Final Drill Date: 2015-01-15 | |
| Well Total Depth: 4150.00 m | |
| Surface Hole Latitude: 54.257836 | |
| Surface Hole Longitude: -118.161111 |
| Date | Event |
|---|---|
| 2014-12-05 | Obtained License |
| 2014-12-18 | Surface Casing Operation Performed |
| 2015-01-02 | Direction Drilling Operation Performed - Deviate |
| 2015-01-05 | Intermediate Casing Operation Performed |
| 2015-01-06 | Direction Drilling Operation Performed - Horizontal |
| 2015-01-13 | Well Log Performed |
| 2015-01-15 | Finished Drilling |
| 2015-01-15 | Well Mode changed to Drilled and Cased |
| 2015-01-16 | Liner Casing Operation Performed |
| 2015-01-17 | Rig Released |
| 2015-01-21 | Perforation Treatment Performed - Open-Hole Completion |
| 2015-02-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-02-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-02-17 | Well Began Production |
| 2015-02-17 | Well Fluid changed to Gas |
| 2015-02-17 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-12-15 | Canelson Drilling Inc. | 38 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-01-02 | 2356.70 | Deviate (5 - 79 degrees) |
| 2015-01-06 | 2703.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-01-21 | Open Hole/Barefoot Completion | 4145.00 | 4150.00 | 0 |
| 2015-02-09 | Multi-Stage Fracture | 3577.10 | 3577.20 | 0 |
| 2015-02-09 | Multi-Stage Fracture | 3504.80 | 3504.90 | 0 |
| 2015-02-09 | Multi-Stage Fracture | 3434.60 | 3434.70 | 0 |
| 2015-02-10 | Multi-Stage Fracture | 3363.40 | 3363.50 | 0 |
| 2015-02-10 | Multi-Stage Fracture | 3292.30 | 3292.40 | 0 |
| 2015-02-10 | Multi-Stage Fracture | 3220.20 | 3220.30 | 0 |
| 2015-02-10 | Multi-Stage Fracture | 3148.50 | 3148.60 | 0 |
| 2015-02-10 | Multi-Stage Fracture | 3076.30 | 3076.40 | 0 |
| 2015-02-10 | Multi-Stage Fracture | 3007.10 | 3007.20 | 0 |
| 2015-02-10 | Multi-Stage Fracture | 2923.00 | 2923.10 | 0 |
| 2015-02-09 | Multi-Stage Fracture | 4122.20 | 4122.30 | 0 |
| 2015-02-10 | Multi-Stage Fracture | 2837.50 | 2837.60 | 0 |
| 2015-02-10 | Multi-Stage Fracture | 2751.90 | 2752.00 | 0 |
| 2015-02-09 | Multi-Stage Fracture | 4074.10 | 4074.20 | 0 |
| 2015-02-09 | Multi-Stage Fracture | 4004.80 | 4004.90 | 0 |
| 2015-02-09 | Multi-Stage Fracture | 3932.70 | 3932.80 | 0 |
| 2015-02-09 | Multi-Stage Fracture | 3860.40 | 3860.50 | 0 |
| 2015-02-09 | Multi-Stage Fracture | 3789.00 | 3789.10 | 0 |
| 2015-02-09 | Multi-Stage Fracture | 3718.30 | 3718.40 | 0 |
| 2015-02-09 | Multi-Stage Fracture | 3648.10 | 3648.20 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-02-09 | 2015-02-10 | 2,591 | 3,716 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 79.9447 | N/A | |||
| 30/50 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 2.1702 | N/A | ||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 15.1898 | N/A | ||
| 50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 0.4346 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0134 | N/A | |
| Water | 7732-18-5 | 100 | 0.0139 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0766 | N/A | |
| DWP-937 | Calfrac | Demulsifier | Citrus terpenes | 94266-47-4 | 100 | 0.0814 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0821 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0814 | N/A | ||||
| Triethylene glycol | 112-27-6 | 100 | 0.0821 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0817 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 2.4074 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0917 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-09-19 | 2014-09-20 | Surface Water - River | 4500 |
| 2014-07-31 | 2014-08-09 | Recycled Fracturing Water (treated at well site) | 1321 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 6785 | 0.0 | 0.0 | 0.0 |
| 2016 | 8304 | 0.0 | 0.0 | 0.0 |
| 2017 | 8549 | 0.0 | 0.0 | 0.0 |
| 2018 | 8423 | 0.0 | 0.0 | 0.0 |
| 2019 | 8328 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-01-17 | No Incident Encountered | 0.00 | 0.00 |
| 2015-02-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]