X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616032602002

Well Details

Well ID: 0616032602002
Loading map...
Location: 00/02-26-061-03W6/2
Location Alias: 00/02-26-61-03 W6M
Location Alias 2: 00/02-26-061-03 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 03
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ JAYAR 2-26-61-3
Operator Name: XTO Energy Canada ULC
License Number: 0441438
License Date: 2011-12-15
License Status: Amended
Spud Date: 2012-02-10
Final Drill Date: 2012-04-19
Well Total Depth: 4939.00 m
Surface Hole Latitude: 54.312106
Surface Hole Longitude: -118.332895

For data sources see[1][2]

Well History

Date Event
2011-12-15 Obtained License
2012-02-10 Well Log Performed
2012-03-27 Direction Drilling Operation Performed - Horizontal
2012-04-02 Well Log Performed
2012-04-19 Finished Drilling
2012-04-19 Well Log Performed
2012-04-19 Well Mode changed to Drilled and Cased
2012-04-23 Liner Casing Operation Performed
2012-04-23 Perforation Treatment Performed - Open-Hole Completion
2012-04-24 Rig Released
2012-06-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-03 Well Began Production
2012-07-03 Well Fluid changed to Gas
2012-07-03 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-03-27 3300.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-23 Open Hole/Barefoot Completion 4932.40 4939.00 0
2012-06-30 Multi-Stage Fracture 4118.80 4120.40 0
2012-06-30 Multi-Stage Fracture 4024.90 4026.60 0
2012-06-30 Multi-Stage Fracture 3903.00 3904.60 0
2012-06-30 Multi-Stage Fracture 3796.90 3798.60 0
2012-06-30 Multi-Stage Fracture 3717.30 3719.00 0
2012-06-30 Multi-Stage Fracture 3609.30 3611.00 0
2012-06-30 Multi-Stage Fracture 3543.80 3545.50 0
2012-06-28 Multi-Stage Fracture 4921.20 4923.80 0
2012-06-28 Multi-Stage Fracture 4854.70 4856.30 0
2012-06-28 Multi-Stage Fracture 4748.70 4750.30 0
2012-06-29 Multi-Stage Fracture 4656.80 4658.40 0
2012-06-29 Multi-Stage Fracture 4552.70 4554.40 0
2012-06-29 Multi-Stage Fracture 4460.00 4461.60 0
2012-06-29 Multi-Stage Fracture 4339.90 4341.60 0
2012-06-29 Multi-Stage Fracture 4219.90 4221.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3184 0.0 0.0 0.0
2013 6026 0.0 0.0 0.0
2014 6933 0.0 0.0 0.0
2015 5422 0.0 0.0 0.0
2016 5820 0.0 0.0 0.0
2017 6133 0.0 0.0 0.0
2018 4125 0.0 0.0 0.0
2019 13 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-23 No Incident Encountered 0.00 0.00
2012-06-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References