X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616051401000

Well Details

Well ID: 0616051401000
Loading map...
Location: 00/01-14-061-05W6/0
Location Alias: 00/01-14-61-05 W6M
Location Alias 2: 00/01-14-061-05 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ KAKWA 1-14-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0456986
License Date: 2013-05-16
License Status: Amended
Spud Date: 2015-01-14
Final Drill Date: 2015-03-02
Well Total Depth: 5613.00 m
Surface Hole Latitude: 54.286709
Surface Hole Longitude: -118.654494

For data sources see[1][2]

Well History

Date Event
2013-05-16 Obtained License
2015-01-17 Surface Casing Operation Performed
2015-01-25 Intermediate Casing Operation Performed
2015-01-30 Direction Drilling Operation Performed - Deviate
2015-02-03 Well Log Performed
2015-02-05 Direction Drilling Operation Performed - Horizontal
2015-03-02 Finished Drilling
2015-03-02 Well Mode changed to Drilled and Cased
2015-03-05 Production Casing Operation Performed
2015-03-07 Rig Released
2015-07-22 Well Log Performed
2015-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-15 Well Fluid changed to Gas
2015-09-15 Well Mode changed to Testing
2015-10-20 Well Began Production
2015-10-20 Well Fluid changed to Gas
2015-10-20 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-01-14 Horizon Drilling Inc. 40 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-30 2851.00 Deviate (5 - 79 degrees)
2015-02-05 3242.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-23 Multi-Stage Fracture 5587.00 5587.10 0
2015-08-25 Multi-Stage Fracture 4784.70 4784.80 0
2015-08-25 Multi-Stage Fracture 4701.30 4701.40 0
2015-08-25 Multi-Stage Fracture 4593.10 4593.20 0
2015-08-26 Multi-Stage Fracture 4496.80 4496.90 0
2015-08-26 Multi-Stage Fracture 4401.30 4401.40 0
2015-08-26 Multi-Stage Fracture 4304.50 4304.60 0
2015-08-26 Multi-Stage Fracture 4219.80 4219.90 0
2015-08-26 Multi-Stage Fracture 4123.40 4123.50 0
2015-08-26 Multi-Stage Fracture 4039.70 4039.80 0
2015-08-26 Multi-Stage Fracture 3943.10 3943.20 0
2015-08-23 Multi-Stage Fracture 5499.60 5499.70 0
2015-08-27 Multi-Stage Fracture 3860.50 3860.60 0
2015-08-27 Multi-Stage Fracture 3765.50 3765.60 0
2015-08-27 Multi-Stage Fracture 3670.20 3670.30 0
2015-08-27 Multi-Stage Fracture 3588.20 3588.30 0
2015-08-27 Multi-Stage Fracture 3479.80 3479.90 0
2015-08-27 Multi-Stage Fracture 3384.60 3384.70 0
2015-08-27 Multi-Stage Fracture 3264.20 3264.30 0
2015-08-23 Multi-Stage Fracture 5415.70 5415.80 0
2015-08-23 Multi-Stage Fracture 5319.40 5319.50 0
2015-08-23 Multi-Stage Fracture 5236.00 5236.10 0
2015-08-24 Multi-Stage Fracture 5150.90 5151.00 0
2015-08-24 Multi-Stage Fracture 5052.30 5052.40 0
2015-08-24 Multi-Stage Fracture 4966.60 4966.70 0
2015-08-24 Multi-Stage Fracture 4868.90 4869.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-23 2015-08-27 3,142 16,756 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 86.5756 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 3.3316 N/A
silica crystalline 14808-60-7 100 3.3316 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 9.1627 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.6867 N/A
Myacide GA-50 Trican Bactericide/Biocide glutaraldehyde 111-30-8 100 0.0105 N/A
non-hazardous ingredients Not Available 100 0.0105 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1867 N/A
water Not Available 100 0.1867 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0451 N/A
propylene glycol 57-55-6 100 0.0451 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0916 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0916 N/A
non-hazardous ingredients Not Available 100 0.0916 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-22 2015-08-27 Surface Water - Runoff 9859
2015-08-22 2015-08-27 Surface Water - Runoff 6457
2015-08-22 2015-08-27 Recycled Fracturing Water (treated at well site) 214
2015-08-22 2015-08-27 Recycled Fracturing Water (treated at well site) 275

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2265 0.0 0.0 0.0
2016 8666 0.0 0.0 0.0
2017 5801 0.0 0.0 0.0
2018 7589 0.0 0.0 0.0
2019 8532 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-05 No Incident Encountered 0.00 0.00
2015-09-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References