X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616051613000

Well Details

Well ID: 0616051613000
Loading map...
Location: 00/13-16-061-05W6/0
Location Alias: 00/13-16-61-05 W6M
Location Alias 2: 00/13-16-061-05 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA KAKWA 13-16-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0419208
License Date: 2010-03-11
License Status: Issued
Spud Date: 2010-05-28
Final Drill Date: 2010-06-29
Well Total Depth: 4726.00 m
Surface Hole Latitude: 54.274013
Surface Hole Longitude: -118.677033

For data sources see[1][2]

Well History

Date Event
2010-03-11 Obtained License
2010-05-29 Lost Circulation Occurred
2010-06-01 Surface Casing Operation Performed
2010-06-07 Intermediate Casing Operation Performed
2010-06-09 Direction Drilling Operation Performed - Horizontal
2010-06-29 Finished Drilling
2010-06-29 Well Mode changed to Drilled and Cased
2010-06-30 Well Log Performed
2010-07-02 Production Casing Operation Performed
2010-07-04 Rig Released
2010-07-17 Well Log Performed
2010-08-09 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-08-09 Perforation Treatment Performed - Fractured
2010-08-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-08-10 Perforation Treatment Performed - Fractured
2010-08-11 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-08-12 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-08-12 Perforation Treatment Performed - Fractured
2010-08-13 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-08-13 Perforation Treatment Performed - Fractured
2010-08-14 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-08-14 Perforation Treatment Performed - Fractured
2010-08-15 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-08-15 Perforation Treatment Performed - Fractured
2010-08-16 Well Fluid changed to Gas
2010-08-16 Well Mode changed to Testing
2010-08-19 Well Began Production
2010-08-19 Well Fluid changed to Gas
2010-08-19 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-06-09 2926.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-09 Hydra Jet Perforation 4705.00 4705.10 0
2010-08-11 Hydra Jet Perforation 4388.00 4388.10 0
2010-08-11 Hydra Jet Perforation 4387.00 4387.10 0
2010-08-12 Hydra Jet Perforation 4287.00 4287.10 0
2010-08-12 Hydra Jet Perforation 4286.00 4286.10 0
2010-08-12 Fracture 4286.00 4287.10 0
2010-08-13 Hydra Jet Perforation 4187.00 4187.10 0
2010-08-13 Hydra Jet Perforation 4186.00 4186.10 0
2010-08-13 Fracture 4186.00 4187.10 0
2010-08-13 Hydra Jet Perforation 4098.00 4098.10 0
2010-08-13 Hydra Jet Perforation 4097.00 4097.10 0
2010-08-09 Fracture 4705.00 4705.10 0
2010-08-13 Hydra Jet Perforation 4047.00 4047.10 0
2010-08-13 Hydra Jet Perforation 4046.00 4046.10 0
2010-08-13 Hydra Jet Perforation 3947.00 3947.10 0
2010-08-13 Hydra Jet Perforation 3946.00 3946.10 0
2010-08-13 Fracture 3946.00 3947.10 0
2010-08-13 Hydra Jet Perforation 3857.00 3857.10 0
2010-08-13 Hydra Jet Perforation 3856.00 3856.10 0
2010-08-13 Fracture 3856.00 3857.10 0
2010-08-14 Hydra Jet Perforation 3767.00 3767.10 0
2010-08-14 Hydra Jet Perforation 3766.00 3766.10 0
2010-08-10 Hydra Jet Perforation 4615.00 4615.10 0
2010-08-14 Fracture 3766.00 3767.10 0
2010-08-14 Hydra Jet Perforation 3677.00 3677.10 0
2010-08-14 Hydra Jet Perforation 3676.00 3676.10 0
2010-08-14 Fracture 3676.00 3677.10 0
2010-08-14 Hydra Jet Perforation 3587.00 3587.10 0
2010-08-14 Hydra Jet Perforation 3586.00 3586.10 0
2010-08-14 Fracture 3586.00 3587.10 0
2010-08-14 Hydra Jet Perforation 3497.00 3497.10 0
2010-08-14 Hydra Jet Perforation 3496.00 3496.10 0
2010-08-15 Fracture 3496.00 3497.10 0
2010-08-10 Hydra Jet Perforation 4594.30 4594.40 0
2010-08-15 Hydra Jet Perforation 3387.00 3387.10 0
2010-08-15 Hydra Jet Perforation 3386.00 3386.10 0
2010-08-15 Fracture 3386.00 3387.10 0
2010-08-15 Hydra Jet Perforation 3297.00 3297.10 0
2010-08-15 Hydra Jet Perforation 3296.00 3296.10 0
2010-08-15 Fracture 3296.00 3297.10 0
2010-08-10 Fracture 4594.30 4594.40 0
2010-08-10 Hydra Jet Perforation 4500.00 4500.10 0
2010-08-10 Hydra Jet Perforation 4490.00 4490.10 0
2010-08-11 Hydra Jet Perforation 4440.00 4440.10 0
2010-08-11 Hydra Jet Perforation 4438.00 4438.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 3016 0.0 0.0 0.0
2011 8593 0.0 0.0 0.0
2012 8671 0.0 0.0 0.0
2013 8031 0.0 0.0 0.0
2014 8210 0.0 0.0 0.0
2015 8056 0.0 0.0 0.0
2016 7081 0.0 0.0 0.0
2017 7112 0.0 0.0 0.0
2018 7322 0.0 0.0 0.0
2019 8426 0.0 0.0 0.0
2020 1940 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-05-29 Lost Circulation 121.00 178.00

For data sources see[7]

References