If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616051615020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.290146,"lon":-118.706539,"icon":""}]} |
| Location: 02/15-16-061-05W6/0 | |
| Location Alias: 02/15-16-61-05 W6M | |
| Location Alias 2: 02/15-16-061-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 16 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: JUPITER 102 KAKWA 15-16-61-5 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0432946 | |
| License Date: 2011-04-08 | |
| License Status: Issued | |
| Spud Date: 2011-07-13 | |
| Final Drill Date: 2011-08-26 | |
| Well Total Depth: 4916.00 m | |
| Surface Hole Latitude: 54.290146 | |
| Surface Hole Longitude: -118.706539 |
| Date | Event |
|---|---|
| 2011-04-08 | Obtained License |
| 2011-07-14 | Direction Drilling Operation Performed - Horizontal |
| 2011-07-18 | Surface Casing Operation Performed |
| 2011-07-27 | Intermediate Casing Operation Performed |
| 2011-07-28 | Direction Drilling Operation Performed - Horizontal |
| 2011-08-03 | Well Log Performed |
| 2011-08-26 | Finished Drilling |
| 2011-08-26 | Well Mode changed to Drilled and Cased |
| 2011-08-27 | Production Casing Operation Performed |
| 2011-08-29 | Rig Released |
| 2011-10-09 | Well Log Performed |
| 2011-10-20 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2011-10-21 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2011-10-21 | Perforation Treatment Performed - Fractured |
| 2011-10-22 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2011-10-22 | Perforation Treatment Performed - Fractured |
| 2011-10-23 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2011-10-23 | Perforation Treatment Performed - Fractured |
| 2011-10-24 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2011-10-24 | Perforation Treatment Performed - Fractured |
| 2011-10-26 | Well Fluid changed to Gas |
| 2011-10-26 | Well Mode changed to Testing |
| 2011-10-31 | Well Began Production |
| 2011-10-31 | Well Fluid changed to Gas |
| 2011-10-31 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-07-14 | 170.00 | Horizontal |
| 2011-07-28 | 2906.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-10-20 | Hydra Jet Perforation | 4877.00 | 4877.10 | 0 |
| 2011-10-21 | Fracture | 4711.40 | 4711.50 | 0 |
| 2011-10-21 | Fracture | 4587.10 | 4587.20 | 0 |
| 2011-10-22 | Hydra Jet Perforation | 4296.00 | 4296.10 | 0 |
| 2011-10-22 | Hydra Jet Perforation | 4202.00 | 4202.10 | 0 |
| 2011-10-22 | Hydra Jet Perforation | 4180.00 | 4180.10 | 0 |
| 2011-10-22 | Hydra Jet Perforation | 4114.50 | 4114.60 | 0 |
| 2011-10-22 | Hydra Jet Perforation | 4033.00 | 4033.10 | 0 |
| 2011-10-22 | Fracture | 4388.00 | 4388.10 | 0 |
| 2011-10-22 | Fracture | 4296.00 | 4296.10 | 0 |
| 2011-10-22 | Fracture | 4180.00 | 4180.10 | 0 |
| 2011-10-20 | Hydra Jet Perforation | 4864.80 | 4864.90 | 0 |
| 2011-10-22 | Fracture | 4114.50 | 4114.60 | 0 |
| 2011-10-23 | Hydra Jet Perforation | 3940.00 | 3940.10 | 0 |
| 2011-10-23 | Hydra Jet Perforation | 3849.00 | 3849.10 | 0 |
| 2011-10-23 | Hydra Jet Perforation | 3756.80 | 3756.90 | 0 |
| 2011-10-23 | Hydra Jet Perforation | 3663.80 | 3663.90 | 0 |
| 2011-10-23 | Hydra Jet Perforation | 3569.00 | 3569.10 | 0 |
| 2011-10-23 | Hydra Jet Perforation | 3455.00 | 3455.10 | 0 |
| 2011-10-23 | Fracture | 4033.00 | 4033.10 | 0 |
| 2011-10-23 | Fracture | 3940.00 | 3940.10 | 0 |
| 2011-10-23 | Fracture | 3849.00 | 3849.10 | 0 |
| 2011-10-20 | Hydra Jet Perforation | 4811.00 | 4811.10 | 0 |
| 2011-10-23 | Fracture | 3756.80 | 3756.90 | 0 |
| 2011-10-23 | Fracture | 3663.80 | 3663.90 | 0 |
| 2011-10-23 | Fracture | 3569.00 | 3569.10 | 0 |
| 2011-10-24 | Hydra Jet Perforation | 3348.00 | 3348.10 | 0 |
| 2011-10-24 | Hydra Jet Perforation | 3232.00 | 3232.10 | 0 |
| 2011-10-24 | Hydra Jet Perforation | 3221.00 | 3221.10 | 0 |
| 2011-10-24 | Fracture | 3455.00 | 3455.10 | 0 |
| 2011-10-24 | Fracture | 3348.00 | 3348.10 | 0 |
| 2011-10-24 | Fracture | 3221.00 | 3221.10 | 0 |
| 2011-10-21 | Hydra Jet Perforation | 4799.00 | 4799.10 | 0 |
| 2011-10-21 | Hydra Jet Perforation | 4711.40 | 4711.50 | 0 |
| 2011-10-21 | Hydra Jet Perforation | 4606.10 | 4606.20 | 0 |
| 2011-10-21 | Hydra Jet Perforation | 4587.10 | 4587.20 | 0 |
| 2011-10-21 | Hydra Jet Perforation | 4388.00 | 4388.10 | 0 |
| 2011-10-21 | Fracture | 4799.00 | 4799.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 1350 | 0.0 | 0.0 | 0.0 |
| 2012 | 8733 | 0.0 | 0.0 | 0.0 |
| 2013 | 8389 | 0.0 | 0.0 | 0.0 |
| 2014 | 8701 | 0.0 | 0.0 | 0.0 |
| 2015 | 8741 | 0.0 | 0.0 | 0.0 |
| 2016 | 8704 | 0.0 | 0.0 | 0.0 |
| 2017 | 8116 | 0.0 | 0.0 | 0.0 |
| 2018 | 6143 | 0.0 | 0.0 | 0.0 |
| 2019 | 8593 | 0.0 | 0.0 | 0.0 |
| 2020 | 2170 | 0.0 | 0.0 | 0.0 |
For data sources see[6]