X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616052301000

Well Details

Well ID: 0616052301000
Loading map...
Location: 00/01-23-061-05W6/0
Location Alias: 00/01-23-61-05 W6M
Location Alias 2: 00/01-23-061-05 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ KAKWA 1-23-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0484269
License Date: 2017-06-28
License Status: Amended
Spud Date: 2018-08-14
Final Drill Date: 2018-09-15
Well Total Depth: 5629.00 m
Surface Hole Latitude: 54.297425
Surface Hole Longitude: -118.662379

For data sources see[1][2]

Well History

Date Event
2017-06-28 Obtained License
2018-08-16 Surface Casing Operation Performed
2018-08-25 Direction Drilling Operation Performed - Deviate
2018-08-26 Intermediate Casing Operation Performed
2018-08-31 Direction Drilling Operation Performed - Horizontal
2018-09-15 Finished Drilling
2018-09-15 Well Log Performed
2018-09-15 Well Mode changed to Drilled and Cased
2018-09-17 Liner Casing Operation Performed
2018-09-19 Rig Released
2018-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-13 Well Fluid changed to Gas
2018-11-13 Well Mode changed to Testing
2019-01-06 Well Began Production
2019-01-06 Well Fluid changed to Gas
2019-01-06 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-08-14 Horizon Drilling Inc. 40 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-25 2887.40 Deviate (5 - 79 degrees)
2018-08-31 3196.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-11-10 Multi-Stage Fracture 5589.60 5589.70 0
2018-11-10 Multi-Stage Fracture 4953.70 4953.80 0
2018-11-10 Multi-Stage Fracture 4880.30 4880.40 0
2018-11-10 Multi-Stage Fracture 4820.20 4820.30 0
2018-11-10 Multi-Stage Fracture 4760.50 4760.60 0
2018-11-10 Multi-Stage Fracture 4674.80 4674.90 0
2018-11-10 Multi-Stage Fracture 4613.90 4614.00 0
2018-11-10 Multi-Stage Fracture 4530.60 4530.70 0
2018-11-10 Multi-Stage Fracture 4443.00 4443.10 0
2018-11-10 Multi-Stage Fracture 4356.20 4356.30 0
2018-11-10 Multi-Stage Fracture 4269.30 4269.40 0
2018-11-10 Multi-Stage Fracture 5529.20 5529.30 0
2018-11-11 Multi-Stage Fracture 4180.70 4180.80 0
2018-11-11 Multi-Stage Fracture 4092.40 4092.50 0
2018-11-11 Multi-Stage Fracture 4003.60 4003.70 0
2018-11-11 Multi-Stage Fracture 3916.50 3916.60 0
2018-11-11 Multi-Stage Fracture 3827.70 3827.80 0
2018-11-11 Multi-Stage Fracture 3740.20 3740.30 0
2018-11-11 Multi-Stage Fracture 3651.30 3651.40 0
2018-11-11 Multi-Stage Fracture 3562.70 3562.80 0
2018-11-11 Multi-Stage Fracture 3474.00 3474.10 0
2018-11-11 Multi-Stage Fracture 3385.20 3385.30 0
2018-11-10 Multi-Stage Fracture 5456.30 5456.40 0
2018-11-11 Multi-Stage Fracture 3297.00 3297.10 0
2018-11-11 Multi-Stage Fracture 3208.10 3208.20 0
2018-11-10 Multi-Stage Fracture 5382.80 5382.90 0
2018-11-10 Multi-Stage Fracture 5296.60 5296.70 0
2018-11-10 Multi-Stage Fracture 5222.10 5222.20 0
2018-11-10 Multi-Stage Fracture 5147.60 5147.70 0
2018-11-10 Multi-Stage Fracture 5087.60 5087.70 0
2018-11-10 Multi-Stage Fracture 5014.60 5014.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-11-10 2018-11-11 3,128 9,106 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.3543 N/A
40/70 Prime Plus Calfrac Quartz 14808-60-7 100 2.6309 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.6973 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.1693 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0111 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0111 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0111 N/A
Polyethylene glycol 25322-68-3 100 0.0111 N/A
Sodium bromide 7647-15-6 100 0.0111 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0463 N/A
DynaRate 6000 Calfrac Friction Reducer Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0906 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0906 N/A
Proprietary polymer Trade Secret 100 0.0906 N/A
Proprietary surfactant blend Trade Secret 100 0.0906 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-11-10 2018-11-11 Surface Water - Runoff 12553

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 97 0.0 0.0 0.0
2019 8511 0.0 0.0 0.0
2020 2147 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-31 No Incident Encountered 0.00 0.00
2018-11-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References