X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616052709000

Well Details

Well ID: 0616052709000
Loading map...
Location: 00/09-27-061-05W6/0
Location Alias: 00/09-27-61-05 W6M
Location Alias 2: 00/09-27-061-05 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA KAKWA 9-27-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0428706
License Date: 2010-12-22
License Status: Amended
Spud Date: 2011-03-01
Final Drill Date: 2011-04-06
Well Total Depth: 4941.00 m
Surface Hole Latitude: 54.317673
Surface Hole Longitude: -118.677673

For data sources see[1][2]

Well History

Date Event
2010-12-22 Obtained License
2011-03-01 Well Log Performed
2011-03-02 Direction Drilling Operation Performed - Horizontal
2011-03-03 Surface Casing Operation Performed
2011-03-09 Intermediate Casing Operation Performed
2011-03-12 Direction Drilling Operation Performed - Horizontal
2011-04-06 Finished Drilling
2011-04-06 Well Log Performed
2011-04-06 Well Mode changed to Drilled and Cased
2011-04-08 Production Casing Operation Performed
2011-04-11 Rig Released
2011-06-11 Well Log Performed
2011-06-12 Well Log Performed
2011-06-15 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-06-16 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-06-16 Perforation Treatment Performed - Fractured
2011-06-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-06-17 Perforation Treatment Performed - Fractured
2011-06-18 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-06-18 Perforation Treatment Performed - Fractured
2011-06-19 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-06-19 Perforation Treatment Performed - Fractured
2011-06-20 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-06-20 Perforation Treatment Performed - Fractured
2011-06-21 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-06-21 Perforation Treatment Performed - Fractured
2011-06-22 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-06-22 Perforation Treatment Performed - Fractured
2011-06-23 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-06-23 Perforation Treatment Performed - Fractured
2011-06-25 Well Fluid changed to Gas
2011-06-25 Well Mode changed to Testing
2011-06-27 Well Began Production
2011-06-27 Well Fluid changed to Gas
2011-06-27 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-02 145.00 Horizontal
2011-03-12 2760.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-06-15 Hydra Jet Perforation 4929.80 4929.90 0
2011-06-17 Fracture 4660.00 4660.10 0
2011-06-17 Hydra Jet Perforation 4570.00 4570.10 0
2011-06-17 Fracture 4570.00 4570.10 0
2011-06-18 Hydra Jet Perforation 4300.00 4300.10 0
2011-06-18 Fracture 4300.00 4300.10 0
2011-06-18 Hydra Jet Perforation 4210.00 4210.10 0
2011-06-19 Hydra Jet Perforation 4203.90 4204.00 0
2011-06-19 Fracture 4203.90 4204.00 0
2011-06-19 Hydra Jet Perforation 4120.00 4120.10 0
2011-06-19 Fracture 4120.00 4120.10 0
2011-06-16 Hydra Jet Perforation 4920.00 4920.10 0
2011-06-19 Hydra Jet Perforation 4030.00 4030.10 0
2011-06-19 Fracture 4030.00 4030.10 0
2011-06-20 Hydra Jet Perforation 3940.00 3940.10 0
2011-06-20 Fracture 3940.00 3940.10 0
2011-06-20 Hydra Jet Perforation 3850.00 3850.10 0
2011-06-20 Fracture 3850.00 3850.10 0
2011-06-20 Hydra Jet Perforation 3760.00 3760.10 0
2011-06-20 Fracture 3760.00 3760.10 0
2011-06-20 Hydra Jet Perforation 3670.00 3670.10 0
2011-06-20 Hydra Jet Perforation 3665.00 3665.10 0
2011-06-16 Fracture 4920.00 4929.90 0
2011-06-21 Hydra Jet Perforation 3659.00 3660.00 0
2011-06-21 Hydra Jet Perforation 3580.00 3580.10 0
2011-06-21 Fracture 3580.00 3580.10 0
2011-06-22 Hydra Jet Perforation 3490.00 3490.10 0
2011-06-22 Fracture 3490.00 3490.10 0
2011-06-22 Hydra Jet Perforation 3400.00 3400.10 0
2011-06-22 Fracture 3400.00 3400.10 0
2011-06-22 Hydra Jet Perforation 3310.00 3310.10 0
2011-06-22 Fracture 3310.00 3310.10 0
2011-06-22 Hydra Jet Perforation 3220.00 3220.10 0
2011-06-16 Hydra Jet Perforation 4840.00 4840.10 0
2011-06-22 Fracture 3220.00 3220.10 0
2011-06-22 Hydra Jet Perforation 3130.00 3130.10 0
2011-06-23 Fracture 3130.00 3130.10 0
2011-06-23 Hydra Jet Perforation 3060.00 3060.10 0
2011-06-23 Fracture 3060.00 3060.10 0
2011-06-23 Hydra Jet Perforation 2940.00 2940.10 0
2011-06-23 Hydra Jet Perforation 2935.00 2935.10 0
2011-06-16 Fracture 4840.00 4840.10 0
2011-06-16 Hydra Jet Perforation 4750.00 4750.10 0
2011-06-17 Hydra Jet Perforation 4740.00 4740.10 0
2011-06-17 Fracture 4740.00 4750.10 0
2011-06-17 Hydra Jet Perforation 4660.00 4660.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4262 0.0 0.0 0.0
2012 8401 0.0 0.0 0.0
2013 8311 0.0 0.0 0.0
2014 7807 0.0 0.0 0.0
2015 8487 0.0 0.0 0.0
2016 8651 0.0 0.0 0.0
2017 8261 0.0 0.0 0.0
2018 7938 0.0 0.0 0.0
2019 7980 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

References