X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616052905000

Well Details

Well ID: 0616052905000
Loading map...
Location: 00/05-29-061-05W6/0
Location Alias: 00/05-29-61-05 W6M
Location Alias 2: 00/05-29-061-05 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 29
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA KAKWA 5-29-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0433066
License Date: 2011-04-20
License Status: Amended
Spud Date: 2011-05-17
Final Drill Date: 2011-07-07
Well Total Depth: 4734.00 m
Surface Hole Latitude: 54.290156
Surface Hole Longitude: -118.706770

For data sources see[1][2]

Well History

Date Event
2011-04-20 Obtained License
2011-05-16 Well Log Performed
2011-05-26 Surface Casing Operation Performed
2011-06-05 Direction Drilling Operation Performed - Horizontal
2011-06-08 Intermediate Casing Operation Performed
2011-07-07 Finished Drilling
2011-07-07 Well Mode changed to Drilled and Cased
2011-07-09 Production Casing Operation Performed
2011-07-11 Rig Released
2011-10-10 Well Log Performed
2011-10-12 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-10-12 Perforation Treatment Performed - Fractured
2011-10-13 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-10-13 Perforation Treatment Performed - Fractured
2011-10-14 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-10-15 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-10-15 Perforation Treatment Performed - Fractured
2011-10-16 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-10-16 Perforation Treatment Performed - Fractured
2011-10-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-10-17 Perforation Treatment Performed - Fractured
2011-10-18 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-10-18 Perforation Treatment Performed - Fractured
2011-10-19 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-10-19 Perforation Treatment Performed - Fractured
2011-10-27 Well Fluid changed to Gas
2011-10-27 Well Mode changed to Testing
2011-11-10 Well Began Production
2011-11-10 Well Fluid changed to Gas
2011-11-10 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-06-05 2787.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-12 Hydra Jet Perforation 4684.60 4684.70 0
2011-10-15 Hydra Jet Perforation 4424.00 4424.10 0
2011-10-15 Fracture 4424.00 4428.00 0
2011-10-15 Hydra Jet Perforation 4336.00 4336.10 0
2011-10-15 Fracture 4336.00 4336.10 0
2011-10-15 Hydra Jet Perforation 4227.50 4227.60 0
2011-10-15 Fracture 4227.50 4227.60 0
2011-10-15 Hydra Jet Perforation 4138.70 4138.80 0
2011-10-15 Fracture 4138.70 4138.80 0
2011-10-16 Hydra Jet Perforation 4048.00 4048.10 0
2011-10-16 Fracture 4048.00 4048.10 0
2011-10-12 Fracture 4684.60 4684.70 0
2011-10-16 Hydra Jet Perforation 3958.00 3958.10 0
2011-10-16 Fracture 3958.00 3958.10 0
2011-10-16 Hydra Jet Perforation 3868.00 3868.10 0
2011-10-16 Hydra Jet Perforation 3863.80 3863.90 0
2011-10-17 Hydra Jet Perforation 3777.90 3778.00 0
2011-10-17 Fracture 3777.90 3778.00 0
2011-10-17 Hydra Jet Perforation 3768.00 3768.10 0
2011-10-17 Fracture 3768.00 3768.10 0
2011-10-17 Hydra Jet Perforation 3688.00 3688.10 0
2011-10-17 Fracture 3688.00 3688.10 0
2011-10-12 Hydra Jet Perforation 4673.60 4673.70 0
2011-10-17 Hydra Jet Perforation 3598.00 3598.10 0
2011-10-17 Fracture 3598.00 3598.10 0
2011-10-18 Hydra Jet Perforation 3508.00 3508.10 0
2011-10-18 Hydra Jet Perforation 3503.00 3503.10 0
2011-10-18 Fracture 3503.00 3503.10 0
2011-10-18 Hydra Jet Perforation 3418.00 3418.10 0
2011-10-18 Fracture 3418.00 3418.10 0
2011-10-18 Hydra Jet Perforation 3328.00 3328.10 0
2011-10-19 Fracture 3328.00 3328.10 0
2011-10-19 Hydra Jet Perforation 3238.00 3238.10 0
2011-10-12 Fracture 4673.60 4673.70 0
2011-10-19 Hydra Jet Perforation 3235.00 3235.10 0
2011-10-19 Fracture 3235.00 3235.10 0
2011-10-12 Hydra Jet Perforation 4608.70 4608.80 0
2011-10-13 Fracture 4608.70 4608.80 0
2011-10-13 Hydra Jet Perforation 4517.70 4517.80 0
2011-10-14 Hydra Jet Perforation 4497.00 4497.10 0
2011-10-15 Hydra Jet Perforation 4427.90 4428.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1394 0.0 0.0 0.0
2012 8715 0.0 0.0 0.0
2013 8362 0.0 0.0 0.0
2014 8731 0.0 0.0 0.0
2015 8672 0.0 0.0 0.0
2016 7136 0.0 0.0 0.0
2017 7986 0.0 0.0 0.0
2018 8255 0.0 0.0 0.0
2019 8353 0.0 0.0 0.0
2020 2130 0.0 0.0 0.0

For data sources see[6]

References