X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616052915000

Well Details

Well ID: 0616052915000
Loading map...
Location: 00/15-29-061-05W6/0
Location Alias: 00/15-29-61-05 W6M
Location Alias 2: 00/15-29-061-05 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 29
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA KAKWA 15-29-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0417946
License Date: 2010-01-26
License Status: Amended
Spud Date: 2010-04-18
Final Drill Date: 2010-05-19
Well Total Depth: 4665.00 m
Surface Hole Latitude: 54.304231
Surface Hole Longitude: -118.682784

For data sources see[1][2]

Well History

Date Event
2010-01-26 Obtained License
2010-04-20 Surface Casing Operation Performed
2010-04-25 Intermediate Casing Operation Performed
2010-04-28 Direction Drilling Operation Performed - Horizontal
2010-05-04 Well Log Performed
2010-05-19 Finished Drilling
2010-05-19 Well Log Performed
2010-05-19 Well Mode changed to Drilled and Cased
2010-05-21 Production Casing Operation Performed
2010-05-22 Rig Released
2010-06-16 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-06-16 Perforation Treatment Performed - Fractured
2010-06-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-06-17 Perforation Treatment Performed - Fractured
2010-06-18 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-06-18 Perforation Treatment Performed - Fractured
2010-06-19 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-06-19 Perforation Treatment Performed - Fractured
2010-06-20 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-06-20 Perforation Treatment Performed - Fractured
2010-06-21 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-06-21 Perforation Treatment Performed - Fractured
2010-06-22 Well Fluid changed to Gas
2010-06-22 Well Mode changed to Testing
2010-06-25 Well Began Production
2010-06-25 Well Fluid changed to Gas
2010-06-25 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-04-28 2817.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-06-16 Hydra Jet Perforation 4620.00 4620.10 0
2010-06-17 Fracture 4252.00 4252.10 0
2010-06-17 Hydra Jet Perforation 4160.00 4160.10 0
2010-06-17 Fracture 4160.00 4160.10 0
2010-06-18 Hydra Jet Perforation 4060.00 4060.10 0
2010-06-18 Fracture 4060.00 4060.10 0
2010-06-18 Hydra Jet Perforation 3940.00 3940.10 0
2010-06-18 Fracture 3940.00 3940.10 0
2010-06-18 Hydra Jet Perforation 3858.00 3858.10 0
2010-06-19 Hydra Jet Perforation 3848.00 3848.10 0
2010-06-19 Fracture 3848.00 3848.10 0
2010-06-16 Fracture 4620.00 4620.10 0
2010-06-19 Hydra Jet Perforation 3766.00 3766.10 0
2010-06-19 Fracture 3766.00 3766.10 0
2010-06-19 Hydra Jet Perforation 3674.00 3674.10 0
2010-06-19 Fracture 3674.00 3674.10 0
2010-06-20 Hydra Jet Perforation 3582.00 3582.10 0
2010-06-20 Hydra Jet Perforation 3572.00 3572.10 0
2010-06-20 Hydra Jet Perforation 3490.00 3490.10 0
2010-06-20 Fracture 3490.00 3490.10 0
2010-06-20 Hydra Jet Perforation 3398.00 3398.10 0
2010-06-20 Fracture 3398.00 3398.10 0
2010-06-17 Hydra Jet Perforation 4528.00 4528.10 0
2010-06-20 Hydra Jet Perforation 3306.00 3306.10 0
2010-06-20 Fracture 3306.00 3306.10 0
2010-06-20 Hydra Jet Perforation 3214.00 3214.10 0
2010-06-21 Fracture 3214.00 3214.10 0
2010-06-21 Hydra Jet Perforation 3122.00 3122.10 0
2010-06-21 Fracture 3122.00 3122.10 0
2010-06-17 Fracture 4528.00 4528.10 0
2010-06-17 Hydra Jet Perforation 4436.00 4436.10 0
2010-06-17 Fracture 4436.00 4436.10 0
2010-06-17 Hydra Jet Perforation 4344.00 4344.10 0
2010-06-17 Fracture 4344.00 4344.10 0
2010-06-17 Hydra Jet Perforation 4252.00 4252.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4408 0.0 0.0 0.0
2011 8185 0.0 0.0 0.0
2012 8679 0.0 0.0 0.0
2013 8538 0.0 0.0 0.0
2014 8733 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8117 0.0 0.0 0.0
2018 8160 0.0 0.0 0.0
2019 8400 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

References