X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616053508000

Well Details

Well ID: 0616053508000
Loading map...
Location: 00/08-35-061-05W6/0
Location Alias: 00/08-35-61-05 W6M
Location Alias 2: 00/08-35-061-05 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG KAKWA 8-35-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0404904
License Date: 2008-11-27
License Status: Amended
Spud Date: 2009-07-29
Final Drill Date: 2009-08-16
Well Total Depth: 3448.00 m
Surface Hole Latitude: 54.313242
Surface Hole Longitude: -118.616210

For data sources see[1][2]

Well History

Date Event
2008-11-27 Obtained License
2009-07-29 Direction Drilling Operation Performed - Deviate
2009-08-02 Surface Casing Operation Performed
2009-08-10 Intermediate Casing Operation Performed
2009-08-16 Finished Drilling
2009-08-16 Well Log Performed
2009-08-16 Well Mode changed to Drilled and Cased
2009-08-17 Production Casing Operation Performed
2009-08-18 Rig Released
2009-09-17 Well Log Performed
2009-10-11 Perforation Treatment Performed - Jet Perforation
2009-10-13 Well Log Performed
2009-10-21 Perforation Treatment Performed - Fractured
2009-10-21 Well Log Performed
2009-10-22 Perforation Treatment Performed - Jet Perforation
2009-10-25 Perforation Treatment Performed - Fractured
2009-10-25 Perforation Treatment Performed - Jet Perforation
2009-10-25 Well Log Performed
2009-10-28 Perforation Treatment Performed - Fractured
2009-10-28 Perforation Treatment Performed - Jet Perforation
2009-10-28 Well Log Performed
2009-10-29 Perforation Treatment Performed - Fractured
2009-10-30 Well Fluid changed to Gas
2009-10-30 Well Mode changed to Testing
2009-11-03 Perforation Treatment Performed - Fractured
2009-11-03 Perforation Treatment Performed - Jet Perforation
2009-11-03 Well Log Performed
2009-11-04 Well Log Performed
2009-11-05 Perforation Treatment Performed - Fractured
2009-11-05 Perforation Treatment Performed - Jet Perforation
2009-11-05 Well Log Performed
2009-11-06 Perforation Treatment Performed - Fractured
2009-11-06 Perforation Treatment Performed - Jet Perforation
2009-11-06 Well Log Performed
2009-11-07 Perforation Treatment Performed - Fractured
2009-11-07 Perforation Treatment Performed - Jet Perforation
2009-11-07 Well Log Performed
2009-11-08 Perforation Treatment Performed - Fractured
2009-11-12 Well Began Production
2009-11-12 Well Fluid changed to Gas
2009-11-12 Well Mode changed to Flowing
2009-11-17 Well Log Performed
2009-11-30 Well Log Performed
2015-09-02 Well Fluid changed to Gas
2015-09-02 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-07-29 150.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-11 Perforation 3355.00 3356.50 10
2009-10-25 Fracture 3230.50 3231.50 0
2009-10-28 Perforation 3123.00 3124.00 10
2009-10-28 Perforation 3107.00 3109.00 10
2009-10-28 Fracture 3153.00 3155.00 0
2009-10-28 Perforation 3133.00 3134.00 10
2009-10-29 Fracture 3107.00 3134.00 0
2009-11-03 Fracture 3035.00 3037.00 0
2009-11-03 Perforation 3035.00 3037.00 10
2009-11-05 Fracture 2969.00 2984.00 0
2009-11-05 Perforation 2773.50 2775.50 20
2009-10-11 Perforation 3405.00 3406.00 10
2009-11-05 Perforation 2982.00 2984.00 10
2009-11-05 Perforation 2969.00 2971.00 10
2009-11-06 Perforation 2738.50 2739.50 10
2009-11-06 Perforation 2730.50 2731.50 10
2009-11-06 Perforation 2754.00 2754.50 20
2009-11-06 Fracture 2773.50 2775.50 0
2009-11-06 Perforation 2758.00 2758.50 10
2009-11-07 Perforation 2270.00 2274.00 10
2009-11-07 Fracture 2730.50 2758.50 0
2009-11-08 Fracture 2270.00 2274.00 0
2009-10-11 Perforation 3411.00 3412.00 10
2009-10-21 Fracture 3355.00 3412.00 0
2009-10-22 Perforation 3215.00 3216.00 10
2009-10-22 Perforation 3207.00 3209.00 10
2009-10-22 Perforation 3230.50 3231.50 10
2009-10-25 Perforation 3153.00 3155.00 10
2009-10-25 Fracture 3207.00 3216.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 886 0.0 0.0 0.0
2010 8205 0.0 0.0 0.0
2011 7535 0.0 0.0 0.0
2012 8501 0.0 0.0 0.0
2013 8663 0.0 0.0 0.0
2014 8355 0.0 0.0 0.0
2015 8480 0.0 0.0 0.0
2016 5317 0.0 0.0 0.0
2017 5592 0.0 0.0 0.0
2018 3000 0.0 0.0 0.0
2019 6365 0.0 0.0 0.0
2020 2040 0.0 0.0 0.0

For data sources see[6]

References