If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616061315000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.296324,"lon":-118.798873,"icon":""}]} |
| Location: 00/15-13-061-06W6/0 | |
| Location Alias: 00/15-13-61-06 W6M | |
| Location Alias 2: 00/15-13-061-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 13 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: JUPITER HZ KAKWA 15-13-61-6 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0476884 | |
| License Date: 2015-09-10 | |
| License Status: Issued | |
| Spud Date: 2015-11-25 | |
| Final Drill Date: 2015-12-29 | |
| Well Total Depth: 6041.60 m | |
| Surface Hole Latitude: 54.296324 | |
| Surface Hole Longitude: -118.798873 |
| Date | Event |
|---|---|
| 2015-07-08 | Well Log Performed |
| 2015-09-10 | Obtained License |
| 2015-11-27 | Surface Casing Operation Performed |
| 2015-11-30 | Well Log Performed |
| 2015-12-06 | Intermediate Casing Operation Performed |
| 2015-12-11 | Direction Drilling Operation Performed - Deviate |
| 2015-12-16 | Direction Drilling Operation Performed - Horizontal |
| 2015-12-29 | Finished Drilling |
| 2015-12-29 | Well Log Performed |
| 2015-12-29 | Well Mode changed to Drilled and Cased |
| 2016-01-04 | Production Casing Operation Performed |
| 2016-01-06 | Rig Released |
| 2016-03-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-03-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-03-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-03-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-03-27 | Well Fluid changed to Gas |
| 2016-03-27 | Well Mode changed to Testing |
| 2016-09-10 | Well Began Production |
| 2016-09-10 | Well Fluid changed to Gas |
| 2016-09-10 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-12-10 | Nabors Drilling Limited | 58 | N/A | Resumption |
| 2015-11-25 | Nabors Drilling Limited | 58 | N/A | Set Surface |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-12-11 | 2685.80 | Deviate (5 - 79 degrees) |
| 2015-12-16 | 3078.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2016-03-01 | Multi-Stage Fracture | 5981.60 | 5981.70 | 0 |
| 2016-03-02 | Multi-Stage Fracture | 5173.10 | 5173.20 | 0 |
| 2016-03-02 | Multi-Stage Fracture | 5089.70 | 5089.80 | 0 |
| 2016-03-02 | Multi-Stage Fracture | 4992.70 | 4992.80 | 0 |
| 2016-03-02 | Multi-Stage Fracture | 4900.60 | 4900.70 | 0 |
| 2016-03-02 | Multi-Stage Fracture | 4817.20 | 4817.30 | 0 |
| 2016-03-02 | Multi-Stage Fracture | 4720.30 | 4720.40 | 0 |
| 2016-03-02 | Multi-Stage Fracture | 4623.50 | 4623.60 | 0 |
| 2016-03-03 | Multi-Stage Fracture | 4540.10 | 4540.20 | 0 |
| 2016-03-03 | Multi-Stage Fracture | 4443.20 | 4443.30 | 0 |
| 2016-03-03 | Multi-Stage Fracture | 4346.20 | 4346.30 | 0 |
| 2016-03-01 | Multi-Stage Fracture | 5910.30 | 5910.40 | 0 |
| 2016-03-03 | Multi-Stage Fracture | 4267.00 | 4267.10 | 0 |
| 2016-03-03 | Multi-Stage Fracture | 4170.60 | 4170.70 | 0 |
| 2016-03-03 | Multi-Stage Fracture | 4074.80 | 4074.90 | 0 |
| 2016-03-03 | Multi-Stage Fracture | 3992.50 | 3992.60 | 0 |
| 2016-03-03 | Multi-Stage Fracture | 3909.00 | 3909.10 | 0 |
| 2016-03-03 | Multi-Stage Fracture | 3826.00 | 3826.10 | 0 |
| 2016-03-03 | Multi-Stage Fracture | 3743.20 | 3743.30 | 0 |
| 2016-03-04 | Multi-Stage Fracture | 3659.50 | 3659.60 | 0 |
| 2016-03-04 | Multi-Stage Fracture | 3576.10 | 3576.20 | 0 |
| 2016-03-04 | Multi-Stage Fracture | 3493.40 | 3493.50 | 0 |
| 2016-03-01 | Multi-Stage Fracture | 5813.90 | 5814.00 | 0 |
| 2016-03-04 | Multi-Stage Fracture | 3409.70 | 3409.80 | 0 |
| 2016-03-04 | Multi-Stage Fracture | 3326.30 | 3326.40 | 0 |
| 2016-03-04 | Multi-Stage Fracture | 3218.70 | 3218.80 | 0 |
| 2016-03-01 | Multi-Stage Fracture | 5720.00 | 5720.10 | 0 |
| 2016-03-01 | Multi-Stage Fracture | 5637.60 | 5637.70 | 0 |
| 2016-03-01 | Multi-Stage Fracture | 5540.80 | 5540.90 | 0 |
| 2016-03-01 | Multi-Stage Fracture | 5443.80 | 5443.90 | 0 |
| 2016-03-02 | Multi-Stage Fracture | 5360.30 | 5360.40 | 0 |
| 2016-03-02 | Multi-Stage Fracture | 5266.20 | 5266.30 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2016-03-01 | 2016-03-04 | 2,968 | 14,920 | N/A |
| 2 | 2016-03-01 | 2016-03-02 | 2,968 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 84.2395 | N/A | |||
| Prime Plus 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 2.4378 | N/A | ||
| silica crystalline | 14808-60-7 | 100 | 2.4378 | N/A | ||||
| Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 10.9196 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 2.1905 | N/A | ||
| Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0143 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0143 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0143 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.0143 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0143 | N/A | ||||
| CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1408 | N/A | |
| water | Not Available | 100 | 0.1408 | N/A | ||||
| DF-2W | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0.0053 | N/A | |
| propylene glycol | 57-55-6 | 100 | 0.0053 | N/A | ||||
| GFR-3D | Trican | Friction Reducer | non-hazardous ingredients | Not Available | 100 | 0.0305 | N/A | |
| sodium chloride | 7647-14-5 | 100 | 0.0305 | N/A | ||||
| 2 | SI-14 | Trican | Scale Inhibitor | methanol | 67-56-1 | 100 | 0.0428 | N/A |
| non-hazardous ingredients | Not Available | 100 | 0.0428 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2016-02-28 | 2016-03-04 | Central Water Distribution Facility | 14698 |
| 2016-03-01 | 2016-03-03 | Recycled Fracturing Water (treated at well site) | 69 |
| 2016-03-01 | 2016-03-03 | Recycled Fracturing Water (treated at well site) | 69 |
| 2016-03-01 | 2016-03-03 | Recycled Fracturing Water (treated at well site) | 69 |
| 2016-03-01 | 2016-03-01 | Recycled Fracturing Water (treated at well site) | 95 |
| 2016-03-01 | 2016-03-01 | Recycled Fracturing Water (treated at well site) | 95 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2016 | 2678 | 0.0 | 0.0 | 0.0 |
| 2017 | 7239 | 0.0 | 0.0 | 0.0 |
| 2018 | 8286 | 0.0 | 0.0 | 0.0 |
| 2019 | 8421 | 0.0 | 0.0 | 0.0 |
| 2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-12-16 | No Incident Encountered | 0.00 | 0.00 |
| 2016-04-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]