If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616062704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.299912,"lon":-118.798835,"icon":""}]} |
| Location: 00/04-27-061-06W6/0 | |
| Location Alias: 00/04-27-61-06 W6M | |
| Location Alias 2: 00/04-27-061-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 27 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: HARVEST ET AL HZ KAKWA 4-27-61-6 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0467077 | |
| License Date: 2014-06-04 | |
| License Status: Issued | |
| Spud Date: 2014-07-07 | |
| Final Drill Date: 2014-08-11 | |
| Well Total Depth: 4509.00 m | |
| Surface Hole Latitude: 54.299912 | |
| Surface Hole Longitude: -118.798835 |
| Date | Event |
|---|---|
| 2014-06-04 | Obtained License |
| 2014-07-10 | Surface Casing Operation Performed |
| 2014-07-26 | Intermediate Casing Operation Performed |
| 2014-07-27 | Well Log Performed |
| 2014-07-28 | Direction Drilling Operation Performed - Deviate |
| 2014-08-02 | Direction Drilling Operation Performed - Horizontal |
| 2014-08-11 | Finished Drilling |
| 2014-08-11 | Well Log Performed |
| 2014-08-11 | Well Mode changed to Drilled and Cased |
| 2014-08-14 | Production Casing Operation Performed |
| 2014-08-15 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-08-15 | Rig Released |
| 2014-11-28 | Well Log Performed |
| 2014-12-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-12-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-01-15 | Well Began Production |
| 2015-01-15 | Well Fluid changed to Gas |
| 2015-01-15 | Well Mode changed to Flowing |
| 2020-01-01 | Well Fluid changed to Gas |
| 2020-01-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-07-07 | Precision Drilling Corporation | 622 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-07-28 | 2827.40 | Deviate (5 - 79 degrees) |
| 2014-08-02 | 3213.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-08-15 | Open Hole/Barefoot Completion | 4501.00 | 4509.00 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 3863.60 | 3863.70 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 3789.00 | 3789.10 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 3714.30 | 3714.40 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 3639.70 | 3639.80 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 3565.00 | 3565.10 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 3490.30 | 3490.40 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 3415.70 | 3415.80 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 3341.00 | 3341.10 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 3266.40 | 3266.50 | 0 |
| 2014-12-15 | Multi-Stage Fracture | 4464.60 | 4464.70 | 0 |
| 2014-12-15 | Multi-Stage Fracture | 4386.20 | 4386.30 | 0 |
| 2014-12-15 | Multi-Stage Fracture | 4311.60 | 4311.70 | 0 |
| 2014-12-15 | Multi-Stage Fracture | 4236.90 | 4237.00 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 4175.80 | 4175.90 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 4087.60 | 4087.70 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 4012.90 | 4013.00 | 0 |
| 2014-12-16 | Multi-Stage Fracture | 3938.30 | 3938.40 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-12-15 | 2014-12-16 | 3,103 | 5,126 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 82.5047 | N/A | |||
| 30/50 Atlas CRC | Calfrac | Hexamethylenetetramine | 100-97-0 | 100 | 2.7197 | N/A | ||
| Phenolic Resin | 9003-35-4 | 100 | 2.7196 | N/A | ||||
| Quartz (SiO2) | 14808-60-7 | 100 | 2.7196 | N/A | ||||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 13.789 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0091 | N/A | |
| Water | 7732-18-5 | 100 | 0.0094 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0679 | N/A | |
| DWP-937 | Calfrac | Demulsifier | Citrus terpenes | 94266-47-4 | 100 | 0.0716 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.072 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0716 | N/A | ||||
| Triethylene glycol | 112-27-6 | 100 | 0.072 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0719 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 1.0852 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0975 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-10-22 | 2014-11-15 | Surface Water - River | 5125 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 7712 | 0.0 | 0.0 | 0.0 |
| 2016 | 8158 | 0.0 | 0.0 | 0.0 |
| 2017 | 8733 | 0.0 | 0.0 | 0.0 |
| 2018 | 8656 | 0.0 | 0.0 | 0.0 |
| 2019 | 8513 | 0.0 | 0.0 | 0.0 |
| 2020 | 2062 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-08-15 | No Incident Encountered | 0.00 | 0.00 |
| 2014-12-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]