X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616062801000

Well Details

Well ID: 0616062801000
Loading map...
Location: 00/01-28-061-06W6/0
Location Alias: 00/01-28-61-06 W6M
Location Alias 2: 00/01-28-061-06 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 06
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE ET AL DD KAKWA 1-28-61-6
Operator Name: Tourmaline Oil Corp.
License Number: 0429240
License Date: 2010-12-31
License Status: Issued
Spud Date: 2011-01-20
Final Drill Date: 2011-02-09
Well Total Depth: 3421.00 m
Surface Hole Latitude: 54.300038
Surface Hole Longitude: -118.826448

For data sources see[1][2]

Well History

Date Event
2010-12-31 Obtained License
2011-01-20 Lost Circulation Occurred
2011-01-24 Surface Casing Operation Performed
2011-01-25 Lost Circulation Occurred
2011-01-27 Lost Circulation Occurred
2011-01-28 Intermediate Casing Operation Performed
2011-02-09 Finished Drilling
2011-02-09 Well Mode changed to Drilled and Cased
2011-02-10 Well Log Performed
2011-02-11 Production Casing Operation Performed
2011-02-12 Rig Released
2011-03-01 Perforation Treatment Performed - Jet Perforation
2011-03-01 Well Log Performed
2011-03-03 Perforation Treatment Performed - Fractured
2011-03-04 Perforation Treatment Performed - Fractured
2011-03-04 Perforation Treatment Performed - Jet Perforation
2011-03-04 Well Log Performed
2011-03-05 Perforation Treatment Performed - Fractured
2011-03-05 Perforation Treatment Performed - Jet Perforation
2011-03-05 Well Log Performed
2011-09-27 Well Began Production
2011-09-27 Well Fluid changed to Gas
2011-09-27 Well Mode changed to Flowing
2013-02-05 Well Fluid changed to Gas
2013-02-05 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-01 Perforation 3203.50 3204.50 18
2011-03-05 Perforation 2139.00 2140.00 6
2011-03-05 Perforation 2134.50 2135.50 6
2011-03-05 Perforation 2116.50 2117.50 6
2011-03-05 Fracture 2116.50 2710.00 0
2011-03-01 Perforation 3178.50 3179.50 6
2011-03-03 Fracture 3178.50 3204.50 0
2011-03-04 Perforation 3072.50 3073.50 6
2011-03-04 Perforation 3043.00 3044.00 6
2011-03-04 Perforation 2946.00 2947.00 6
2011-03-04 Perforation 2929.50 2930.50 9
2011-03-04 Fracture 2929.50 3073.50 0
2011-03-05 Perforation 2709.00 2710.00 9

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1169 0.0 0.0 0.0
2012 5549 0.0 0.0 0.0
2013 4717 0.0 0.0 0.0
2014 4328 0.0 0.0 0.0
2015 5744 0.0 0.0 0.0
2016 6917 0.0 0.0 0.0
2017 8175 0.0 0.0 0.0
2018 7420 0.0 0.0 0.0
2019 8044 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-01-20 Lost Circulation 41.00 176.00
2011-01-25 Lost Circulation 960.00 961.00
2011-01-27 Lost Circulation 1600.00 1619.00

For data sources see[6]

References