If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616062915002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.312881,"lon":-118.829133,"icon":""}]} |
| Location: 00/15-29-061-06W6/2 | |
| Location Alias: 00/15-29-61-06 W6M | |
| Location Alias 2: 00/15-29-061-06 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 29 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TOURMALINE HZ KAKWA 15-29-61-6 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0462041 | |
| License Date: 2013-12-06 | |
| License Status: Issued | |
| Spud Date: 2014-01-20 | |
| Final Drill Date: 2014-03-10 | |
| Well Total Depth: 4875.00 m | |
| Surface Hole Latitude: 54.312881 | |
| Surface Hole Longitude: -118.829133 |
| Date | Event |
|---|---|
| 2013-12-06 | Obtained License |
| 2014-01-23 | Surface Casing Operation Performed |
| 2014-02-05 | Intermediate Casing Operation Performed |
| 2014-02-12 | Direction Drilling Operation Performed - Deviate |
| 2014-02-24 | Direction Drilling Operation Performed - Horizontal |
| 2014-02-24 | Direction Drilling Operation Performed - Sidetrack Fish |
| 2014-02-25 | Well Log Performed |
| 2014-03-10 | Finished Drilling |
| 2014-03-10 | Well Mode changed to Drilled and Cased |
| 2014-03-11 | Well Log Performed |
| 2014-03-15 | Production Casing Operation Performed |
| 2014-03-16 | Rig Released |
| 2014-03-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-03-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-03-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-03-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-03-29 | Well Fluid changed to Gas |
| 2014-03-29 | Well Mode changed to Testing |
| 2014-04-01 | Well Began Production |
| 2014-04-01 | Well Fluid changed to Gas |
| 2014-04-01 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-02-12 | 2797.60 | Deviate (5 - 79 degrees) |
| 2014-02-24 | 3219.00 | Sidetrack fish |
| 2014-02-24 | 3219.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-03-25 | Multi-Stage Fracture | 4837.30 | 4837.40 | 0 |
| 2014-03-26 | Multi-Stage Fracture | 4351.60 | 4351.70 | 0 |
| 2014-03-26 | Multi-Stage Fracture | 4296.20 | 4296.30 | 0 |
| 2014-03-27 | Multi-Stage Fracture | 4240.70 | 4240.80 | 0 |
| 2014-03-27 | Multi-Stage Fracture | 4185.30 | 4185.40 | 0 |
| 2014-03-27 | Multi-Stage Fracture | 4129.80 | 4129.90 | 0 |
| 2014-03-27 | Multi-Stage Fracture | 4074.30 | 4074.40 | 0 |
| 2014-03-27 | Multi-Stage Fracture | 4018.90 | 4019.00 | 0 |
| 2014-03-27 | Multi-Stage Fracture | 3963.40 | 3963.50 | 0 |
| 2014-03-27 | Multi-Stage Fracture | 3907.90 | 3908.00 | 0 |
| 2014-03-27 | Multi-Stage Fracture | 3852.50 | 3852.60 | 0 |
| 2014-03-25 | Multi-Stage Fracture | 4794.70 | 4794.80 | 0 |
| 2014-03-27 | Multi-Stage Fracture | 3797.00 | 3797.10 | 0 |
| 2014-03-28 | Multi-Stage Fracture | 3741.60 | 3741.70 | 0 |
| 2014-03-28 | Multi-Stage Fracture | 3686.10 | 3686.20 | 0 |
| 2014-03-28 | Multi-Stage Fracture | 3630.60 | 3630.70 | 0 |
| 2014-03-28 | Multi-Stage Fracture | 3575.10 | 3575.20 | 0 |
| 2014-03-28 | Multi-Stage Fracture | 3519.70 | 3519.80 | 0 |
| 2014-03-25 | Multi-Stage Fracture | 4739.20 | 4739.30 | 0 |
| 2014-03-26 | Multi-Stage Fracture | 4684.10 | 4684.20 | 0 |
| 2014-03-26 | Multi-Stage Fracture | 4628.60 | 4628.70 | 0 |
| 2014-03-26 | Multi-Stage Fracture | 4573.10 | 4573.20 | 0 |
| 2014-03-26 | Multi-Stage Fracture | 4518.00 | 4518.10 | 0 |
| 2014-03-26 | Multi-Stage Fracture | 4462.60 | 4462.70 | 0 |
| 2014-03-26 | Multi-Stage Fracture | 4407.10 | 4407.20 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-03-25 | 2014-03-28 | 3,189 | 6,350 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 81.8425 | N/A | |||
| Prime Plus 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 5.265 | N/A | ||
| silica crystalline | 14808-60-7 | 100 | 5.265 | N/A | ||||
| Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 11.1724 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.5396 | N/A | ||
| Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0125 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0125 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0125 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.0125 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0125 | N/A | ||||
| CC-77 | Trican | Clay Control | 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide | 7744 | 100 | 0.2096 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.2096 | N/A | ||||
| FR-9 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0906 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0906 | N/A | ||||
| S-2 | Trican | Surfactant | 2-ethylhexanol | 104-76-7 | 100 | 0.0781 | N/A | |
| isopropanol | 67-63-0 | 100 | 0.0781 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0781 | N/A | ||||
| oxydiethylenebis(alkyldimethyl ammonium chloride) | 68607-28-3 | 100 | 0.0781 | N/A | ||||
| solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.0781 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-02-22 | 2014-03-24 | Recycled Fracturing Water (treated at well site) | 2597 |
| 2014-03-21 | 2014-03-22 | Recycled Fracturing Water (treated at well site) | 913 |
| 2014-03-22 | 2014-03-24 | Surface Water - River | 2840 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 5696 | 0.0 | 0.0 | 0.0 |
| 2015 | 8220 | 0.0 | 0.0 | 0.0 |
| 2016 | 8388 | 0.0 | 0.0 | 0.0 |
| 2017 | 8638 | 0.0 | 0.0 | 0.0 |
| 2018 | 8119 | 0.0 | 0.0 | 0.0 |
| 2019 | 7580 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-03-10 | No Incident Encountered | 0.00 | 0.00 |
| 2014-04-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]