If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616063208000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.329147,"lon":-118.883105,"icon":""}]} |
| Location: 00/08-32-061-06W6/0 | |
| Location Alias: 00/08-32-61-06 W6M | |
| Location Alias 2: 00/08-32-061-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 32 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: JUPITER HZ KAKWA 8-32-61-6 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0493207 | |
| License Date: 2019-01-07 | |
| License Status: Amended | |
| Spud Date: 2019-01-31 | |
| Final Drill Date: 2019-03-11 | |
| Well Total Depth: 5506.00 m | |
| Surface Hole Latitude: 54.329147 | |
| Surface Hole Longitude: -118.883105 |
| Date | Event |
|---|---|
| 2019-01-07 | Obtained License |
| 2019-02-02 | Surface Casing Operation Performed |
| 2019-02-05 | Direction Drilling Operation Performed - Deviate |
| 2019-02-20 | Intermediate Casing Operation Performed |
| 2019-02-22 | Direction Drilling Operation Performed - Horizontal |
| 2019-03-11 | Finished Drilling |
| 2019-03-11 | Well Log Performed |
| 2019-03-11 | Well Mode changed to Drilled and Cased |
| 2019-03-12 | Well Log Performed |
| 2019-03-14 | Production Casing Operation Performed |
| 2019-03-20 | Rig Released |
| 2019-07-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-07-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-07-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-07-25 | Well Fluid changed to Gas |
| 2019-07-25 | Well Mode changed to Testing |
| 2019-08-29 | Well Began Production |
| 2019-08-29 | Well Fluid changed to Gas |
| 2019-08-29 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-02-05 | 851.90 | Deviate (5 - 79 degrees) |
| 2019-02-22 | 3379.90 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-07-20 | Multi-Stage Fracture | 5449.60 | 5449.70 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4921.60 | 4921.70 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4863.30 | 4863.40 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4804.70 | 4804.80 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4746.10 | 4746.20 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4688.80 | 4688.90 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4629.90 | 4630.00 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4571.20 | 4571.30 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4513.00 | 4513.10 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4454.50 | 4454.60 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4395.90 | 4396.00 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 5389.10 | 5389.20 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4336.80 | 4336.90 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4278.40 | 4278.50 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4220.20 | 4220.30 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4161.50 | 4161.60 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 4102.80 | 4102.90 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 4044.10 | 4044.20 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 3985.50 | 3985.60 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 3927.10 | 3927.20 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 3868.60 | 3868.70 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 3810.10 | 3810.20 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 5330.70 | 5330.80 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 3751.20 | 3751.30 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 3692.90 | 3693.00 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 3634.20 | 3634.30 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 3575.60 | 3575.70 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 3517.20 | 3517.30 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 3456.40 | 3456.50 | 0 |
| 2019-07-22 | Multi-Stage Fracture | 3409.90 | 3410.00 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 5272.70 | 5272.80 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 5213.60 | 5213.70 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 5154.90 | 5155.00 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 5097.50 | 5097.60 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 5039.10 | 5039.20 | 0 |
| 2019-07-21 | Multi-Stage Fracture | 4980.00 | 4980.10 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2019-07-20 | 2019-07-22 | 3,253 | 12,087 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 86.0212 | N/A | |||
| 40/70 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 2.3478 | N/A | ||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 10.4211 | N/A | ||
| 50/140 Sand (Domestic) | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.0425 | N/A | ||
| SaniFrac 8844. Biocide | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0116 | N/A | |
| Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0116 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0116 | N/A | ||||
| Polyethylene glycol | 25322-68-3 | 100 | 0.0116 | N/A | ||||
| Sodium bromide | 7647-15-6 | 100 | 0.0116 | N/A | ||||
| DWP-913. Clay Control | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0481 | N/A | |
| DynaRate 6000. Anionic Friction Reducer | Calfrac | Friction Reducer | Distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0908 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0908 | N/A | ||||
| Proprietary | Trade Secret | 100 | 0.0908 | N/A | ||||
| DAP-902. Scale Inhibitor | Calfrac | Scale Inhibitor | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0165 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2019-07-17 | 2019-07-22 | Central Water Distribution Facility | 12117 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 3081 | 0.0 | 0.0 | 0.0 |
| 2020 | 2168 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-02-22 | No Incident Encountered | 0.00 | 0.00 |
| 2019-07-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]