If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616063301000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.323426,"lon":-118.857949,"icon":""}]} |
| Location: 00/01-33-061-06W6/0 | |
| Location Alias: 00/01-33-61-06 W6M | |
| Location Alias 2: 00/01-33-061-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 33 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: JUPITER KAKWA 1-33-61-6 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0442188 | |
| License Date: 2012-01-03 | |
| License Status: Amended | |
| Spud Date: 2012-02-28 | |
| Final Drill Date: 2012-04-23 | |
| Well Total Depth: 5276.00 m | |
| Surface Hole Latitude: 54.323426 | |
| Surface Hole Longitude: -118.857949 |
| Date | Event |
|---|---|
| 2012-01-03 | Obtained License |
| 2012-02-29 | Surface Casing Operation Performed |
| 2012-03-19 | Well Log Performed |
| 2012-03-21 | Well Log Performed |
| 2012-03-27 | Intermediate Casing Operation Performed |
| 2012-03-28 | Lost Circulation Occurred |
| 2012-04-05 | Direction Drilling Operation Performed - Deviate |
| 2012-04-10 | Direction Drilling Operation Performed - Horizontal |
| 2012-04-23 | Finished Drilling |
| 2012-04-23 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-04-23 | Well Log Performed |
| 2012-04-23 | Well Mode changed to Drilled and Cased |
| 2012-04-27 | Production Casing Operation Performed |
| 2012-04-27 | Rig Released |
| 2012-04-27 | Well Log Performed |
| 2012-08-15 | Well Log Performed |
| 2012-08-17 | Well Fluid changed to Gas |
| 2012-08-17 | Well Mode changed to Testing |
| 2012-08-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-08-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-08-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-08-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-02 | Well Began Production |
| 2012-09-02 | Well Fluid changed to Gas |
| 2012-09-02 | Well Mode changed to Flowing |
| 2015-04-22 | Well Fluid changed to Gas |
| 2015-04-22 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-04-05 | 2996.00 | Deviate (5 - 79 degrees) |
| 2012-04-10 | 3327.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-04-23 | Open Hole/Barefoot Completion | 5236.30 | 5276.00 | 0 |
| 2012-08-21 | Multi-Stage Fracture | 4196.20 | 4197.00 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 4070.00 | 4070.80 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3943.80 | 3944.60 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3817.60 | 3818.40 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3691.40 | 3692.20 | 0 |
| 2012-08-22 | Multi-Stage Fracture | 3566.40 | 3567.20 | 0 |
| 2012-08-23 | Multi-Stage Fracture | 3440.20 | 3441.00 | 0 |
| 2012-08-23 | Multi-Stage Fracture | 3314.00 | 3314.80 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 5212.60 | 5214.00 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 5079.60 | 5080.40 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 4965.50 | 4966.30 | 0 |
| 2012-08-20 | Multi-Stage Fracture | 4827.20 | 4828.00 | 0 |
| 2012-08-21 | Multi-Stage Fracture | 4701.00 | 4701.80 | 0 |
| 2012-08-21 | Multi-Stage Fracture | 4574.80 | 4575.60 | 0 |
| 2012-08-21 | Multi-Stage Fracture | 4448.60 | 4449.40 | 0 |
| 2012-08-21 | Multi-Stage Fracture | 4322.40 | 4323.20 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 2741 | 0.0 | 0.0 | 0.0 |
| 2013 | 6882 | 0.0 | 0.0 | 0.0 |
| 2014 | 7655 | 0.0 | 0.0 | 0.0 |
| 2015 | 8708 | 0.0 | 0.0 | 0.0 |
| 2016 | 7128 | 0.0 | 0.0 | 0.0 |
| 2017 | 7118 | 0.0 | 0.0 | 0.0 |
| 2018 | 7773 | 0.0 | 0.0 | 0.0 |
| 2019 | 8516 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-03-28 | Lost Circulation | 1500.00 | 2972.00 |
| 2012-09-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]