If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616063408020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.319903,"lon":-118.826935,"icon":""}]} |
| Location: 02/08-34-061-06W6/0 | |
| Location Alias: 02/08-34-61-06 W6M | |
| Location Alias 2: 02/08-34-061-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 34 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: HARVEST HZ KAKWA 8-34-61-6 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0471340 | |
| License Date: 2014-11-13 | |
| License Status: Issued | |
| Spud Date: 2014-12-30 | |
| Final Drill Date: 2015-02-12 | |
| Well Total Depth: 4602.00 m | |
| Surface Hole Latitude: 54.319903 | |
| Surface Hole Longitude: -118.826935 |
| Date | Event |
|---|---|
| 2014-11-13 | Obtained License |
| 2014-12-31 | Lost Circulation Occurred |
| 2015-01-05 | Surface Casing Operation Performed |
| 2015-01-16 | Intermediate Casing Operation Performed |
| 2015-01-18 | Direction Drilling Operation Performed - Deviate |
| 2015-01-22 | Well Log Performed |
| 2015-01-24 | Direction Drilling Operation Performed - Horizontal |
| 2015-02-12 | Finished Drilling |
| 2015-02-12 | Well Log Performed |
| 2015-02-12 | Well Mode changed to Drilled and Cased |
| 2015-02-15 | Perforation Treatment Performed - Open-Hole Completion |
| 2015-02-15 | Production Casing Operation Performed |
| 2015-02-16 | Rig Released |
| 2015-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-07-24 | Well Began Production |
| 2015-07-24 | Well Fluid changed to Gas |
| 2015-07-24 | Well Mode changed to Flowing |
| 2020-01-01 | Well Fluid changed to Gas |
| 2020-01-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-12-30 | Precision Drilling Corporation | 622 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-01-18 | 2851.20 | Deviate (5 - 79 degrees) |
| 2015-01-24 | 3258.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-02-15 | Open Hole/Barefoot Completion | 4595.00 | 4602.00 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 3962.20 | 3962.30 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 3888.00 | 3888.10 | 0 |
| 2015-03-12 | Multi-Stage Fracture | 3739.50 | 3739.60 | 0 |
| 2015-03-12 | Multi-Stage Fracture | 3666.40 | 3666.50 | 0 |
| 2015-03-12 | Multi-Stage Fracture | 3592.30 | 3592.40 | 0 |
| 2015-03-12 | Multi-Stage Fracture | 3518.10 | 3518.20 | 0 |
| 2015-03-12 | Multi-Stage Fracture | 3444.00 | 3444.10 | 0 |
| 2015-03-12 | Multi-Stage Fracture | 3369.80 | 3369.90 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4557.60 | 4557.70 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4483.00 | 4483.10 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4414.40 | 4414.50 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4344.20 | 4344.30 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4270.00 | 4270.10 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 4195.80 | 4195.90 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 4110.60 | 4110.70 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 4036.50 | 4036.60 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-03-08 | 2015-03-12 | 3,102 | 4,437 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 81.5566 | N/A | |||
| 30/50 Atlas CRC | Calfrac | Hexamethylenetetramine | 100-97-0 | 100 | 2.8698 | N/A | ||
| Phenolic Resin | 9003-35-4 | 100 | 2.8698 | N/A | ||||
| Quartz (SiO2) | 14808-60-7 | 100 | 2.8698 | N/A | ||||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 13.7256 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0128 | N/A | |
| Water | 7732-18-5 | 100 | 0.0131 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0774 | N/A | |
| DWP-937 | Calfrac | Demulsifier | Citrus terpenes | 94266-47-4 | 100 | 0.083 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0832 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.083 | N/A | ||||
| Triethylene glycol | 112-27-6 | 100 | 0.0832 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0832 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 2.1795 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0923 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-01-09 | 2015-01-10 | Surface Water - River | 2942 |
| 2015-02-16 | 2015-02-27 | Oilfield Produced Water | 1495 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 3605 | 0.0 | 0.0 | 0.0 |
| 2016 | 8517 | 0.0 | 0.0 | 0.0 |
| 2017 | 8509 | 0.0 | 0.0 | 0.0 |
| 2018 | 8637 | 0.0 | 0.0 | 0.0 |
| 2019 | 8484 | 0.0 | 0.0 | 0.0 |
| 2020 | 2082 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-12-31 | Lost Circulation | 143.00 | 152.00 |
| 2015-03-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]