X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616092011000

Well Details

Well ID: 0616092011000
Loading map...
Location: 00/11-20-061-09W6/0
Location Alias: 00/11-20-61-09 W6M
Location Alias 2: 00/11-20-061-09 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 09
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARVEST LYNX 11-20-61-9
Operator Name: Harvest Operations Corp.
License Number: 0239308
License Date: 2000-06-28
License Status: Suspension
Spud Date: 2000-08-07
Final Drill Date: 2000-09-19
Well Total Depth: 3267.00 m
Surface Hole Latitude: 54.298928
Surface Hole Longitude: -119.323072

For data sources see[1][2]

Well History

Date Event
2000-06-28 Obtained License
2000-08-13 Surface Casing Operation Performed
2000-08-21 Direction Drilling Operation Performed - Deviate
2000-08-24 Well Mode changed to Drilled and Cased
2000-09-19 Finished Drilling
2000-09-20 Drill Stem Test Performed
2000-09-20 Well Log Performed
2000-09-21 Well Log Performed
2000-09-24 Production Casing Operation Performed
2000-09-24 Rig Released
2000-09-30 Well Log Performed
2000-10-03 Perforation Treatment Performed - Jet Perforation
2000-10-07 Perforation Treatment Performed - Fractured
2000-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-10 Plug Back Performed
2000-10-11 Perforation Treatment Performed - Jet Perforation
2000-10-11 Well Mode changed to Drilled and Cased
2000-10-14 Perforation Treatment Performed - Fractured
2003-11-04 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-08-21 1475.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-10-03 Perforation 3122.50 3125.00 14
2000-10-03 Perforation 3128.00 3136.00 14
2000-10-07 Fracture 3122.50 3136.00 0
2000-10-10 Packing Device Capped w/Cement 3106.00 3114.00 0
2000-10-11 Perforation 3076.00 3080.00 14
2000-10-11 Perforation 3069.00 3074.50 14
2000-10-14 Fracture 3069.00 3080.00 0
2003-11-04 Chemical Squeeze 3069.00 3074.50 0
2003-11-04 Chemical Squeeze 3076.00 3080.00 0

For data sources see[5]



References