X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616092810002

Well Details

Well ID: 0616092810002
Loading map...
Location: 00/10-28-061-09W6/2
Location Alias: 00/10-28-61-09 W6M
Location Alias 2: 00/10-28-061-09 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 09
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARVEST LYNX 10-28-61-9
Operator Name: Harvest Operations Corp.
License Number: 0079259
License Date: 1979-11-16
License Status: Issued
Spud Date: 1979-12-09
Final Drill Date: 1980-04-25
Well Total Depth: 4200.00 m
Surface Hole Latitude: 54.308411
Surface Hole Longitude: -119.282916

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-11-16 Obtained License
1980-02-19 Well Log Performed
1980-02-21 Drill Stem Test Performed
1980-03-08 Drill Stem Test Performed
1980-03-09 Lost Circulation Occurred
1980-04-25 Finished Drilling
1980-04-25 Well Log Performed
1980-05-05 Production Casing Operation Performed
1980-07-30 Perforation Treatment Performed - Jet Perforation
1980-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-08-02 Perforation Treatment Performed - Jet Perforation
1980-08-03 Perforation Treatment Performed - Fractured
1980-08-10 Perforation Treatment Performed - Jet Perforation
1980-08-15 Perforation Treatment Performed - Fractured
1981-02-08 Perforation Treatment Performed - Jet Perforation
1981-02-20 Well Mode changed to Drilled and Cased
1981-09-26 Perforation Treatment Performed - Fractured
1982-08-19 Well Began Production
1982-08-19 Well Fluid changed to Gas
1982-08-19 Well Mode changed to Flowing
2006-02-02 Well Fluid changed to Gas
2006-02-02 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-30 Perforation 3910.00 3917.00 7
1980-08-01 Packing Device Capped w/Cement 3905.00 3905.00 0
1980-08-02 Perforation 3869.00 3875.00 7
1980-08-03 Fracture 3869.00 3875.00 0
1980-08-10 Perforation 3079.00 3085.50 7
1980-08-15 Fracture 3079.00 3085.50 0
1981-02-08 Perforation 3044.00 3050.50 7
1981-02-08 Perforation 3052.00 3054.00 7
1981-09-26 Fracture 3079.00 3085.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2137 0.0 0.0 0.0
1983 8338 0.0 0.0 0.0
1984 7169 0.0 0.0 0.0
1985 6626 0.0 0.0 0.0
1986 5589 0.0 0.0 0.0
1987 5121 0.0 0.0 0.0
1988 7855 0.0 0.0 0.0
1989 8370 0.0 0.0 0.0
1990 8001 0.0 0.0 0.0
1991 7531 0.0 0.0 0.0
1992 7938 0.0 0.0 0.0
1993 8544 0.0 0.0 0.0
1994 8434 0.0 0.0 0.0
1995 8117 0.0 0.0 0.0
1996 7932 0.0 0.0 0.0
1997 7904 0.0 0.0 0.0
1998 8446 0.0 0.0 0.0
1999 8613 0.0 0.0 0.0
2000 8735 0.0 0.0 0.0
2001 8504 0.0 0.0 0.0
2002 7982 0.0 0.0 0.0
2003 8584 0.0 0.0 0.0
2004 8125 0.0 0.0 0.0
2005 8418 0.0 0.0 0.0
2006 8487 0.0 0.0 0.0
2007 8653 0.0 0.0 0.0
2008 8363 0.0 0.0 0.0
2009 8331 0.0 0.0 0.0
2010 7864 0.0 0.0 0.0
2011 8159 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 7813 0.0 0.0 0.0
2015 8519 0.0 0.0 0.0
2016 8601 0.0 0.0 0.0
2017 7799 0.0 0.0 0.0
2018 8501 0.0 0.0 0.0
2019 7596 0.0 0.0 0.0
2020 2068 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-03-09 Lost Circulation 3055.00 3058.00

For data sources see[6]

References