X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616092810003

Well Details

Well ID: 0616092810003
Loading map...
Location: 00/10-28-061-09W6/3
Location Alias: 00/10-28-61-09 W6M
Location Alias 2: 00/10-28-061-09 W6/03
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 09
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARVEST LYNX 10-28-61-9
Operator Name: Harvest Operations Corp.
License Number: 0079259
License Date: 1979-11-16
License Status: Issued
Spud Date: 1979-12-09
Final Drill Date: 1980-04-25
Well Total Depth: 4200.00 m
Surface Hole Latitude: 54.308411
Surface Hole Longitude: -119.282916

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-11-16 Obtained License
1980-02-19 Well Log Performed
1980-02-21 Drill Stem Test Performed
1980-03-08 Drill Stem Test Performed
1980-03-09 Lost Circulation Occurred
1980-04-25 Finished Drilling
1980-04-25 Well Log Performed
1980-04-25 Well Mode changed to Drilled and Cased
1980-05-05 Production Casing Operation Performed
1980-07-30 Perforation Treatment Performed - Jet Perforation
1980-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-08-02 Perforation Treatment Performed - Jet Perforation
1980-08-03 Perforation Treatment Performed - Fractured
1980-08-10 Perforation Treatment Performed - Jet Perforation
1980-08-15 Perforation Treatment Performed - Fractured
1981-02-08 Perforation Treatment Performed - Jet Perforation
1981-09-26 Perforation Treatment Performed - Fractured
1982-08-19 Well Began Production
1982-08-19 Well Fluid changed to Gas
1982-08-19 Well Mode changed to Flowing
1998-06-01 Well Fluid changed to Gas
1998-06-01 Well Mode changed to Suspended
2006-02-02 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-30 Perforation 3910.00 3917.00 7
1980-08-01 Packing Device Capped w/Cement 3905.00 3905.00 0
1980-08-02 Perforation 3869.00 3875.00 7
1980-08-03 Fracture 3869.00 3875.00 0
1980-08-10 Perforation 3079.00 3085.50 7
1980-08-15 Fracture 3079.00 3085.50 0
1981-02-08 Perforation 3044.00 3050.50 7
1981-02-08 Perforation 3052.00 3054.00 7
1981-09-26 Fracture 3079.00 3085.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2172 0.0 0.0 0.0
1983 8354 0.0 0.0 0.0
1984 7356 0.0 0.0 0.0
1985 6307 0.0 0.0 0.0
1986 4606 0.0 0.0 0.0
1987 3614 0.0 0.0 0.0
1988 7287 0.0 0.0 0.0
1989 7436 0.0 0.0 0.0
1990 7562 0.0 0.0 0.0
1991 7332 0.0 0.0 0.0
1992 816 0.0 0.0 0.0
1993 1709 0.0 0.0 0.0
1994 185 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-03-09 Lost Circulation 3055.00 3058.00

For data sources see[6]

References