X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624143207000

Well Details

Well ID: 0624143207000
Loading map...
Location: 00/07-32-062-14W4/0
Location Alias: 00/07-32-62-14 W4M
Location Alias 2: 00/07-32-062-14 W4/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 14
Section: 32
County/Municipality: Kikino Metis Settlement
Well Name: SOC CRAIGND 7-32-62-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0092362
License Date: 1981-09-24
License Status: Issued
Spud Date: 1981-10-19
Final Drill Date: 1981-10-21
Well Total Depth: 480.40 m
Surface Hole Latitude: 54.404072
Surface Hole Longitude: -112.060427

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-24 Obtained License
1981-10-21 Finished Drilling
1981-10-21 Well Log Performed
1981-10-23 Production Casing Operation Performed
1982-10-25 Perforation Treatment Performed - Open-Hole Completion
1982-10-26 Perforation Treatment Performed - Jet Perforation
1982-10-27 Well Mode changed to Drilled and Cased
1983-12-17 Well Began Production
1983-12-17 Well Fluid changed to Gas
1983-12-17 Well Mode changed to Flowing
1996-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-27 Plug Back Performed
1996-11-27 Well Fluid changed to Gas
1996-11-27 Well Mode changed to Abandoned Zone
1999-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-08 Perforation Treatment Performed - Jet Perforation
2003-08-08 Plug Back Performed
2003-08-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-10-25 Open Hole/Barefoot Completion 471.90 480.40 0
1982-10-26 Perforation 409.00 413.00 13
1982-10-26 Perforation 424.50 426.50 13
1982-10-26 Perforation 438.00 439.50 13
1996-11-27 Packing Device Capped w/Cement 461.00 469.00 0
1999-12-18 Packing Device Capped w/Cement 418.00 421.00 0
2003-08-08 Packing Device Capped w/Cement 392.00 407.00 0
2003-08-08 Perforation 338.00 342.00 17
2003-08-08 Perforation 336.00 337.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 355 0.0 0.0 0.0
1984 5038 0.0 0.0 0.0
1985 6234 0.0 0.0 0.0
1986 6467 0.0 0.0 0.0
1987 6607 0.0 0.0 0.0
1988 6699 0.0 0.0 0.0
1989 5404 0.0 0.0 0.0
1990 967 0.0 0.0 0.0
1991 2682 0.0 0.0 0.0
1992 3143 0.0 0.0 0.0
1995 5416 0.0 0.0 0.0
1996 1148 0.0 0.0 0.0

For data sources see[5]

References