X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624143207002

Well Details

Well ID: 0624143207002
Loading map...
Location: 00/07-32-062-14W4/2
Location Alias: 00/07-32-62-14 W4M
Location Alias 2: 00/07-32-062-14 W4/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 14
Section: 32
County/Municipality: Kikino Metis Settlement
Well Name: SOC CRAIGND 7-32-62-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0092362
License Date: 1981-09-24
License Status: Issued
Spud Date: 1981-10-19
Final Drill Date: 1981-10-21
Well Total Depth: 480.40 m
Surface Hole Latitude: 54.404072
Surface Hole Longitude: -112.060427

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-24 Obtained License
1981-10-21 Finished Drilling
1981-10-21 Well Log Performed
1981-10-23 Production Casing Operation Performed
1982-10-25 Perforation Treatment Performed - Open-Hole Completion
1982-10-26 Perforation Treatment Performed - Jet Perforation
1982-10-27 Well Mode changed to Drilled and Cased
1983-12-17 Well Began Production
1983-12-17 Well Fluid changed to Gas
1983-12-17 Well Mode changed to Flowing
1996-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-27 Plug Back Performed
1999-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-01 Well Fluid changed to Gas
2000-01-01 Well Mode changed to Suspended
2000-01-02 Well Fluid changed to Gas
2000-01-02 Well Mode changed to Suspended
2003-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-08 Perforation Treatment Performed - Jet Perforation
2003-08-08 Plug Back Performed
2003-08-08 Well Fluid changed to Gas
2003-08-08 Well Log Performed
2003-08-08 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-10-25 Open Hole/Barefoot Completion 471.90 480.40 0
1982-10-26 Perforation 409.00 413.00 13
1982-10-26 Perforation 424.50 426.50 13
1982-10-26 Perforation 438.00 439.50 13
1996-11-27 Packing Device Capped w/Cement 461.00 469.00 0
1999-12-18 Packing Device Capped w/Cement 418.00 421.00 0
2003-08-08 Packing Device Capped w/Cement 392.00 407.00 0
2003-08-08 Perforation 338.00 342.00 17
2003-08-08 Perforation 336.00 337.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 357 0.0 0.0 0.0
1984 5636 0.0 0.0 0.0
1985 5770 0.0 0.0 0.0
1986 6541 0.0 0.0 0.0
1987 6629 0.0 0.0 0.0
1988 6692 0.0 0.0 0.0
1989 7144 0.0 0.0 0.0
1990 4709 0.0 0.0 0.0
1991 5528 0.0 0.0 0.0
1992 8251 0.0 0.0 0.0
1993 8686 0.0 0.0 0.0
1994 8683 0.0 0.0 0.0
1995 8570 0.0 0.0 0.0
1996 8393 0.0 0.0 0.0
1997 7477 0.0 0.0 0.0
1998 7080 0.0 0.0 0.0
1999 2513 0.0 0.0 0.0

For data sources see[5]

References