If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0624151116002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.353229,"lon":-112.131302,"icon":""}]} |
| Location: 00/16-11-062-15W4/2 | |
| Location Alias: 00/16-11-62-15 W4M | |
| Location Alias 2: 00/16-11-062-15 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 4 | |
| Range: 15 | |
| Section: 11 | |
| County/Municipality: Kikino Metis Settlement | |
| Well Name: CNRES CRAIGEND 16-11-62-15 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0183727 | |
| License Date: 1995-12-19 | |
| License Status: Abandoned | |
| Spud Date: 1996-02-15 | |
| Final Drill Date: 1996-02-18 | |
| Well Total Depth: 613.00 m | |
| Surface Hole Latitude: 54.353229 | |
| Surface Hole Longitude: -112.131302 |
| Date | Event |
|---|---|
| 1995-12-19 | Obtained License |
| 1996-02-15 | Well Log Performed |
| 1996-02-16 | Surface Casing Operation Performed |
| 1996-02-17 | Direction Drilling Operation Performed - Deviate |
| 1996-02-18 | Finished Drilling |
| 1996-02-18 | Well Log Performed |
| 1996-02-18 | Well Mode changed to Drilled and Cased |
| 1996-02-19 | Production Casing Operation Performed |
| 1996-02-19 | Rig Released |
| 1996-02-26 | Well Log Performed |
| 1996-02-27 | Perforation Treatment Performed - Open-Hole Completion |
| 1996-04-01 | Well Log Performed |
| 1997-02-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-02-09 | Plug Back Performed |
| 1997-02-10 | Perforation Treatment Performed - Jet Perforation |
| 1997-02-10 | Well Log Performed |
| 1997-02-11 | Perforation Treatment Performed - Jet Perforation |
| 1997-02-11 | Well Log Performed |
| 1997-02-13 | Well Began Production |
| 1997-02-13 | Well Fluid changed to Gas |
| 1997-02-13 | Well Mode changed to Flowing |
| 1998-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-03-04 | Perforation Treatment Performed - Jet Perforation |
| 1998-03-04 | Plug Back Performed |
| 1998-03-04 | Well Fluid changed to Gas |
| 1998-03-04 | Well Log Performed |
| 1998-03-04 | Well Mode changed to Abandoned Zone |
| 1998-03-05 | Well Log Performed |
| 1998-03-06 | Perforation Treatment Performed - Jet Perforation |
| 2010-01-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-01-10 | Plug Back Performed |
| 2010-01-26 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1996-02-17 | 139.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-02-27 | Open Hole/Barefoot Completion | 609.00 | 613.00 | 0 |
| 2010-01-10 | Packing Device Capped w/Cement | 464.10 | 472.60 | 0 |
| 2010-01-10 | Packing Device Capped w/Cement | 478.70 | 487.20 | 0 |
| 1997-02-09 | Packing Device Capped w/Cement | 594.00 | 602.00 | 0 |
| 1997-02-10 | Perforation | 545.10 | 548.40 | 13 |
| 1997-02-10 | Perforation | 550.00 | 551.00 | 13 |
| 1997-02-11 | Perforation | 482.50 | 483.00 | 13 |
| 1997-02-11 | Perforation | 483.70 | 484.50 | 13 |
| 1998-03-04 | Packing Device Capped w/Cement | 529.00 | 537.00 | 0 |
| 1998-03-04 | Perforation | 495.00 | 495.50 | 13 |
| 1998-03-06 | Perforation | 495.10 | 496.10 | 17 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1997 | 7581 | 0.0 | 0.0 | 0.0 |
| 1998 | 725 | 0.0 | 0.0 | 0.0 |
| 2001 | 168 | 0.0 | 0.0 | 0.0 |
For data sources see[6]