X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624152613003

Well Details

Well ID: 0624152613003
Loading map...
Location: 00/13-26-062-15W4/3
Location Alias: 00/13-26-62-15 W4M
Location Alias 2: 00/13-26-062-15 W4/03
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 15
Section: 26
County/Municipality: Kikino Metis Settlement
Well Name: SOC CRAIGND 13-26-62-15
Operator Name: AlphaBow Energy Ltd.
License Number: 0186106
License Date: 1996-02-22
License Status: Abandoned
Spud Date: 1996-06-04
Final Drill Date: 1996-06-06
Well Total Depth: 582.00 m
Surface Hole Latitude: 54.395199
Surface Hole Longitude: -112.148295

For data sources see[1][2]

Well History

Date Event
1996-02-22 Obtained License
1996-06-04 Surface Casing Operation Performed
1996-06-06 Finished Drilling
1996-06-06 Production Casing Operation Performed
1996-06-06 Rig Released
1996-06-06 Well Log Performed
1996-06-06 Well Mode changed to Drilled and Cased
1996-07-09 Perforation Treatment Performed - Open-Hole Completion
1996-07-10 Perforation Treatment Performed - Jet Perforation
1996-10-01 Well Began Production
1996-10-01 Well Fluid changed to Gas
1996-10-01 Well Mode changed to Flowing
2001-01-01 Well Fluid changed to Gas
2001-01-01 Well Mode changed to Pumping
2003-03-20 Perforation Treatment Performed - Jet Perforation
2003-03-20 Well Log Performed
2007-06-12 Well Fluid changed to Gas
2007-06-12 Well Mode changed to Suspended
2014-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-12-17 Perforation Treatment Performed - Cement Squeeze
2014-12-17 Plug Back Performed
2014-12-17 Well Fluid changed to Gas
2014-12-17 Well Mode changed to Abandoned Zone
2015-01-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-09 Open Hole/Barefoot Completion 577.00 582.00 0
2014-12-17 Cement Squeeze 436.50 440.00 0
2014-12-17 Cement Squeeze 431.50 435.50 0
1996-07-10 Perforation 509.00 509.50 13
1996-07-10 Perforation 467.00 467.50 13
1996-07-10 Perforation 468.50 469.00 13
2003-03-20 Perforation 436.50 440.00 17
2003-03-20 Perforation 431.50 435.50 17
2014-12-17 Packing Device Capped w/Cement 370.40 470.50 0
2014-12-17 Cement Squeeze 468.50 469.00 0
2014-12-17 Cement Squeeze 467.00 467.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1821 0.0 0.0 0.0
1997 6245 0.0 0.0 0.0
1998 8506 0.0 0.0 0.0
1999 8749 0.0 0.0 0.0
2000 8568 0.0 0.0 0.0
2001 4276 0.0 0.0 0.0
2002 91 0.0 0.0 0.0
2003 1 0.0 0.0 0.0
2004 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References