If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0625100903002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.34299,"lon":-115.44323,"icon":""}]} |
| Location: 00/03-09-062-10W5/2 | |
| Location Alias: 00/03-09-62-10 W5M | |
| Location Alias 2: 00/03-09-062-10 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 5 | |
| Range: 10 | |
| Section: 09 | |
| County/Municipality: Woodlands County | |
| Well Name: OEL CARIBOU 3-9-62-10 | |
| Operator Name: Clearview Resources Ltd. | |
| License Number: 0363614 | |
| License Date: 2006-09-26 | |
| License Status: Amended | |
| Spud Date: 2006-10-14 | |
| Final Drill Date: 2006-10-21 | |
| Well Total Depth: 1575.00 m | |
| Surface Hole Latitude: 54.342990 | |
| Surface Hole Longitude: -115.443230 |
| Date | Event |
|---|---|
| 2006-09-26 | Obtained License |
| 2006-10-15 | Surface Casing Operation Performed |
| 2006-10-18 | Well Log Performed |
| 2006-10-21 | Finished Drilling |
| 2006-10-21 | Well Log Performed |
| 2006-10-21 | Well Mode changed to Drilled and Cased |
| 2006-10-22 | Well Log Performed |
| 2006-10-23 | Production Casing Operation Performed |
| 2006-10-23 | Rig Released |
| 2006-11-05 | Well Log Performed |
| 2006-11-06 | Perforation Treatment Performed - Jet Perforation |
| 2006-11-06 | Well Log Performed |
| 2006-11-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-11-09 | Plug Back Performed |
| 2006-11-09 | Well Log Performed |
| 2006-11-12 | Perforation Treatment Performed - Jet Perforation |
| 2006-11-12 | Well Log Performed |
| 2006-11-17 | Perforation Treatment Performed - Fractured |
| 2006-12-09 | Well Began Production |
| 2006-12-09 | Well Fluid changed to Crude Oil |
| 2006-12-09 | Well Mode changed to Pumping |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-11-06 | Perforation | 1541.00 | 1544.50 | 17 |
| 2006-11-09 | Packing Device Capped w/Cement | 1519.50 | 1527.50 | 0 |
| 2006-11-12 | Perforation | 1499.00 | 1503.00 | 17 |
| 2006-11-17 | Fracture | 1499.00 | 1503.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 600 | 0.0 | 0.0 | 0.0 |
| 2007 | 3536 | 0.0 | 0.0 | 0.0 |
| 2008 | 6585 | 0.0 | 0.0 | 0.0 |
| 2009 | 7759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8642 | 0.0 | 0.0 | 0.0 |
| 2011 | 8327 | 0.0 | 0.0 | 0.0 |
| 2012 | 8702 | 0.0 | 0.0 | 0.0 |
| 2013 | 8726 | 0.0 | 0.0 | 0.0 |
| 2014 | 8708 | 0.0 | 0.0 | 0.0 |
| 2015 | 8759 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8607 | 0.0 | 0.0 | 0.0 |
| 2018 | 8637 | 0.0 | 0.0 | 0.0 |
| 2019 | 8240 | 0.0 | 0.0 | 0.0 |
| 2020 | 1679 | 0.0 | 0.0 | 0.0 |
For data sources see[5]