If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0625120206002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.332738,"lon":-115.691291,"icon":""}]} |
| Location: 00/06-02-062-12W5/2 | |
| Location Alias: 00/06-02-62-12 W5M | |
| Location Alias 2: 00/06-02-062-12 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 02 | |
| County/Municipality: Woodlands County | |
| Well Name: ACCEL HOLDINGS CARSONN 6-2-62-12 | |
| Operator Name: ACCEL Canada Holdings Limited | |
| License Number: 0018703 | |
| License Date: 1960-02-15 | |
| License Status: Issued | |
| Spud Date: 1960-04-09 | |
| Final Drill Date: 1960-05-28 | |
| Well Total Depth: 2743.20 m | |
| Surface Hole Latitude: 54.332738 | |
| Surface Hole Longitude: -115.691291 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1960-02-15 | Obtained License |
| 1960-04-10 | Lost Circulation Occurred |
| 1960-05-16 | Liner Casing Operation Performed |
| 1960-05-28 | Finished Drilling |
| 1960-05-28 | Well Mode changed to Drilled and Cased |
| 1960-05-29 | Drill Stem Test Performed |
| 1960-06-12 | Perforation Treatment Performed - Jet Perforation |
| 1960-06-25 | Well Began Production |
| 1960-06-25 | Well Fluid changed to Crude Oil |
| 1960-06-25 | Well Mode changed to Flowing |
| 1961-08-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1970-01-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-01-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-07-18 | Perforation Treatment Performed - Jet Perforation |
| 1982-07-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-07-25 | Perforation Treatment Performed - Fractured |
| 1990-02-09 | Well Fluid changed to Crude Oil |
| 1990-02-09 | Well Mode changed to Pumping |
| 1990-03-16 | Perforation Treatment Performed - Jet Perforation |
| 1990-03-16 | Well Log Performed |
| 1990-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-03-21 | Well Fluid changed to Crude Oil |
| 1990-03-21 | Well Log Performed |
| 1990-03-21 | Well Mode changed to Suspended |
| 2008-05-03 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1960-06-12 | Perforation | 2696.90 | 2698.70 | 7 |
| 1970-01-09 | Acid Treatment | 2671.00 | 2698.70 | 0 |
| 1976-01-21 | Acid Treatment | 2671.00 | 2698.70 | 0 |
| 1982-07-18 | Perforation | 2646.00 | 2646.90 | 12 |
| 1982-07-20 | Acid Treatment | 2646.00 | 2655.10 | 0 |
| 1982-07-25 | Fracture | 2671.00 | 2698.70 | 0 |
| 1990-03-16 | Perforation | 2674.30 | 2676.40 | 13 |
| 1990-03-16 | Perforation | 2682.50 | 2686.50 | 13 |
| 1990-03-16 | Perforation | 2696.90 | 2698.70 | 13 |
| 1990-03-19 | Acid Treatment | 2646.00 | 2698.70 | 0 |
| 2008-05-03 | Fracture | 2671.00 | 2686.50 | 0 |
| 1960-06-12 | Perforation | 2691.40 | 2692.60 | 7 |
| 1960-06-12 | Perforation | 2689.60 | 2690.50 | 7 |
| 1960-06-12 | Perforation | 2682.50 | 2686.50 | 7 |
| 1960-06-12 | Perforation | 2679.50 | 2680.10 | 7 |
| 1960-06-12 | Perforation | 2674.30 | 2676.40 | 7 |
| 1960-06-12 | Perforation | 2671.00 | 2672.20 | 7 |
| 1960-06-12 | Perforation | 2648.10 | 2655.10 | 7 |
| 1961-08-31 | Acid Treatment | 2648.10 | 2655.10 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1970 | 741 | 0.0 | 0.0 | 0.0 |
| 1971 | 2854 | 0.0 | 0.0 | 0.0 |
| 1972 | 7905 | 0.0 | 0.0 | 0.0 |
| 1973 | 8265 | 0.0 | 0.0 | 0.0 |
| 1974 | 8210 | 0.0 | 0.0 | 0.0 |
| 1975 | 8221 | 0.0 | 0.0 | 0.0 |
| 1976 | 4708 | 0.0 | 0.0 | 0.0 |
| 1977 | 4548 | 0.0 | 0.0 | 0.0 |
| 1979 | 185 | 0.0 | 0.0 | 0.0 |
| 1980 | 46 | 0.0 | 0.0 | 0.0 |
| 1982 | 134 | 0.0 | 0.0 | 0.0 |
| 1983 | 4380 | 0.0 | 0.0 | 0.0 |
| 1984 | 3929 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1960-04-10 | Lost Circulation | 82.20 | 182.80 |
For data sources see[6]