X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625220310000

Well Details

Well ID: 0625220310000
Loading map...
Location: 00/10-03-062-22W5/0
Location Alias: 00/10-03-62-22 W5M
Location Alias 2: 00/10-03-062-22 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 22
Section: 03
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN ET AL GRIZZLY 10-3-62-22
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0059889
License Date: 1976-08-24
License Status: Issued
Spud Date: 1976-09-30
Final Drill Date: 1976-10-26
Well Total Depth: 2412.50 m
Surface Hole Latitude: 54.336831
Surface Hole Longitude: -117.209138

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-24 Obtained License
1976-10-10 Drill Stem Test Performed
1976-10-23 Drill Stem Test Performed
1976-10-26 Finished Drilling
1976-10-26 Well Mode changed to Drilled and Cased
1976-10-28 Drill Stem Test Performed
1976-10-29 Kick Occurred
1976-10-30 Drill Stem Test Performed
1976-11-01 Production Casing Operation Performed
1977-01-21 Perforation Treatment Performed - Jet Perforation
1977-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-01-28 Perforation Treatment Performed - Jet Perforation
1979-01-19 Well Began Production
1979-01-19 Well Fluid changed to Gas
1979-01-19 Well Mode changed to Flowing
1980-06-01 Well Fluid changed to Gas
1980-06-01 Well Mode changed to Suspended
1982-04-01 Well Fluid changed to Gas
1982-04-01 Well Mode changed to Flowing
1983-09-01 Well Fluid changed to Gas
1983-09-01 Well Mode changed to Suspended
1985-03-01 Well Fluid changed to Gas
1985-03-01 Well Mode changed to Flowing
1986-02-16 Well Log Performed
1986-02-17 Perforation Treatment Performed - Jet Perforation
1987-09-28 Well Fluid changed to Gas
1987-09-28 Well Mode changed to Suspended
1994-01-24 Well Fluid changed to Gas
1994-01-24 Well Mode changed to Flowing
2006-10-16 Well Fluid changed to Gas
2006-10-16 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-01-21 Perforation 2314.00 2316.50 3
1977-01-21 Perforation 2319.50 2320.70 3
1977-01-23 Acid Treatment 2314.00 2320.70 0
1977-01-27 Packing Device Capped w/Cement 2296.70 2305.80 0
1977-01-28 Perforation 2163.50 2169.00 7
1986-02-17 Perforation 2163.50 2168.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 7659 0.0 0.0 0.0
1980 3487 0.0 0.0 0.0
1982 3389 0.0 0.0 0.0
1985 1822 0.0 0.0 0.0
1986 2837 0.0 0.0 0.0
1994 6694 0.0 0.0 0.0
1995 5541 0.0 0.0 0.0
1996 5771 0.0 0.0 0.0
1997 7930 0.0 0.0 0.0
1998 7360 0.0 0.0 0.0
1999 7968 0.0 0.0 0.0
2000 8201 0.0 0.0 0.0
2001 7540 0.0 0.0 0.0
2002 7894 0.0 0.0 0.0
2003 4898 0.0 0.0 0.0
2004 7452 0.0 0.0 0.0
2005 6867 0.0 0.0 0.0
2006 7871 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8495 0.0 0.0 0.0
2009 7703 0.0 0.0 0.0
2010 8399 0.0 0.0 0.0
2011 5155 0.0 0.0 0.0
2012 7904 0.0 0.0 0.0
2013 6772 0.0 0.0 0.0
2014 6575 0.0 0.0 0.0
2015 7974 0.0 0.0 0.0
2016 7664 0.0 0.0 0.0
2017 6173 0.0 0.0 0.0
2018 6590 0.0 0.0 0.0
2019 6645 0.0 0.0 0.0
2020 960 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-10-29 Kick 2412.50 2412.50

For data sources see[6]

References