If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625231204000 | |
Location: 00/04-12-062-23W5/0 | |
Location Alias: 00/04-12-62-23 W5M | |
Location Alias 2: 00/04-12-062-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 23 | |
Section: 12 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: AOSC HZ GRIZZLY 4-12-62-23 | |
Operator Name: Athabasca Oil Corporation | |
License Number: 0437599 | |
License Date: 2011-10-11 | |
License Status: Amended | |
Spud Date: 2012-07-13 | |
Final Drill Date: 2012-08-06 | |
Well Total Depth: 3816.00 m | |
Surface Hole Latitude: 54.354761 | |
Surface Hole Longitude: -117.323349 |
Date | Event |
---|---|
2011-10-11 | Obtained License |
2012-07-15 | Surface Casing Operation Performed |
2012-07-20 | Direction Drilling Operation Performed - Deviate |
2012-07-26 | Direction Drilling Operation Performed - Horizontal |
2012-08-06 | Finished Drilling |
2012-08-06 | Well Mode changed to Drilled and Cased |
2012-08-11 | Production Casing Operation Performed |
2012-08-11 | Well Log Performed |
2012-08-13 | Rig Released |
2012-09-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-28 | Well Began Production |
2012-09-28 | Well Fluid changed to Gas |
2012-09-28 | Well Mode changed to Flowing |
2019-07-01 | Well Fluid changed to Gas |
2019-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-13 | Nabors Drilling Limited | 82 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-20 | 2150.90 | Deviate (5 - 79 degrees) |
2012-07-26 | 2552.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-26 | Multi-Stage Fracture | 3761.40 | 3761.50 | 0 |
2012-09-27 | Multi-Stage Fracture | 3010.20 | 3010.30 | 0 |
2012-09-27 | Multi-Stage Fracture | 2926.80 | 2926.90 | 0 |
2012-09-27 | Multi-Stage Fracture | 2843.10 | 2843.20 | 0 |
2012-09-27 | Multi-Stage Fracture | 2759.70 | 2759.80 | 0 |
2012-09-27 | Multi-Stage Fracture | 2677.10 | 2677.20 | 0 |
2012-09-27 | Multi-Stage Fracture | 2606.00 | 2606.10 | 0 |
2012-09-26 | Multi-Stage Fracture | 3679.40 | 3679.50 | 0 |
2012-09-26 | Multi-Stage Fracture | 3595.40 | 3595.50 | 0 |
2012-09-26 | Multi-Stage Fracture | 3511.60 | 3511.70 | 0 |
2012-09-27 | Multi-Stage Fracture | 3428.00 | 3428.10 | 0 |
2012-09-27 | Multi-Stage Fracture | 3344.40 | 3344.50 | 0 |
2012-09-27 | Multi-Stage Fracture | 3260.70 | 3260.80 | 0 |
2012-09-27 | Multi-Stage Fracture | 3177.00 | 3177.10 | 0 |
2012-09-27 | Multi-Stage Fracture | 3093.50 | 3093.60 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 435 | 0.0 | 0.0 | 0.0 |
2013 | 5831 | 0.0 | 0.0 | 0.0 |
2014 | 7178 | 0.0 | 0.0 | 0.0 |
2015 | 7730 | 0.0 | 0.0 | 0.0 |
2016 | 8159 | 0.0 | 0.0 | 0.0 |
2017 | 7590 | 0.0 | 0.0 | 0.0 |
2018 | 7123 | 0.0 | 0.0 | 0.0 |
2019 | 8632 | 0.0 | 0.0 | 0.0 |
2020 | 1942 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-12 | No Incident Encountered | 0.00 | 0.00 |
2012-10-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]