X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625260404002

Well Details

Well ID: 0625260404002
Loading map...
Location: 00/04-04-062-26W5/2
Location Alias: 00/04-04-62-26 W5M
Location Alias 2: 00/04-04-062-26 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 26
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE HZ SIMON 4-4-62-26
Operator Name: Cequence Energy Ltd.
License Number: 0431288
License Date: 2011-02-07
License Status: Amended
Spud Date: 2011-02-21
Final Drill Date: 2011-12-04
Well Total Depth: 4720.00 m
Surface Hole Latitude: 54.343077
Surface Hole Longitude: -117.872460

For data sources see[1][2]

Well History

Date Event
2011-02-07 Obtained License
2011-03-10 Direction Drilling Operation Performed - Horizontal
2011-03-14 Well Log Performed
2011-03-14 Well Mode changed to Drilled and Cased
2011-03-16 Intermediate Casing Operation Performed
2011-12-04 Finished Drilling
2011-12-06 Liner Casing Operation Performed
2011-12-09 Rig Released
2011-12-16 Perforation Treatment Performed - Open-Hole Completion
2011-12-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-18 Well Began Production
2011-12-18 Well Fluid changed to Gas
2011-12-18 Well Mode changed to Flowing
2011-12-19 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-10 2377.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-16 Open Hole/Barefoot Completion 4709.40 4720.00 0
2011-12-19 Multi-Stage Fracture 3721.40 3721.50 0
2011-12-19 Multi-Stage Fracture 3596.30 3596.40 0
2011-12-19 Multi-Stage Fracture 3484.30 3484.40 0
2011-12-19 Multi-Stage Fracture 3385.80 3385.90 0
2011-12-19 Multi-Stage Fracture 3260.50 3260.60 0
2011-12-19 Multi-Stage Fracture 3132.20 3132.30 0
2011-12-19 Multi-Stage Fracture 3005.40 3005.50 0
2011-12-19 Multi-Stage Fracture 2892.80 2892.90 0
2011-12-17 Multi-Stage Fracture 4657.60 4660.20 0
2011-12-17 Multi-Stage Fracture 4545.70 4545.80 0
2011-12-17 Multi-Stage Fracture 4420.20 4420.30 0
2011-12-17 Multi-Stage Fracture 4308.10 4308.20 0
2011-12-17 Multi-Stage Fracture 4182.80 4182.90 0
2011-12-18 Multi-Stage Fracture 4070.90 4071.00 0
2011-12-18 Multi-Stage Fracture 3958.90 3959.00 0
2011-12-18 Multi-Stage Fracture 3833.50 3833.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 264 0.0 0.0 0.0
2012 8375 0.0 0.0 0.0
2013 8664 0.0 0.0 0.0
2014 8507 0.0 0.0 0.0
2015 4752 0.0 0.0 0.0
2016 3624 0.0 0.0 0.0
2017 5783 0.0 0.0 0.0
2018 2496 0.0 0.0 0.0
2019 8447 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[6]

References