If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0625260505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.31394,"lon":-117.856014,"icon":""}]} |
| Location: 00/05-05-062-26W5/0 | |
| Location Alias: 00/05-05-62-26 W5M | |
| Location Alias 2: 00/05-05-062-26 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 5 | |
| Range: 26 | |
| Section: 05 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: CEQUENCE 1-32 HZ SIMON 5-5-62-26 | |
| Operator Name: Cequence Energy Ltd. | |
| License Number: 0467751 | |
| License Date: 2014-07-02 | |
| License Status: Issued | |
| Spud Date: 2014-11-17 | |
| Final Drill Date: 2014-12-11 | |
| Well Total Depth: 5250.00 m | |
| Surface Hole Latitude: 54.313940 | |
| Surface Hole Longitude: -117.856014 |
| Date | Event |
|---|---|
| 2014-07-02 | Obtained License |
| 2014-11-20 | Surface Casing Operation Performed |
| 2014-11-23 | Direction Drilling Operation Performed - Deviate |
| 2014-11-30 | Direction Drilling Operation Performed - Horizontal |
| 2014-12-01 | Intermediate Casing Operation Performed |
| 2014-12-10 | Well Log Performed |
| 2014-12-11 | Finished Drilling |
| 2014-12-11 | Well Mode changed to Drilled and Cased |
| 2014-12-13 | Liner Casing Operation Performed |
| 2014-12-14 | Rig Released |
| 2014-12-17 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-12-31 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-01-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-01-15 | Well Began Production |
| 2015-01-15 | Well Fluid changed to Gas |
| 2015-01-15 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-11-17 | Canelson Drilling Inc. | 38 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-11-23 | 1976.90 | Deviate (5 - 79 degrees) |
| 2014-11-30 | 3148.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-12-17 | Open Hole/Barefoot Completion | 5245.00 | 5250.00 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4633.70 | 4633.80 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4560.90 | 4561.00 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4488.60 | 4488.70 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4417.60 | 4417.70 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4345.10 | 4345.20 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4258.90 | 4259.00 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4173.90 | 4174.00 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4088.40 | 4088.50 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4004.50 | 4004.60 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 3923.40 | 3923.50 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 5208.90 | 5209.00 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 3838.40 | 3838.50 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 3752.60 | 3752.70 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 3667.30 | 3667.40 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 3584.70 | 3584.80 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 3500.80 | 3500.90 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 3416.70 | 3416.80 | 0 |
| 2015-01-01 | Multi-Stage Fracture | 3330.60 | 3330.70 | 0 |
| 2015-01-01 | Multi-Stage Fracture | 3248.90 | 3249.00 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 5137.80 | 5137.90 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 5065.90 | 5066.00 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4993.30 | 4993.40 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4922.40 | 4922.50 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4850.90 | 4851.00 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4778.60 | 4778.70 | 0 |
| 2014-12-31 | Multi-Stage Fracture | 4705.70 | 4705.80 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-12-31 | 2015-01-01 | 2,906 | 7,985 | N/A |
| 2 | 2015-01-01 | 2015-01-01 | 2,906 | 0 | N/A |
| 3 | 2014-12-31 | 2014-12-31 | 2,906 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 77.4588 | N/A | |||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 15.1581 | N/A | ||
| 50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 2.532 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0113 | N/A | |
| Water | 7732-18-5 | 100 | 0.0115 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0686 | N/A | |
| DWP-937 | Calfrac | Demulsifier | Citrus terpenes | 94266-47-4 | 100 | 0.0751 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0754 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0751 | N/A | ||||
| Triethylene glycol | 112-27-6 | 100 | 0.0754 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0752 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 2.5091 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0816 | N/A | |
| 2 | 20/40 SB Excel | Calfrac | Quartz | 14808-60-7 | 100 | 2.3978 | N/A | |
| 3 | 30/50 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 2.5432 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-12-21 | 2014-12-27 | Oilfield Produced Water | 120 |
| 2014-07-13 | 2014-09-04 | Oilfield Produced Water | 70 |
| 2014-08-30 | 2014-12-03 | Recycled Fracturing Water (treated at well site) | 349 |
| 2014-12-23 | 2014-12-31 | Recycled Fracturing Water (treated at well site) | 79 |
| 2014-07-02 | 2014-08-31 | Recycled Fracturing Water (treated at well site) | 152 |
| 2014-07-31 | 2014-12-25 | Recycled Fracturing Water (treated at well site) | 118 |
| 2014-12-20 | 2014-12-31 | Recycled Fracturing Water (treated at well site) | 772 |
| 2014-11-20 | 2014-12-23 | Recycled Fracturing Water (treated at well site) | 190 |
| 2014-11-20 | 2014-12-31 | Recycled Fracturing Water (treated at well site) | 200 |
| 2014-08-29 | 2014-12-20 | Recycled Fracturing Water (treated at well site) | 39 |
| 2014-08-19 | 2014-08-19 | Recycled Fracturing Water (treated at well site) | 42 |
| 2014-12-24 | 2014-12-24 | Recycled Fracturing Water (treated at well site) | 6 |
| 2014-12-31 | 2014-12-31 | Recycled Fracturing Water (treated at well site) | 160 |
| 2014-12-31 | 2014-12-31 | Recycled Fracturing Water (treated at well site) | 753 |
| 2014-12-31 | 2014-12-31 | Recycled Fracturing Water (treated at well site) | 2113 |
| 2014-12-31 | 2014-12-31 | Recycled Fracturing Water (treated at well site) | 70 |
| 2014-12-31 | 2014-12-31 | Recycled Fracturing Water (treated at well site) | 65 |
| 2014-08-29 | 2014-08-29 | Recycled Fracturing Water (treated at well site) | 677 |
| 2014-12-26 | 2014-12-31 | Recycled Fracturing Water (treated at well site) | 180 |
| 2014-12-19 | 2014-12-19 | Recycled Fracturing Water (treated at well site) | 1993 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 7960 | 0.0 | 0.0 | 0.0 |
| 2016 | 8724 | 0.0 | 0.0 | 0.0 |
| 2017 | 8136 | 0.0 | 0.0 | 0.0 |
| 2018 | 8584 | 0.0 | 0.0 | 0.0 |
| 2019 | 8615 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-12-14 | No Incident Encountered | 0.00 | 0.00 |
| 2015-01-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]