If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0625270101002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.341906,"lon":-117.927944,"icon":""}]} |
| Location: 00/01-01-062-27W5/2 | |
| Location Alias: 00/01-01-62-27 W5M | |
| Location Alias 2: 00/01-01-062-27 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 5 | |
| Range: 27 | |
| Section: 01 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: CAL HZ SIMON 1-1-62-27 | |
| Operator Name: Cequence Energy Ltd. | |
| License Number: 0425941 | |
| License Date: 2010-11-17 | |
| License Status: Amended | |
| Spud Date: 2010-11-29 | |
| Final Drill Date: 2010-12-20 | |
| Well Total Depth: 4446.00 m | |
| Surface Hole Latitude: 54.341906 | |
| Surface Hole Longitude: -117.927944 |
| Date | Event |
|---|---|
| 2010-11-17 | Obtained License |
| 2010-12-01 | Surface Casing Operation Performed |
| 2010-12-04 | Direction Drilling Operation Performed - Horizontal |
| 2010-12-13 | Direction Drilling Operation Performed - Sidetrack Fish |
| 2010-12-16 | Intermediate Casing Operation Performed |
| 2010-12-16 | Well Log Performed |
| 2010-12-20 | Finished Drilling |
| 2010-12-20 | Well Log Performed |
| 2010-12-20 | Well Mode changed to Drilled and Cased |
| 2010-12-22 | Liner Casing Operation Performed |
| 2010-12-23 | Rig Released |
| 2011-01-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-01-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-01-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-01-11 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-01-19 | Well Began Production |
| 2011-01-19 | Well Fluid changed to Gas |
| 2011-01-19 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-12-04 | 2267.00 | Horizontal |
| 2010-12-13 | 2393.00 | Sidetrack fish |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-08 | Multi-Stage Fracture | 4386.80 | 4390.10 | 0 |
| 2011-01-09 | Multi-Stage Fracture | 3396.30 | 3396.40 | 0 |
| 2011-01-09 | Multi-Stage Fracture | 3269.90 | 3270.00 | 0 |
| 2011-01-09 | Multi-Stage Fracture | 3170.20 | 3170.30 | 0 |
| 2011-01-09 | Multi-Stage Fracture | 3083.90 | 3084.00 | 0 |
| 2011-01-10 | Multi-Stage Fracture | 2984.00 | 2984.10 | 0 |
| 2011-01-10 | Multi-Stage Fracture | 2884.20 | 2884.30 | 0 |
| 2011-01-10 | Multi-Stage Fracture | 2706.10 | 2706.20 | 0 |
| 2011-01-11 | Open Hole/Barefoot Completion | 4438.70 | 4446.00 | 0 |
| 2011-01-08 | Multi-Stage Fracture | 4300.40 | 4300.50 | 0 |
| 2011-01-08 | Multi-Stage Fracture | 4200.70 | 4200.80 | 0 |
| 2011-01-08 | Multi-Stage Fracture | 4101.10 | 4101.20 | 0 |
| 2011-01-08 | Multi-Stage Fracture | 4001.60 | 4001.70 | 0 |
| 2011-01-08 | Multi-Stage Fracture | 3901.80 | 3901.90 | 0 |
| 2011-01-09 | Multi-Stage Fracture | 3802.10 | 3802.20 | 0 |
| 2011-01-09 | Multi-Stage Fracture | 3689.60 | 3689.70 | 0 |
| 2011-01-09 | Multi-Stage Fracture | 3536.00 | 3536.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 8088 | 0.0 | 0.0 | 0.0 |
| 2012 | 8303 | 0.0 | 0.0 | 0.0 |
| 2013 | 8664 | 0.0 | 0.0 | 0.0 |
| 2014 | 8735 | 0.0 | 0.0 | 0.0 |
| 2015 | 3336 | 0.0 | 0.0 | 0.0 |
| 2016 | 5064 | 0.0 | 0.0 | 0.0 |
| 2017 | 8327 | 0.0 | 0.0 | 0.0 |
| 2018 | 7727 | 0.0 | 0.0 | 0.0 |
| 2019 | 7703 | 0.0 | 0.0 | 0.0 |
| 2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[6]