X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625271516000

Well Details

Well ID: 0625271516000
Loading map...
Location: 00/16-15-062-27W5/0
Location Alias: 00/16-15-62-27 W5M
Location Alias 2: 00/16-15-062-27 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 27
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: CAL SIMON 16-15-62-27
Operator Name: Cequence Energy Ltd.
License Number: 0421982
License Date: 2010-07-21
License Status: Amended
Spud Date: 2011-01-21
Final Drill Date: 2011-02-13
Well Total Depth: 4260.00 m
Surface Hole Latitude: 54.355470
Surface Hole Longitude: -117.949969

For data sources see[1][2]

Well History

Date Event
2010-07-21 Obtained License
2011-01-21 Well Log Performed
2011-01-23 Surface Casing Operation Performed
2011-01-28 Direction Drilling Operation Performed - Horizontal
2011-02-06 Intermediate Casing Operation Performed
2011-02-13 Finished Drilling
2011-02-13 Well Log Performed
2011-02-13 Well Mode changed to Drilled and Cased
2011-02-15 Liner Casing Operation Performed
2011-02-17 Rig Released
2011-03-09 Perforation Treatment Performed - Open-Hole Completion
2011-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-13 Well Began Production
2011-03-13 Well Fluid changed to Gas
2011-03-13 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-28 2391.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-09 Open Hole/Barefoot Completion 4250.00 4260.00 0
2011-03-12 Multi-Stage Fracture 3367.90 3368.00 0
2011-03-12 Multi-Stage Fracture 3253.20 3253.30 0
2011-03-12 Multi-Stage Fracture 3138.40 3138.50 0
2011-03-12 Multi-Stage Fracture 3041.30 3041.40 0
2011-03-12 Multi-Stage Fracture 2951.10 2951.20 0
2011-03-12 Multi-Stage Fracture 2848.50 2848.60 0
2011-03-10 Multi-Stage Fracture 4199.80 4199.90 0
2011-03-10 Multi-Stage Fracture 4099.10 4099.20 0
2011-03-11 Multi-Stage Fracture 3998.00 3998.10 0
2011-03-11 Multi-Stage Fracture 3896.60 3896.70 0
2011-03-11 Multi-Stage Fracture 3808.30 3808.40 0
2011-03-11 Multi-Stage Fracture 3706.80 3706.90 0
2011-03-11 Multi-Stage Fracture 3606.10 3606.20 0
2011-03-12 Multi-Stage Fracture 3482.40 3482.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5783 0.0 0.0 0.0
2012 8327 0.0 0.0 0.0
2013 7992 0.0 0.0 0.0
2014 8183 0.0 0.0 0.0
2015 5808 0.0 0.0 0.0
2016 3936 0.0 0.0 0.0
2017 5928 0.0 0.0 0.0
2018 6192 0.0 0.0 0.0
2019 1728 0.0 0.0 0.0

For data sources see[6]

References