X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625272605002

Well Details

Well ID: 0625272605002
Loading map...
Location: 00/05-26-062-27W5/2
Location Alias: 00/05-26-62-27 W5M
Location Alias 2: 00/05-26-062-27 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 27
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: RIO ALTO ET AL SIMONETTE 5-26-62-27
Operator Name: Cequence Energy Ltd.
License Number: 0223634
License Date: 1999-06-14
License Status: Suspension
Spud Date: 1999-07-30
Final Drill Date: 1999-10-03
Well Total Depth: 3780.00 m
Surface Hole Latitude: 54.389441
Surface Hole Longitude: -117.950302

For data sources see[1][2]

Well History

Date Event
1998-10-04 Well Log Performed
1999-06-14 Obtained License
1999-08-01 Surface Casing Operation Performed
1999-09-17 Production Casing Operation Performed
1999-10-03 Finished Drilling
1999-10-03 Well Mode changed to Drilled and Cased
1999-10-04 Well Log Performed
1999-10-07 Well Log Performed
1999-10-10 Liner Casing Operation Performed
1999-10-12 Rig Released
1999-11-17 Well Log Performed
1999-11-20 Perforation Treatment Performed - Jet Perforation
1999-11-20 Well Log Performed
1999-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-27 Perforation Treatment Performed - Jet Perforation
1999-11-27 Plug Back Performed
1999-11-27 Well Log Performed
1999-11-27 Well Mode changed to Drilled and Cased
1999-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-02 Plug Back Performed
1999-12-02 Well Mode changed to Abandoned Zone
2001-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-10 Perforation Treatment Performed - Jet Perforation
2001-06-10 Well Log Performed
2001-06-12 Perforation Treatment Performed - Fractured
2001-06-19 Perforation Treatment Performed - Fractured
2001-06-22 Well Log Performed
2018-12-15 Perforation Treatment Performed - Bridge Plug No Cement Required
2018-12-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-11-20 Perforation 3755.00 3758.00 20
2001-06-12 Fracture 2568.50 2580.00 0
2001-06-19 Fracture 2547.00 2558.00 0
2018-12-15 Bridge Plug, No Cement 2539.00 2539.10 0
1999-11-23 Acid Treatment 3755.00 3758.00 0
1999-11-27 Packing Device Capped w/Cement 3710.80 3718.80 0
1999-11-27 Perforation 3677.00 3679.00 20
1999-11-29 Acid Treatment 3677.00 3679.00 0
1999-12-02 Packing Device Capped w/Cement 3636.40 3644.40 0
2001-06-09 Packing Device Capped w/Cement 2692.00 2700.00 0
2001-06-10 Perforation 2547.00 2558.00 17
2001-06-10 Perforation 2568.50 2580.00 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-15 No Incident Encountered 0.00 0.00

For data sources see[5]

References