If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626013413000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.39936,"lon":-118.052859,"icon":""}]} |
| Location: 00/13-34-062-01W6/0 | |
| Location Alias: 00/13-34-62-01 W6M | |
| Location Alias 2: 00/13-34-062-01 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 01 | |
| Section: 34 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: CEQUENCE HZ LATORNLL 13-34-62-1 | |
| Operator Name: Cequence Energy Ltd. | |
| License Number: 0436511 | |
| License Date: 2011-09-02 | |
| License Status: Issued | |
| Spud Date: 2011-10-05 | |
| Final Drill Date: 2011-10-27 | |
| Well Total Depth: 4501.00 m | |
| Surface Hole Latitude: 54.399360 | |
| Surface Hole Longitude: -118.052859 |
| Date | Event |
|---|---|
| 2011-09-02 | Obtained License |
| 2011-10-08 | Surface Casing Operation Performed |
| 2011-10-09 | Well Log Performed |
| 2011-10-14 | Direction Drilling Operation Performed - Horizontal |
| 2011-10-18 | Well Log Performed |
| 2011-10-19 | Intermediate Casing Operation Performed |
| 2011-10-19 | Well Log Performed |
| 2011-10-20 | Well Log Performed |
| 2011-10-27 | Finished Drilling |
| 2011-10-27 | Well Log Performed |
| 2011-10-27 | Well Mode changed to Drilled and Cased |
| 2011-10-30 | Liner Casing Operation Performed |
| 2011-10-30 | Rig Released |
| 2011-11-04 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-11-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-08 | Well Began Production |
| 2011-11-08 | Well Fluid changed to Gas |
| 2011-11-08 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-10-14 | 2303.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-11-04 | Open Hole/Barefoot Completion | 4497.50 | 4501.00 | 0 |
| 2011-11-06 | Multi-Stage Fracture | 3514.50 | 3614.60 | 0 |
| 2011-11-07 | Multi-Stage Fracture | 3400.80 | 3400.90 | 0 |
| 2011-11-07 | Multi-Stage Fracture | 3273.50 | 3273.60 | 0 |
| 2011-11-07 | Multi-Stage Fracture | 3162.20 | 3162.30 | 0 |
| 2011-11-07 | Multi-Stage Fracture | 3034.90 | 3035.00 | 0 |
| 2011-11-07 | Multi-Stage Fracture | 2912.40 | 2912.50 | 0 |
| 2011-11-07 | Multi-Stage Fracture | 2791.80 | 3791.90 | 0 |
| 2011-11-07 | Multi-Stage Fracture | 2658.90 | 2659.00 | 0 |
| 2011-11-05 | Multi-Stage Fracture | 4475.80 | 4475.90 | 0 |
| 2011-11-05 | Multi-Stage Fracture | 4388.30 | 4388.40 | 0 |
| 2011-11-06 | Multi-Stage Fracture | 4290.20 | 4290.30 | 0 |
| 2011-11-06 | Multi-Stage Fracture | 4178.80 | 4178.90 | 0 |
| 2011-11-06 | Multi-Stage Fracture | 4080.60 | 4080.70 | 0 |
| 2011-11-06 | Multi-Stage Fracture | 3969.00 | 3969.10 | 0 |
| 2011-11-06 | Multi-Stage Fracture | 3757.00 | 3757.10 | 0 |
| 2011-11-06 | Multi-Stage Fracture | 3628.80 | 3628.90 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 468 | 0.0 | 0.0 | 0.0 |
| 2012 | 7727 | 0.0 | 0.0 | 0.0 |
| 2013 | 8064 | 0.0 | 0.0 | 0.0 |
| 2014 | 8015 | 0.0 | 0.0 | 0.0 |
| 2015 | 8519 | 0.0 | 0.0 | 0.0 |
| 2016 | 2761 | 0.0 | 0.0 | 0.0 |
| 2017 | 4823 | 0.0 | 0.0 | 0.0 |
| 2018 | 24 | 0.0 | 0.0 | 0.0 |
| 2019 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[6]