X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626032201030

Well Details

Well ID: 0626032201030
Loading map...
Location: 03/01-22-062-03W6/0
Location Alias: 03/01-22-62-03 W6M
Location Alias 2: 03/01-22-062-03 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 03
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH HZ 103 LATOR 1-22-62-3
Operator Name: Strath Resources Ltd.
License Number: 0491355
License Date: 2018-10-09
License Status: Amended
Spud Date: 2018-10-15
Final Drill Date: 2019-01-23
Well Total Depth: 6788.00 m
Surface Hole Latitude: 54.340108
Surface Hole Longitude: -118.353071

For data sources see[1][2]

Well History

Date Event
2018-10-09 Obtained License
2018-10-17 Surface Casing Operation Performed
2019-01-02 Direction Drilling Operation Performed - Deviate
2019-01-08 Intermediate Casing Operation Performed
2019-01-11 Well Log Performed
2019-01-13 Direction Drilling Operation Performed - Horizontal
2019-01-23 Finished Drilling
2019-01-23 Well Mode changed to Drilled and Cased
2019-01-24 Well Log Performed
2019-01-26 Liner Casing Operation Performed
2019-01-27 Well Log Performed
2019-01-28 Well Log Performed
2019-02-21 Rig Released
2019-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-04-01 Well Began Production
2019-04-01 Well Fluid changed to Gas
2019-04-01 Well Mode changed to Flowing
2019-04-11 Well Log Performed
2019-08-01 Well Fluid changed to Gas
2019-08-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-12-26 Precision Drilling Corporation 543 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-02 3105.20 Deviate (5 - 79 degrees)
2019-01-13 3527.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-14 Multi-Stage Fracture 6705.00 6730.00 0
2019-03-17 Multi-Stage Fracture 6273.00 6298.00 0
2019-03-17 Multi-Stage Fracture 6225.00 6250.00 0
2019-03-17 Multi-Stage Fracture 6177.00 6202.00 0
2019-03-17 Multi-Stage Fracture 6123.00 6154.00 0
2019-03-18 Multi-Stage Fracture 6081.00 6106.00 0
2019-03-18 Multi-Stage Fracture 6034.00 6058.00 0
2019-03-19 Multi-Stage Fracture 5985.00 6010.00 0
2019-03-19 Multi-Stage Fracture 5937.00 5961.00 0
2019-03-19 Multi-Stage Fracture 5889.00 5914.00 0
2019-03-20 Multi-Stage Fracture 5841.00 5866.00 0
2019-03-14 Multi-Stage Fracture 6657.00 6682.00 0
2019-03-20 Multi-Stage Fracture 5793.00 5818.00 0
2019-03-20 Multi-Stage Fracture 5745.00 5770.00 0
2019-03-20 Multi-Stage Fracture 5697.00 5722.00 0
2019-03-20 Multi-Stage Fracture 5649.00 5674.00 0
2019-03-21 Multi-Stage Fracture 5601.00 5626.00 0
2019-03-21 Multi-Stage Fracture 5553.00 5578.00 0
2019-03-21 Multi-Stage Fracture 5505.00 5530.00 0
2019-03-21 Multi-Stage Fracture 5457.00 5482.00 0
2019-03-21 Multi-Stage Fracture 5409.00 5434.00 0
2019-03-22 Multi-Stage Fracture 5361.00 5386.00 0
2019-03-15 Multi-Stage Fracture 6609.00 6634.00 0
2019-03-22 Multi-Stage Fracture 5313.00 5338.00 0
2019-03-22 Multi-Stage Fracture 5265.00 5290.00 0
2019-03-23 Multi-Stage Fracture 5217.00 5242.00 0
2019-03-23 Multi-Stage Fracture 5169.00 5194.00 0
2019-03-23 Multi-Stage Fracture 5121.00 5146.00 0
2019-03-23 Multi-Stage Fracture 5073.00 5098.00 0
2019-03-23 Multi-Stage Fracture 5025.00 5050.00 0
2019-03-24 Multi-Stage Fracture 4977.00 5002.00 0
2019-03-24 Multi-Stage Fracture 4929.00 4954.00 0
2019-03-24 Multi-Stage Fracture 4881.00 4906.00 0
2019-03-15 Multi-Stage Fracture 6561.00 6586.00 0
2019-03-24 Multi-Stage Fracture 4833.00 4858.00 0
2019-03-24 Multi-Stage Fracture 4785.00 4810.00 0
2019-03-25 Multi-Stage Fracture 4737.00 4762.00 0
2019-03-25 Multi-Stage Fracture 4689.00 4714.00 0
2019-03-25 Multi-Stage Fracture 4641.00 4666.00 0
2019-03-26 Multi-Stage Fracture 4593.00 4618.00 0
2019-03-26 Multi-Stage Fracture 4545.00 4570.00 0
2019-03-26 Multi-Stage Fracture 4497.00 4522.00 0
2019-03-26 Multi-Stage Fracture 4449.00 4474.00 0
2019-03-27 Multi-Stage Fracture 4401.00 4426.00 0
2019-03-15 Multi-Stage Fracture 6513.00 6538.00 0
2019-03-27 Multi-Stage Fracture 4305.00 4330.00 0
2019-03-27 Multi-Stage Fracture 4257.00 4282.00 0
2019-03-27 Multi-Stage Fracture 4209.00 4234.00 0
2019-03-27 Multi-Stage Fracture 4161.00 4186.00 0
2019-03-27 Multi-Stage Fracture 4113.00 4138.00 0
2019-03-28 Multi-Stage Fracture 4065.00 4090.00 0
2019-03-28 Multi-Stage Fracture 4017.00 4042.00 0
2019-03-28 Multi-Stage Fracture 3963.00 3994.00 0
2019-03-28 Multi-Stage Fracture 3921.00 3946.00 0
2019-03-29 Multi-Stage Fracture 3873.00 3898.00 0
2019-03-16 Multi-Stage Fracture 6465.00 6490.00 0
2019-03-29 Multi-Stage Fracture 3825.00 3850.00 0
2019-03-29 Multi-Stage Fracture 3777.00 3802.00 0
2019-03-29 Multi-Stage Fracture 3681.00 3706.00 0
2019-03-29 Multi-Stage Fracture 3729.00 3754.00 0
2019-03-30 Multi-Stage Fracture 3585.00 3610.00 0
2019-03-16 Multi-Stage Fracture 6417.00 6442.00 0
2019-03-16 Multi-Stage Fracture 6369.00 6394.00 0
2019-03-16 Multi-Stage Fracture 6321.00 6346.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6131 0.0 0.0 0.0
2020 2005 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-21 No Incident Encountered 0.00 0.00
2019-04-01 No Incident Encountered 0.00 0.00

For data sources see[8]

References