X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626050205002

Well Details

Well ID: 0626050205002
Loading map...
Location: 00/05-02-062-05W6/2
Location Alias: 00/05-02-62-05 W6M
Location Alias 2: 00/05-02-062-05 W6/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 05
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG KAKWA 5-2-62-5
Operator Name: Jupiter Resources Inc.
License Number: 0291206
License Date: 2003-08-12
License Status: Amended
Spud Date: 2003-08-21
Final Drill Date: 2003-09-30
Well Total Depth: 3160.00 m
Surface Hole Latitude: 54.330648
Surface Hole Longitude: -118.648076

For data sources see[1][2]

Well History

Date Event
2003-08-12 Obtained License
2003-08-21 Lost Circulation Occurred
2003-08-24 Surface Casing Operation Performed
2003-09-11 Drill Stem Test Performed
2003-09-14 Well Log Performed
2003-09-15 Production Casing Operation Performed
2003-09-30 Finished Drilling
2003-09-30 Well Mode changed to Drilled and Cased
2003-10-01 Well Log Performed
2003-10-03 Liner Casing Operation Performed
2003-10-06 Rig Released
2003-10-24 Well Log Performed
2003-10-27 Perforation Treatment Performed - Jet Perforation
2003-10-27 Well Log Performed
2003-10-30 Perforation Treatment Performed - Fractured
2003-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-09 Plug Back Performed
2003-11-09 Well Log Performed
2003-11-10 Perforation Treatment Performed - Jet Perforation
2003-11-10 Well Log Performed
2003-11-18 Perforation Treatment Performed - Fractured
2003-11-22 Perforation Treatment Performed - Jet Perforation
2003-11-22 Well Log Performed
2003-11-23 Well Log Performed
2003-11-25 Perforation Treatment Performed - Fractured
2003-11-29 Perforation Treatment Performed - Fractured
2003-12-17 Well Began Production
2003-12-17 Well Fluid changed to Gas
2003-12-17 Well Mode changed to Flowing
2007-01-24 Well Log Performed
2007-01-27 Well Fluid changed to Gas
2007-01-27 Well Mode changed to Flowing
2007-08-26 Perforation Treatment Performed - Chemical Squeeze
2007-11-08 Perforation Treatment Performed - Jet Perforation
2007-11-08 Well Log Performed
2007-11-12 Perforation Treatment Performed - Fractured
2007-11-13 Well Log Performed
2007-11-19 Perforation Treatment Performed - Jet Perforation
2007-11-19 Well Log Performed
2007-11-20 Well Log Performed
2007-11-21 Perforation Treatment Performed - Fractured
2007-11-24 Perforation Treatment Performed - Jet Perforation
2007-11-24 Well Log Performed
2007-11-26 Perforation Treatment Performed - Fractured
2008-01-02 Well Fluid changed to Gas
2008-01-02 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-10-27 Perforation 3130.30 3133.30 17
2007-08-26 Chemical Squeeze 3005.00 3007.00 0
2007-11-08 Perforation 2934.70 2935.20 10
2007-11-08 Perforation 2926.50 2927.00 10
2007-11-08 Perforation 2920.50 2921.00 10
2007-11-08 Perforation 2917.00 2917.50 10
2007-11-12 Fracture 2934.70 2935.20 0
2007-11-12 Fracture 2917.00 2927.00 0
2007-11-19 Perforation 2680.50 2681.00 10
2007-11-19 Perforation 2675.50 2676.00 10
2007-11-19 Perforation 2671.00 2671.50 10
2003-10-30 Fracture 3130.30 3133.30 0
2007-11-19 Perforation 2665.50 2666.00 10
2007-11-21 Fracture 2665.50 2681.00 0
2007-11-24 Perforation 2450.00 2450.50 10
2007-11-24 Perforation 2435.00 2435.50 10
2007-11-24 Perforation 2431.00 2431.50 10
2007-11-24 Perforation 2425.50 2426.00 10
2007-11-24 Perforation 2424.00 2424.50 10
2007-11-24 Perforation 1972.50 1973.00 10
2007-11-24 Perforation 1964.00 1964.50 10
2007-11-26 Fracture 2424.00 2450.50 0
2003-11-09 Packing Device Capped w/Cement 3114.00 3122.00 0
2007-11-26 Fracture 1964.00 1973.00 0
2003-11-10 Perforation 3005.00 3007.00 17
2003-11-18 Fracture 3005.00 3007.00 0
2003-11-22 Perforation 2827.00 2829.00 17
2003-11-22 Perforation 2774.00 2776.00 17
2003-11-25 Fracture 2827.00 2829.00 0
2003-11-29 Fracture 2774.00 2776.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 221 0.0 0.0 0.0
2004 7206 0.0 0.0 0.0
2005 8038 0.0 0.0 0.0
2006 8380 0.0 0.0 0.0
2007 6264 0.0 0.0 0.0
2008 6464 0.0 0.0 0.0
2009 5357 0.0 0.0 0.0
2010 7462 0.0 0.0 0.0
2011 6192 0.0 0.0 0.0
2012 8353 0.0 0.0 0.0
2013 8279 0.0 0.0 0.0
2014 8113 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8520 0.0 0.0 0.0
2017 8327 0.0 0.0 0.0
2018 7849 0.0 0.0 0.0
2019 8352 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2003-08-21 Lost Circulation 276.00 383.00

For data sources see[6]

References