X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0626050402004

Well Details

Well ID: 0626050402004
Loading map...
Location: 00/02-04-062-05W6/4
Location Alias: 00/02-04-62-05 W6M
Location Alias 2: 00/02-04-062-05 W6/04
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 05
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG KAKWA 2-4-62-5
Operator Name: Jupiter Resources Inc.
License Number: 0399191
License Date: 2008-07-31
License Status: Issued
Spud Date: 2008-09-01
Final Drill Date: 2008-10-03
Well Total Depth: 3739.00 m
Surface Hole Latitude: 54.326428
Surface Hole Longitude: -118.684570

For data sources see[1][2]

Well History

Date Event
2008-01-15 Well Log Performed
2008-01-16 Well Log Performed
2008-01-24 Well Log Performed
2008-01-25 Well Log Performed
2008-01-26 Well Log Performed
2008-07-31 Obtained License
2008-09-02 Direction Drilling Operation Performed - Deviate
2008-09-05 Surface Casing Operation Performed
2008-09-12 Intermediate Casing Operation Performed
2008-10-03 Finished Drilling
2008-10-03 Well Mode changed to Drilled and Cased
2008-10-04 Well Log Performed
2008-10-05 Production Casing Operation Performed
2008-10-06 Rig Released
2008-12-21 Well Log Performed
2008-12-28 Perforation Treatment Performed - Jet Perforation
2008-12-28 Well Log Performed
2009-01-11 Perforation Treatment Performed - Fractured
2009-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-15 Plug Back Performed
2009-01-16 Perforation Treatment Performed - Jet Perforation
2009-01-21 Perforation Treatment Performed - Fractured
2009-01-21 Well Fluid changed to Gas
2009-01-21 Well Mode changed to Testing
2009-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-25 Plug Back Performed
2009-01-26 Perforation Treatment Performed - Jet Perforation
2009-01-31 Perforation Treatment Performed - Fractured
2009-02-02 Well Log Performed
2009-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-03 Perforation Treatment Performed - Jet Perforation
2009-02-03 Plug Back Performed
2009-02-03 Well Log Performed
2009-02-04 Perforation Treatment Performed - Fractured
2009-02-04 Well Log Performed
2009-02-05 Perforation Treatment Performed - Fractured
2009-02-05 Perforation Treatment Performed - Jet Perforation
2009-02-05 Well Log Performed
2009-02-06 Perforation Treatment Performed - Fractured
2009-02-06 Perforation Treatment Performed - Jet Perforation
2009-02-07 Perforation Treatment Performed - Fractured
2009-02-07 Perforation Treatment Performed - Jet Perforation
2009-02-07 Well Log Performed
2009-02-08 Perforation Treatment Performed - Fractured
2009-02-08 Perforation Treatment Performed - Jet Perforation
2009-02-08 Well Log Performed
2009-02-09 Perforation Treatment Performed - Fractured
2009-02-09 Perforation Treatment Performed - Jet Perforation
2009-02-09 Well Log Performed
2009-02-10 Perforation Treatment Performed - Fractured
2009-02-11 Perforation Treatment Performed - Fractured
2009-02-11 Perforation Treatment Performed - Jet Perforation
2009-02-11 Well Log Performed
2009-02-19 Well Began Production
2009-02-19 Well Fluid changed to Gas
2009-02-19 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-09-02 147.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-12-28 Perforation 3682.00 3682.50 5
2009-01-16 Perforation 3607.50 3608.00 5
2009-01-16 Perforation 3610.00 3610.50 5
2009-01-21 Fracture 3570.50 3610.50 0
2009-01-25 Packing Device Capped w/Cement 3554.80 3562.80 0
2009-01-26 Perforation 3507.50 3508.50 10
2009-01-26 Perforation 3510.50 3511.50 10
2009-01-26 Perforation 3515.50 3516.00 5
2009-01-26 Perforation 3518.50 3519.00 5
2009-01-26 Perforation 3523.00 3523.50 5
2009-01-26 Perforation 3528.00 3528.50 5
2008-12-28 Perforation 3689.50 3690.50 10
2009-01-26 Perforation 3536.50 3537.00 5
2009-01-31 Fracture 3507.50 3537.00 0
2009-02-03 Packing Device Capped w/Cement 3486.80 3494.80 0
2009-02-03 Perforation 3263.00 3263.50 10
2009-02-03 Perforation 3277.50 3278.50 10
2009-02-03 Perforation 3300.00 3301.00 10
2009-02-03 Perforation 3306.00 3306.50 10
2009-02-03 Perforation 3325.50 3326.00 10
2009-02-04 Fracture 3263.00 3326.00 0
2009-02-05 Perforation 3156.50 3157.50 5
2008-12-28 Perforation 3691.50 3692.00 5
2009-02-05 Perforation 3170.50 3171.50 10
2009-02-05 Perforation 3188.50 3189.50 5
2009-02-05 Fracture 3156.50 3189.50 0
2009-02-05 Perforation 3086.00 3086.50 10
2009-02-05 Fracture 3086.00 3086.50 0
2009-02-06 Perforation 3012.50 3013.50 15
2009-02-06 Fracture 3012.00 3013.50 0
2009-02-06 Perforation 2851.00 2852.00 5
2009-02-06 Perforation 2894.50 2895.00 10
2009-02-06 Perforation 2897.00 2897.50 10
2009-01-11 Fracture 3682.00 3692.00 0
2009-02-06 Perforation 2908.50 2909.00 10
2009-02-06 Fracture 2851.00 2909.00 0
2009-02-06 Perforation 2994.00 2996.00 15
2009-02-07 Fracture 2994.00 2996.00 0
2009-02-07 Perforation 2792.50 2793.50 15
2009-02-07 Perforation 2805.50 2806.50 15
2009-02-08 Fracture 2792.50 2806.50 0
2009-02-08 Perforation 2755.00 2756.00 15
2009-02-08 Perforation 2745.50 2746.50 15
2009-02-09 Fracture 2745.50 2746.00 0
2009-01-15 Packing Device Capped w/Cement 3664.90 3672.90 0
2009-02-09 Perforation 2539.50 2540.50 10
2009-02-09 Perforation 2530.00 2530.50 10
2009-02-09 Perforation 2523.00 2523.50 10
2009-02-09 Perforation 2520.50 2521.00 10
2009-02-09 Perforation 2506.50 2507.00 10
2009-02-09 Perforation 2501.50 2502.00 10
2009-02-10 Fracture 2501.50 2540.50 0
2009-02-11 Perforation 2029.00 2030.00 10
2009-02-11 Perforation 2005.50 2006.50 10
2009-02-11 Fracture 2005.50 2030.00 0
2009-01-16 Perforation 3570.50 3571.00 5
2009-01-16 Perforation 3576.50 3577.00 5
2009-01-16 Perforation 3592.00 3593.00 10
2009-01-16 Perforation 3600.50 3601.00 5

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6768 0.0 0.0 0.0
2010 7409 0.0 0.0 0.0
2011 7210 0.0 0.0 0.0
2012 8482 0.0 0.0 0.0
2013 8652 0.0 0.0 0.0
2014 8629 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8682 0.0 0.0 0.0
2017 8375 0.0 0.0 0.0
2018 7731 0.0 0.0 0.0
2019 5354 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References