If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626050508022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.317939,"lon":-118.677638,"icon":""}]} |
| Location: 02/08-05-062-05W6/2 | |
| Location Alias: 02/08-05-62-05 W6M | |
| Location Alias 2: 02/08-05-062-05 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 05 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: JUPITER 102 HZ KAKWA 10-33-61-5 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0443152 | |
| License Date: 2012-01-20 | |
| License Status: Amended | |
| Spud Date: 2012-04-12 | |
| Final Drill Date: 2012-05-11 | |
| Well Total Depth: 4015.00 m | |
| Surface Hole Latitude: 54.317939 | |
| Surface Hole Longitude: -118.677638 |
| Date | Event |
|---|---|
| 2012-01-20 | Obtained License |
| 2012-04-13 | Direction Drilling Operation Performed - Deviate |
| 2012-04-15 | Surface Casing Operation Performed |
| 2012-04-21 | Direction Drilling Operation Performed - Horizontal |
| 2012-04-23 | Intermediate Casing Operation Performed |
| 2012-04-29 | Direction Drilling Operation Performed - Sidetrack Fish |
| 2012-05-11 | Finished Drilling |
| 2012-05-11 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-05-11 | Well Mode changed to Drilled and Cased |
| 2012-05-13 | Liner Casing Operation Performed |
| 2012-05-15 | Rig Released |
| 2012-06-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-07-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-07-01 | Well Began Production |
| 2012-07-01 | Well Fluid changed to Crude Oil |
| 2012-07-01 | Well Mode changed to Flowing |
| 2012-07-02 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-04-13 | 186.34 | Deviate (5 - 79 degrees) |
| 2012-04-21 | 2133.00 | Horizontal |
| 2012-04-29 | 2515.00 | Sidetrack fish |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-05-11 | Open Hole/Barefoot Completion | 4000.00 | 4015.00 | 0 |
| 2012-07-01 | Multi-Stage Fracture | 3173.50 | 3174.80 | 0 |
| 2012-07-01 | Multi-Stage Fracture | 3059.90 | 3061.10 | 0 |
| 2012-07-02 | Multi-Stage Fracture | 2958.30 | 2959.30 | 0 |
| 2012-07-02 | Multi-Stage Fracture | 2856.70 | 2857.90 | 0 |
| 2012-07-02 | Multi-Stage Fracture | 2743.00 | 2744.30 | 0 |
| 2012-07-02 | Multi-Stage Fracture | 2641.40 | 2642.70 | 0 |
| 2012-07-02 | Multi-Stage Fracture | 2539.90 | 2541.10 | 0 |
| 2012-07-02 | Multi-Stage Fracture | 2438.30 | 2439.50 | 0 |
| 2012-07-02 | Multi-Stage Fracture | 2324.60 | 2325.80 | 0 |
| 2012-07-02 | Multi-Stage Fracture | 2211.00 | 2212.20 | 0 |
| 2012-06-25 | Multi-Stage Fracture | 3974.50 | 3976.50 | 0 |
| 2012-07-01 | Multi-Stage Fracture | 3907.90 | 3909.10 | 0 |
| 2012-07-01 | Multi-Stage Fracture | 3794.20 | 3795.40 | 0 |
| 2012-07-01 | Multi-Stage Fracture | 3692.60 | 3693.80 | 0 |
| 2012-07-01 | Multi-Stage Fracture | 3591.00 | 3592.20 | 0 |
| 2012-07-01 | Multi-Stage Fracture | 3477.50 | 3478.70 | 0 |
| 2012-07-01 | Multi-Stage Fracture | 3376.60 | 3377.80 | 0 |
| 2012-07-01 | Multi-Stage Fracture | 3275.00 | 3276.20 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1847 | 0.0 | 0.0 | 0.0 |
| 2013 | 3172 | 0.0 | 0.0 | 0.0 |
| 2014 | 7085 | 0.0 | 0.0 | 0.0 |
| 2015 | 5393 | 0.0 | 0.0 | 0.0 |
| 2016 | 5137 | 0.0 | 0.0 | 0.0 |
| 2017 | 6889 | 0.0 | 0.0 | 0.0 |
| 2018 | 6618 | 0.0 | 0.0 | 0.0 |
| 2019 | 5880 | 0.0 | 0.0 | 0.0 |
| 2020 | 1871 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-07-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]