If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626051916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.37873,"lon":-118.752309,"icon":""}]} |
| Location: 00/16-19-062-05W6/0 | |
| Location Alias: 00/16-19-62-05 W6M | |
| Location Alias 2: 00/16-19-062-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 19 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: HARVEST KAKWA 16-19-62-5 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0470735 | |
| License Date: 2014-10-17 | |
| License Status: Issued | |
| Spud Date: 2015-01-02 | |
| Final Drill Date: 2015-01-30 | |
| Well Total Depth: 4595.00 m | |
| Surface Hole Latitude: 54.378730 | |
| Surface Hole Longitude: -118.752309 |
| Date | Event |
|---|---|
| 2014-10-17 | Obtained License |
| 2015-01-03 | Surface Casing Operation Performed |
| 2015-01-10 | Intermediate Casing Operation Performed |
| 2015-01-11 | Well Log Performed |
| 2015-01-13 | Direction Drilling Operation Performed - Deviate |
| 2015-01-18 | Direction Drilling Operation Performed - Horizontal |
| 2015-01-30 | Finished Drilling |
| 2015-01-30 | Well Log Performed |
| 2015-01-30 | Well Mode changed to Drilled and Cased |
| 2015-02-01 | Well Fluid changed to Gas |
| 2015-02-01 | Well Mode changed to Testing |
| 2015-02-03 | Perforation Treatment Performed - Open-Hole Completion |
| 2015-02-03 | Production Casing Operation Performed |
| 2015-02-05 | Rig Released |
| 2015-02-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-23 | Well Began Production |
| 2015-03-23 | Well Fluid changed to Gas |
| 2015-03-23 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-01-02 | Precision Drilling Corporation | PD407 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-01-13 | 2233.70 | Deviate (5 - 79 degrees) |
| 2015-01-18 | 3232.80 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-02-03 | Open Hole/Barefoot Completion | 4577.00 | 4595.00 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 3997.30 | 3997.80 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 3938.10 | 3938.60 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 3865.50 | 3866.00 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 3806.60 | 3807.10 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 3733.90 | 3734.40 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 3675.30 | 3675.80 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 3590.70 | 3591.20 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 3532.40 | 3532.90 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 3473.20 | 3473.70 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 3414.00 | 3414.50 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 4546.20 | 4550.80 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 4487.00 | 4487.50 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 4415.20 | 4415.70 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 4359.80 | 4360.30 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 4275.90 | 4276.40 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 4216.90 | 4217.40 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 4143.60 | 4144.10 | 0 |
| 2015-02-23 | Multi-Stage Fracture | 4084.70 | 4085.20 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-02-23 | 2015-02-23 | 2,988 | 4,452 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 80.3274 | N/A | |||
| 30/50 Prime Plus | Calfrac | Quartz | 14808-60-7 | 100 | 1.8256 | N/A | ||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 15.41 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0131 | N/A | |
| Water | 7732-18-5 | 100 | 0.0135 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0756 | N/A | |
| DWP-937 | Calfrac | Demulsifier | Citrus terpenes | 94266-47-4 | 100 | 0.081 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0817 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.081 | N/A | ||||
| Triethylene glycol | 112-27-6 | 100 | 0.0817 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0814 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 2.7456 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0902 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-02-12 | 2015-02-23 | Surface Water - River | 3300 |
| 2015-02-11 | 2015-02-12 | Recycled Fracturing Water (treated at well site) | 1521 |
| 2015-02-22 | 2015-02-23 | Municipal Water | 270 |
| 2015-02-22 | 2015-02-22 | Recycled Fracturing Water (treated at well site) | 32 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 6676 | 0.0 | 0.0 | 0.0 |
| 2016 | 7194 | 0.0 | 0.0 | 0.0 |
| 2017 | 1748 | 0.0 | 0.0 | 0.0 |
| 2018 | 8714 | 0.0 | 0.0 | 0.0 |
| 2019 | 8648 | 0.0 | 0.0 | 0.0 |
| 2020 | 1836 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-02-06 | No Incident Encountered | 0.00 | 0.00 |
| 2015-03-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]