If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0626052013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.368984,"lon":-118.708706,"icon":""}]} |
| Location: 00/13-20-062-05W6/0 | |
| Location Alias: 00/13-20-62-05 W6M | |
| Location Alias 2: 00/13-20-062-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 062 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 20 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TOURMALINE HZ KAKWA 13-20-62-5 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0442075 | |
| License Date: 2011-12-28 | |
| License Status: Issued | |
| Spud Date: 2012-07-11 | |
| Final Drill Date: 2012-08-16 | |
| Well Total Depth: 4500.00 m | |
| Surface Hole Latitude: 54.368984 | |
| Surface Hole Longitude: -118.708706 |
| Date | Event |
|---|---|
| 2011-12-28 | Obtained License |
| 2012-07-14 | Surface Casing Operation Performed |
| 2012-07-17 | Lost Circulation Occurred |
| 2012-07-20 | Intermediate Casing Operation Performed |
| 2012-07-26 | Direction Drilling Operation Performed - Deviate |
| 2012-08-01 | Direction Drilling Operation Performed - Horizontal |
| 2012-08-16 | Finished Drilling |
| 2012-08-16 | Well Mode changed to Drilled and Cased |
| 2012-08-20 | Production Casing Operation Performed |
| 2012-08-21 | Rig Released |
| 2012-09-08 | Well Log Performed |
| 2012-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-19 | Well Began Production |
| 2012-09-19 | Well Fluid changed to Gas |
| 2012-09-19 | Well Mode changed to Flowing |
| 2017-09-29 | Well Fluid changed to Gas |
| 2017-09-29 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-07-11 | Patterson-UTI Drilling Co. Canada | 15 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-07-26 | 2627.90 | Deviate (5 - 79 degrees) |
| 2012-08-01 | 3072.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-09-18 | Multi-Stage Fracture | 4473.00 | 4473.10 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 3909.00 | 3909.10 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 3841.00 | 3841.10 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 3773.00 | 3773.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 3718.00 | 3718.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 3650.00 | 3650.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 3582.00 | 3582.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 3527.00 | 3527.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 3489.00 | 3489.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 3391.00 | 3391.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 3335.00 | 3335.10 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 4415.00 | 4415.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 3280.00 | 3280.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 3225.00 | 3225.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 3183.00 | 3183.10 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 4347.00 | 4347.10 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 4279.00 | 4279.10 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 4224.00 | 4224.10 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 4156.00 | 4156.10 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 4088.00 | 4088.10 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 4032.00 | 4032.10 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 3965.00 | 3965.10 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1852 | 0.0 | 0.0 | 0.0 |
| 2013 | 8548 | 0.0 | 0.0 | 0.0 |
| 2014 | 8036 | 0.0 | 0.0 | 0.0 |
| 2015 | 8453 | 0.0 | 0.0 | 0.0 |
| 2016 | 8765 | 0.0 | 0.0 | 0.0 |
| 2017 | 6996 | 0.0 | 0.0 | 0.0 |
| 2018 | 7803 | 0.0 | 0.0 | 0.0 |
| 2019 | 8529 | 0.0 | 0.0 | 0.0 |
| 2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-07-17 | Lost Circulation | 1197.00 | 1197.00 |
| 2012-10-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]